36C24218B0565 0001 S02 - Dwg_528A5-18-508 Provide Security Required Upgrades B9_N20 - Revised1.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24218B0565-0002000.docx | DOCX document | |
| 36C24218B0565-0002001.pdf | ||
| 36C24218B0565-0001002.pdf | ||
| 36C24218B0565-0001000.docx | DOCX document | |
| 36C24218B0565-002.docx | DOCX document | |
| 36C24218B0565-005.pdf | ||
| 36C24218B0565-004.pdf | ||
| 36C24218B0565-003.pdf | ||
| 36C24218B0565-001.docx | DOCX document | |
| 36C24218B0565-000.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date:
NOTE:
USERS OF THESE DRAWINGS ARE RESPONSIBLE FOR VERIFYING
EXISTING DIMENSIONS AND CONDITIONS IN THE FIELD
o n e e i g h t h i n c h o n e f o o t t h r e e i n c h e s e f o o t o n e a n d o n e h a l f i n c h e s e f o o t o n e i n c e f o o t t h r e e q u a r t e r s i n c e f o o t o n e h a l f i n c e f o o t t h r e e e i g h t h s i n c e f o o t o n e q u a r t e r i n c e f o o t
BUILDING 20 - POLICE HEADQUARTERS - ARMORY SECURITY WINDOW
PLAN (NEW CONSTRUCTION) - KEYNOTES. (TYPICAL).
SYMBOL DESCRIPTION
INSTALL EXPANDED METAL TO EACH WINDOW. TACK WELD TO EXISTING STEEL FLAT STOCK
ON THE WINDOW CASING. PAINT BOTH SIDES OF EXPANDED METAL WITH AN OIL-BASED
PAINT TO MATCH WALLS.
N20 of 19
NOTES AND SCHEDULES.
BUILDING 20 - POLICE HEADQUARTERS - ARMORY NEW CONSTRUCTION
PLAN - KEYNOTES
SYMBOL DESCRIPTION
BUILD EVIDENCE ROOM WITHIN 3 INCHES OF EXISTING NORTH
WINDOW.
INSTALL 3'-0" STEEL DOORS, STEELE FRAMES, HARDWARE, DOOR
HANDLES, LOCKS AND ELECTRICAL DOOR SENSOR.
INSTALL AND MAKE ALL CONNECTIONS. PROVIDE AND INSTALL A
FULLY FUNCTIONAL SECURITY AND MONITOR SYSTEM. INSTALL
SECURITY PANEL. COMPLETE INSTALLATION FOR FULLY FUNCTIONAL
KEYPAD, DETECTION AND ALARM SYSTEM. KEYPAD SHALL INCLUDE
BACK-LIGHTED KEYPAD, 2-WAY INTERCOM COMMUNICATION AND VIDEO
CONTROLLED AND MONITORED BY BUILDING 37-DISPATCH
DEPARTMENT. KEYPAD PANEL SHALL DETECT INTRUSION INTRO
ARMORY FROM ARMORY DOOR. KEYPAD SHALL INCLUDE A
COUNTDOWN TIMER OF 2 MINUTES TO ACTIVATE AUDIBLE ALARM IN
BUILDING 20 AND A VISUAL ALARM IN BUILDING 37 DISPATCH. ALARM
SHALL AUTOMATICALLY ACTIVATE AUDIO/VIDEO INTERCOM SYSTEM
WITH BUILDING 37 DISPATCH. DISARM OF ALARM SHALL BE KEYPAD
INPUT OF AN EMPLOYEE NUMBER. SYSTEM SHALL ALLOW MULTIPLE
EMPLOYEE NUMBER INPUT TO DISARM SYSTEM.
INSTALL EXISTING PASS-THROUGH EVIDENCE-LOCKER SUPPLIED BY THE
VAMC POLICE DEPARTMENT. INSTALL FOR SIDE FACING ARMORY TO BE
FLUSH WITH NEW SHEETROCK.
INSTALL EXPANDED METAL PERIMETER WALLS.
ENCASE EXPANDED METAL IN SHEETROCK. FINISH WALL TO SMOOTH FINISH.
INSTALL INSPECTION PORT TO MAKE EXPANDED METAL VISIBLE PER
SPECIFICATION.
INSTALL THREE EQUALLY SPACED INSPECTION PORTS ACROSS WALL.
INSTALL BLANKING PANEL TO OBSCURE VIEW ON EVIDENCE ROOM SIDE TO
PREVENT VISIBILITY INTO THE EVIDENCE ROOM FROM ROOM 22.
CONTINUE EXPANDED METAL PERIMETER TO COVER WINDOW, NO STUDS
BLOCKING WINDOW.
PROVIDE AND INSTALL 13" X 24" HIGH OUTPUT LED FIXTURE. INSTALL NEW
CIRCUIT, INSTALL MOTION DETECTOR AND MANUAL TOGGLE SWITCH
OVERRIDE TO ACTIVATE LIGHT. CONTRACTOR SHALL SOURCE ALL POWER
AND INSTALL NEW BREAKER(S).
BUILDING 20 - POLICE HEADQUARTERS - ARMORY DEMO PLAN -
KEYNOTES
SYMBOL DESCRIPTION
REMOVE WALLBOARD TO STRUCTURE, PER SPECIFICATION. (TYPICAL).
DEMO WALLS, REMOVE WALLBOARD AND STUDS TO PROVIDE OPEN SPACE.
FINISH INTERIOR WALLS, PATCH, PAINT TO MATCH PER SPECIFICATION..
BUILDING 20 - POLICE HEADQUARTERS - ARMORY, NEW FLOORING PLAN
- KEYNOTES
SYMBOL DESCRIPTION
PREPARE FLOOR, LEVEL, AND INSTALL NEW SUB-FLOOR.
INSTALL INDUSTRIAL-GRADE, RUBBER, RAISE-COIN FLOOR COVERING.
INSTALL INDUSTRIAL-GRADE, RUBBER, RAISE-COIN STAIR TREADS.
REFERENCE THE DRAWING:
F20D1 BUILDING 20 - POLICE HEADQUARTERS - ARMORY DEMO PLAN
REFERENCE THE DRAWING:
F20D1 BUILDING 20 - POLICE HEADQUARTERS - ARMORY SECURITY WINDOW PLAN
(NEW CONSTRUCTION)
REFERENCE THE DRAWING:
F20F1 BUILDING 20 - POLICE HEADQUARTERS - ARMORY, NEW FLOORING PLAN
BUILDING 20 - POLICE HEADQUARTERS - ARMORY PLAN (NEW
CONSTRUCTION) - KEYNOTES. (TYPICAL).
SYMBOL DESCRIPTION
FINISH SHEETROCK, PATCH AND PAINT TO MATCH EXISTING WALLS.
PAINT EXPANDED METAL AT INSPECTION PORTS. COLOR SHALL BE
BRIGHT ORANGE.
PAINT EXPANDED METAL FLOOR TO CEILING. COLOR SHALL BE
BRIGHT ORANGE. EXPANDED METAL SHALL BE EXPOSED AND VISIBLE
ON EVIDENCE ROOM SIDE. ALL INTERIOR WALLS OF EVIDENCE ROOM
SHALL HAVE EXPOSED EXPANDED METAL PAINTED BRIGHT ORANGE.
PAINT DOORS ANF FRAMES (ALL SURFACES) WITH A MINIMUM OF 2
COATS OF RED OIL BASE..
INSALL DECAL TO ARMORY DOOR. DECAL APPLIED TO SIDE FACING
ROOM 22.
BUILDING 11 - WAREHOUSE, GROUND FLOOR PLAN - CAMERA AND
MONITOR LOCATIONS.
SYMBOL DESCRIPTION
INSTALL AND CONNECT NEW CAMERA TO FACILITY-WIDE SECURITY SYSTEM
MONITORED IN LOCAL BUILDING AND FROM BUILDING 37 DISPATCH.
(TYPICAL).
REFERENCE THE DRAWING:
F11G BUILDING 11 - WAREHOUSE, GROUND FLOOR PLAN - CAMERA AND MONITOR
LOCATIONS.
G
S d w g N
P
M
REFERENCE THE DRAWING:
F20D1 BUILDING 20 - POLICE HEADQUARTERS - ARMORY DEMO PLAN
REFERENCE THE DRAWING:
F20D1 BUILDING 20 - POLICE HEADQUARTERS - ARMORY DEMO PLAN
1 2
BUILDING 20 - POLICE HEADQUARTERS, BASEMENT AND
SECOND FLOOR PLAN, SECURITY UPGRADES AND CAMERA
LOCATIONS.
SYMBOL DESCRIPTION
INSTALL AND CONNECT NEW CAMERA TO FACILITY-WIDE SECURITY SYSTEM
MONITORED IN LOCAL BUILDING AND FROM BUILDING 37 DISPATCH.
(TYPICAL).
REFERENCE THE DRAWING:
F20GB BUILDING 20 - POLICE HEADQUARTERS - FIRST LEVEL PLAN
1 2
REFERENCE THE DRAWING:
F20GB BUILDING 20 - POLICE HEADQUARTERS - SECOND LEVEL PLAN
VHACANBERGMR
Text Box
VHACANBERGMR
Text Box
VHACANBERGMR
Text Box
VHACANBERGMR
Text Box
VHACANBERGMR
Text Box
VHACANBERGMR
Text Box
VHACANBERGMR
Text Box
VHACANBERGMR
Text Box
VHACANBERGMR
Text Box
VHACANBERGMR
Text Box
| 1.1-3.G001.S1-G001 |
| 2.1-3.G001.S1-S1 |
| 3.1-3.G001.S1-N9 |
| 4.1-3.G001.S1-N20 |
| 5.1-3.G001.S1-N37 |
| 6.4-5.B9-F9A |
| 7.4-5.B9-F9B |
| 8.6.B11-F11G |
| 9.7.B20-F20GB |
| 10.7.B20-F20D1 |
| 11.B20-F20F1 |
| 12.8-10.Building37RenewedRev1-F37G |
| 13.8-10.Building37RenewedRev1-E37 |
| 14.8-10.Building37RenewedRev1-D37 |
| 15.8-10.Building37RenewedRev1-F37D |
| 16.8-10.Building37RenewedRev1-F37N |
| 11-13.VluePrints.Historic.pdf |
| 11-13.H495R.B37.ElevationBuilding |
| 12.HA5.HISTORIC.2.ElevationWindow.FD4BFE5C4CBF471185D8969ECBB7DE14 |
| 13.H34-10.Historic.B37.WindowDetail.0CB5C3493DB4492AACEBADFC8D886BC7.[SitePlan] |