PROVIDE REQUIRED SECURITY UPGRADES Project Number 528A5-18-508 Federal contract opportunity
Solicitation number
36C24218B0565
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 2

About this file

36C24218B0565 0001 S02 - Dwg_528A5-18-508 Provide Security Required Upgrades B9_N20 - Revised1.pdf

View the file

Other files for this federal contract opportunity

Other files attached to PROVIDE REQUIRED SECURITY UPGRADES Project Number 528A5-18-508, newest first.
File Type Posted
36C24218B0565-0002000.docx DOCX document
36C24218B0565-0002001.pdf PDF
36C24218B0565-0001002.pdf PDF
36C24218B0565-0001000.docx DOCX document
36C24218B0565-002.docx DOCX document
36C24218B0565-005.pdf PDF
36C24218B0565-004.pdf PDF
36C24218B0565-003.pdf PDF
36C24218B0565-001.docx DOCX document
36C24218B0565-000.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Revisions: Date:

NOTE:

USERS OF THESE DRAWINGS ARE RESPONSIBLE FOR VERIFYING

EXISTING DIMENSIONS AND CONDITIONS IN THE FIELD

o n e e i g h t h i n c h o n e f o o t t h r e e i n c h e s e f o o t o n e a n d o n e h a l f i n c h e s e f o o t o n e i n c e f o o t t h r e e q u a r t e r s i n c e f o o t o n e h a l f i n c e f o o t t h r e e e i g h t h s i n c e f o o t o n e q u a r t e r i n c e f o o t

BUILDING 20 - POLICE HEADQUARTERS - ARMORY SECURITY WINDOW

PLAN (NEW CONSTRUCTION) - KEYNOTES. (TYPICAL).

SYMBOL DESCRIPTION

INSTALL EXPANDED METAL TO EACH WINDOW. TACK WELD TO EXISTING STEEL FLAT STOCK

ON THE WINDOW CASING. PAINT BOTH SIDES OF EXPANDED METAL WITH AN OIL-BASED

PAINT TO MATCH WALLS.

N20 of 19

NOTES AND SCHEDULES.

BUILDING 20 - POLICE HEADQUARTERS - ARMORY NEW CONSTRUCTION

PLAN - KEYNOTES

SYMBOL DESCRIPTION

BUILD EVIDENCE ROOM WITHIN 3 INCHES OF EXISTING NORTH

WINDOW.

INSTALL 3'-0" STEEL DOORS, STEELE FRAMES, HARDWARE, DOOR

HANDLES, LOCKS AND ELECTRICAL DOOR SENSOR.

INSTALL AND MAKE ALL CONNECTIONS. PROVIDE AND INSTALL A

FULLY FUNCTIONAL SECURITY AND MONITOR SYSTEM. INSTALL

SECURITY PANEL. COMPLETE INSTALLATION FOR FULLY FUNCTIONAL

KEYPAD, DETECTION AND ALARM SYSTEM. KEYPAD SHALL INCLUDE

BACK-LIGHTED KEYPAD, 2-WAY INTERCOM COMMUNICATION AND VIDEO

CONTROLLED AND MONITORED BY BUILDING 37-DISPATCH

DEPARTMENT. KEYPAD PANEL SHALL DETECT INTRUSION INTRO

ARMORY FROM ARMORY DOOR. KEYPAD SHALL INCLUDE A

COUNTDOWN TIMER OF 2 MINUTES TO ACTIVATE AUDIBLE ALARM IN

BUILDING 20 AND A VISUAL ALARM IN BUILDING 37 DISPATCH. ALARM

SHALL AUTOMATICALLY ACTIVATE AUDIO/VIDEO INTERCOM SYSTEM

WITH BUILDING 37 DISPATCH. DISARM OF ALARM SHALL BE KEYPAD

INPUT OF AN EMPLOYEE NUMBER. SYSTEM SHALL ALLOW MULTIPLE

EMPLOYEE NUMBER INPUT TO DISARM SYSTEM.

INSTALL EXISTING PASS-THROUGH EVIDENCE-LOCKER SUPPLIED BY THE

VAMC POLICE DEPARTMENT. INSTALL FOR SIDE FACING ARMORY TO BE

FLUSH WITH NEW SHEETROCK.

INSTALL EXPANDED METAL PERIMETER WALLS.

ENCASE EXPANDED METAL IN SHEETROCK. FINISH WALL TO SMOOTH FINISH.

INSTALL INSPECTION PORT TO MAKE EXPANDED METAL VISIBLE PER

SPECIFICATION.

INSTALL THREE EQUALLY SPACED INSPECTION PORTS ACROSS WALL.

INSTALL BLANKING PANEL TO OBSCURE VIEW ON EVIDENCE ROOM SIDE TO

PREVENT VISIBILITY INTO THE EVIDENCE ROOM FROM ROOM 22.

CONTINUE EXPANDED METAL PERIMETER TO COVER WINDOW, NO STUDS

BLOCKING WINDOW.

PROVIDE AND INSTALL 13" X 24" HIGH OUTPUT LED FIXTURE. INSTALL NEW

CIRCUIT, INSTALL MOTION DETECTOR AND MANUAL TOGGLE SWITCH

OVERRIDE TO ACTIVATE LIGHT. CONTRACTOR SHALL SOURCE ALL POWER

AND INSTALL NEW BREAKER(S).

BUILDING 20 - POLICE HEADQUARTERS - ARMORY DEMO PLAN -

KEYNOTES

SYMBOL DESCRIPTION

REMOVE WALLBOARD TO STRUCTURE, PER SPECIFICATION. (TYPICAL).

DEMO WALLS, REMOVE WALLBOARD AND STUDS TO PROVIDE OPEN SPACE.

FINISH INTERIOR WALLS, PATCH, PAINT TO MATCH PER SPECIFICATION..

BUILDING 20 - POLICE HEADQUARTERS - ARMORY, NEW FLOORING PLAN

- KEYNOTES

SYMBOL DESCRIPTION

PREPARE FLOOR, LEVEL, AND INSTALL NEW SUB-FLOOR.

INSTALL INDUSTRIAL-GRADE, RUBBER, RAISE-COIN FLOOR COVERING.

INSTALL INDUSTRIAL-GRADE, RUBBER, RAISE-COIN STAIR TREADS.

REFERENCE THE DRAWING:

F20D1 BUILDING 20 - POLICE HEADQUARTERS - ARMORY DEMO PLAN

REFERENCE THE DRAWING:

F20D1 BUILDING 20 - POLICE HEADQUARTERS - ARMORY SECURITY WINDOW PLAN

(NEW CONSTRUCTION)

REFERENCE THE DRAWING:

F20F1 BUILDING 20 - POLICE HEADQUARTERS - ARMORY, NEW FLOORING PLAN

BUILDING 20 - POLICE HEADQUARTERS - ARMORY PLAN (NEW

CONSTRUCTION) - KEYNOTES. (TYPICAL).

SYMBOL DESCRIPTION

FINISH SHEETROCK, PATCH AND PAINT TO MATCH EXISTING WALLS.

PAINT EXPANDED METAL AT INSPECTION PORTS. COLOR SHALL BE

BRIGHT ORANGE.

PAINT EXPANDED METAL FLOOR TO CEILING. COLOR SHALL BE

BRIGHT ORANGE. EXPANDED METAL SHALL BE EXPOSED AND VISIBLE

ON EVIDENCE ROOM SIDE. ALL INTERIOR WALLS OF EVIDENCE ROOM

SHALL HAVE EXPOSED EXPANDED METAL PAINTED BRIGHT ORANGE.

PAINT DOORS ANF FRAMES (ALL SURFACES) WITH A MINIMUM OF 2

COATS OF RED OIL BASE..

INSALL DECAL TO ARMORY DOOR. DECAL APPLIED TO SIDE FACING

ROOM 22.

BUILDING 11 - WAREHOUSE, GROUND FLOOR PLAN - CAMERA AND

MONITOR LOCATIONS.

SYMBOL DESCRIPTION

INSTALL AND CONNECT NEW CAMERA TO FACILITY-WIDE SECURITY SYSTEM

MONITORED IN LOCAL BUILDING AND FROM BUILDING 37 DISPATCH.

(TYPICAL).

REFERENCE THE DRAWING:

F11G BUILDING 11 - WAREHOUSE, GROUND FLOOR PLAN - CAMERA AND MONITOR

LOCATIONS.

G

S d w g N

P

M

REFERENCE THE DRAWING:

F20D1 BUILDING 20 - POLICE HEADQUARTERS - ARMORY DEMO PLAN

REFERENCE THE DRAWING:

F20D1 BUILDING 20 - POLICE HEADQUARTERS - ARMORY DEMO PLAN

1 2

BUILDING 20 - POLICE HEADQUARTERS, BASEMENT AND

SECOND FLOOR PLAN, SECURITY UPGRADES AND CAMERA

LOCATIONS.

SYMBOL DESCRIPTION

INSTALL AND CONNECT NEW CAMERA TO FACILITY-WIDE SECURITY SYSTEM

MONITORED IN LOCAL BUILDING AND FROM BUILDING 37 DISPATCH.

(TYPICAL).

REFERENCE THE DRAWING:

F20GB BUILDING 20 - POLICE HEADQUARTERS - FIRST LEVEL PLAN

1 2

REFERENCE THE DRAWING:

F20GB BUILDING 20 - POLICE HEADQUARTERS - SECOND LEVEL PLAN

VHACANBERGMR

Text Box

VHACANBERGMR

Text Box

VHACANBERGMR

Text Box

VHACANBERGMR

Text Box

VHACANBERGMR

Text Box

VHACANBERGMR

Text Box

VHACANBERGMR

Text Box

VHACANBERGMR

Text Box

VHACANBERGMR

Text Box

VHACANBERGMR

Text Box

1.1-3.G001.S1-G001
2.1-3.G001.S1-S1
3.1-3.G001.S1-N9
4.1-3.G001.S1-N20
5.1-3.G001.S1-N37
6.4-5.B9-F9A
7.4-5.B9-F9B
8.6.B11-F11G
9.7.B20-F20GB
10.7.B20-F20D1
11.B20-F20F1
12.8-10.Building37RenewedRev1-F37G
13.8-10.Building37RenewedRev1-E37
14.8-10.Building37RenewedRev1-D37
15.8-10.Building37RenewedRev1-F37D
16.8-10.Building37RenewedRev1-F37N
11-13.VluePrints.Historic.pdf
11-13.H495R.B37.ElevationBuilding
12.HA5.HISTORIC.2.ElevationWindow.FD4BFE5C4CBF471185D8969ECBB7DE14
13.H34-10.Historic.B37.WindowDetail.0CB5C3493DB4492AACEBADFC8D886BC7.[SitePlan]

File details come from the government source that posted it.