36C24218B0461-0001002.pdf

PDF 317 KB Posted

Attached to
528A7-14-715 RENOVATE SECONDARY ELECTRICAL DISTRIBUTION Federal contract opportunity
Solicitation number
36C24218B0461
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 2

About this file

36C24218B0461 0001 S06- 08-HA-300_BASEMENT ABATEMENT-HA-300_06-21-2018.pdf

View the file

Other files for this federal contract opportunity

Other files attached to 528A7-14-715 RENOVATE SECONDARY ELECTRICAL DISTRIBUTION, newest first.
File Type Posted
36C24218B0461-0004003.pdf PDF
36C24218B0461-0004005.pdf PDF
36C24218B0461-0004002.pdf PDF
36C24218B0461-0004001.docx DOCX document
36C24218B0461-0004004.pdf PDF
36C24218B0461-0004000.docx DOCX document
36C24218B0461-0003000.docx DOCX document
36C24218B0461-0002002.pdf PDF
36C24218B0461-0002001.pdf PDF
36C24218B0461-0002000.docx DOCX document
36C24218B0461-0002003.docx DOCX document
36C24218B0461-0001000.docx DOCX document
36C24218B0461-0001001.pdf PDF
36C24218B0461-002.pdf PDF
36C24218B0461-003.zip ZIP file
36C24218B0461-001.docx DOCX document
36C24218B0461-004.pdf PDF
36C24218B0461-000.docx DOCX document
Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

DWG of

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

528A7-14-715

SY

BASEMENT ASBESTOS

ABATEMENT PLAN

HA-300

VAMC SYRACUSE, NY

DAM

LMW

UPGRADE SECONDARY

SWITCHGEAR-EMERGENCY

05/14/2018

NOTE:

KEYED NOTES:

ASBESTOS CONTAINING MATERIAL REMOVAL SCHEDULE

ASBESTOS GENERAL NOTES:

2 3

AutoCAD SHX Text

AutoCAD SHX Text

DN

AutoCAD SHX Text

DN

AutoCAD SHX Text

UP

AutoCAD SHX Text

DN

AutoCAD SHX Text

UP

AutoCAD SHX Text

DN

AutoCAD SHX Text

DN

AutoCAD SHX Text

UP

AutoCAD SHX Text

CL51

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

CORR 36

AutoCAD SHX Text

CL46A

AutoCAD SHX Text

CORR 30C

AutoCAD SHX Text

CORR 30C

AutoCAD SHX Text

CL02

AutoCAD SHX Text

SHAFT 5

AutoCAD SHX Text

BS1

AutoCAD SHX Text

CORRIDOR 30

AutoCAD SHX Text

CORRIDOR 30A

AutoCAD SHX Text

CL14

AutoCAD SHX Text

CL18

AutoCAD SHX Text

CL20

AutoCAD SHX Text

CL15

AutoCAD SHX Text

CL06

AutoCAD SHX Text

CL08

AutoCAD SHX Text

CL08A

AutoCAD SHX Text

CL10A

AutoCAD SHX Text

CL60

AutoCAD SHX Text

CL10

AutoCAD SHX Text

CL16

AutoCAD SHX Text

CL04

AutoCAD SHX Text

CL04A

AutoCAD SHX Text

CL49

AutoCAD SHX Text

CL49A

AutoCAD SHX Text

CL55

AutoCAD SHX Text

BL04

AutoCAD SHX Text

CL09

AutoCAD SHX Text

BL06A

AutoCAD SHX Text

SERVICE LOBBY 11

AutoCAD SHX Text

BL02

AutoCAD SHX Text

CL03

AutoCAD SHX Text

AL03

AutoCAD SHX Text

AL09A

AutoCAD SHX Text

AL09

AutoCAD SHX Text

BL05A

AutoCAD SHX Text

BL08

AutoCAD SHX Text

BL08B

AutoCAD SHX Text

BL10A

AutoCAD SHX Text

BL06

AutoCAD SHX Text

BL06B

AutoCAD SHX Text

CL46

AutoCAD SHX Text

CL46B

AutoCAD SHX Text

CL48

AutoCAD SHX Text

CL50

AutoCAD SHX Text

CL54D

AutoCAD SHX Text

CL54C

AutoCAD SHX Text N

AutoCAD SHX Text

SCALE: 1/8" = 1'-0"

AutoCAD SHX Text

HA-100

AutoCAD SHX Text

AutoCAD SHX Text

BASEMENT PLAN

AutoCAD SHX Text

MALTA, NY 12020

AutoCAD SHX Text

MECHANICAL,ELECTRICAL,PLUMBING ENGINEERS,PLLC

AutoCAD SHX Text

4 COLLAMER ROAD

AutoCAD SHX Text Sigma Psi

AutoCAD SHX Text Consulting

AutoCAD SHX Text http://www.sigmapsi.com

AutoCAD SHX Text 518-581-9428

AutoCAD SHX Text

KEY PLAN

AutoCAD SHX Text ALL ABANDONED PIPING SYSTEMS SHALL BE REMOVED DURING ABATEMENT WORK. CONTRACTOR SHALL VERIFY OPERATIONAL STATUS OF PIPING SYSTEMS WITH COR PRIOR TO ANY WORK. BOTTOM OF CHASES MUST BE LEVELED TO BASEMENT FLOOR LEVEL WITH CONCRETE.

AutoCAD SHX Text COORDINATE CHASE REMOVAL AND ABATEMENT AFTER DEMOLITION OF PANEL ELC-DPC (PHASE 3H - SEE E-304).

AutoCAD SHX Text COORDINATE CHASE REMOVAL AND ABATEMENT AFTER DEMOLITION OF PANEL ELC-DPC-A (PHASE 3C - SEE E-304).

AutoCAD SHX Text

LEGEND

AutoCAD SHX Text

MATERIAL DESCRIPTION

AutoCAD SHX Text

APPROXIMATE QUANTITY

AutoCAD SHX Text

PIPE AND PIPE FITTING INSULATION INSIDE MASONRY CHASE

AutoCAD SHX Text

84 L.F. IN 3 SEPARATE CHASES

AutoCAD SHX Text A. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COMPLETION OF THE ASBESTOS THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COMPLETION OF THE ASBESTOS CONTAINING MATERIAL REMOVALS AS DEFINED IN THE CONTRACT DOCUMENTS. THE CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR ALL MEANS, METHODS, COORDINATION, SUPERVISION, MANAGEMENT, AND SEQUENCING TO COMPLETE THE WORK. ADDITIONALLY, THE CONTRACTOR SHALL MAKE ALL EFFORTS TO COOPERATE AND COORDINATE WITH THE OTHER PROJECT CONTRACTORS. THE CONTRACTOR SHALL COORDINATE ALL BUILDING/ELECTRICAL/HVAC SHUTDOWNS AND ISOLATION WITH THE OWNER. B. THE CONTRACTOR SHALL HOLD A CURRENT LICENSE IN THE STATE OF NEW YORK FOR THE CONTRACTOR SHALL HOLD A CURRENT LICENSE IN THE STATE OF NEW YORK FOR ASBESTOS REMOVAL AND SHALL EMPLOY NYS DEPARTMENT OF LABOR CERTIFIED EMPLOYEES. SUFFICIENT STAFF SHALL BE PROVIDED TO COMPLETE THE ASBESTOS REMOVALS WITHIN THE SCHEDULED CONSTRUCTION PERIODS. C. ASBESTOS MATERIAL REMOVAL AND DISPOSAL SHALL BE IN ACCORDANCE WITH THE ASBESTOS MATERIAL REMOVAL AND DISPOSAL SHALL BE IN ACCORDANCE WITH THE PROCEDURES IDENTIFIED IN THE PROJECT MANUAL AND APPLICABLE LOCAL, STATE, AND FEDERAL REGULATIONS. CONTRACTOR, AT HIS OWN EXPENSE, MAY OBTAIN A SITE SPECIFIC VARIANCE FROM THE NYS DEPARTMENT OF LABOR. D. CONTRACT DRAWINGS INDICATE THE EXTENT OF ASBESTOS REMOVAL AND ARE TO BE USED CONTRACT DRAWINGS INDICATE THE EXTENT OF ASBESTOS REMOVAL AND ARE TO BE USED AS A GUIDELINE. CONTRACTOR SHALL REMOVE AND DISPOSE OF ASBESTOS CONTAINING MATERIALS ILLUSTRATED ON THE CONTRACT DRAWINGS AND LISTED IN THE SPECIFICATIONS. E. CONTRACTOR SHALL COORDINATE PROPOSED DECONTAMINATION UNIT LOCATIONS, STAGING CONTRACTOR SHALL COORDINATE PROPOSED DECONTAMINATION UNIT LOCATIONS, STAGING AREAS, AND WORK SITE ACCESS WITH BUILDING OWNER AND/OR THEIR REPRESENTATIVE. F. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPLACEMENT OR REPAIR OF ANY DAMAGES THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPLACEMENT OR REPAIR OF ANY DAMAGES TO THE BUILDING, BUILDING COMPONENTS, OR SYSTEMS NOT INCLUDED IN THIS SCOPE THAT ARE CONSEQUENTLY DAMAGED AS A RESULT OF THE CONTRACTOR'S WORK. G. THE CONTRACTOR IS RESPONSIBLE FOR ALL DEMOLITION AND REMOVALS REQUIRED TO THE CONTRACTOR IS RESPONSIBLE FOR ALL DEMOLITION AND REMOVALS REQUIRED TO CONDUCT ABATEMENT. H. DUE TO PHASED NATURE OF ELECTRICAL WORK, EACH CHASE MUST BE ABATED AS DUE TO PHASED NATURE OF ELECTRICAL WORK, EACH CHASE MUST BE ABATED AS INDIVIDUAL MINOR PROJECTS SINCE ALL AREAS WILL NOT BE ACCESSIBLE AT THE SAME TIME.

AutoCAD SHX Text

COORDINATE CHASE REMOVAL AND ABATEMENT PRIOR TO PHASE 2D (SEE E-303).

AutoCAD SHX Text

ADDED ADDITIONAL CHASE

AutoCAD SHX Text 06/21/2018

Sheets and Views
HA-300