36C24218B0461-0001002.pdf
PDF 317 KB Posted
- Attached to
- 528A7-14-715 RENOVATE SECONDARY ELECTRICAL DISTRIBUTION Federal contract opportunity
- Solicitation number
- 36C24218B0461
About this file
36C24218B0461 0001 S06- 08-HA-300_BASEMENT ABATEMENT-HA-300_06-21-2018.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24218B0461-0004003.pdf | ||
| 36C24218B0461-0004005.pdf | ||
| 36C24218B0461-0004002.pdf | ||
| 36C24218B0461-0004001.docx | DOCX document | |
| 36C24218B0461-0004004.pdf | ||
| 36C24218B0461-0004000.docx | DOCX document | |
| 36C24218B0461-0003000.docx | DOCX document | |
| 36C24218B0461-0002002.pdf | ||
| 36C24218B0461-0002001.pdf | ||
| 36C24218B0461-0002000.docx | DOCX document | |
| 36C24218B0461-0002003.docx | DOCX document | |
| 36C24218B0461-0001000.docx | DOCX document | |
| 36C24218B0461-0001001.pdf | ||
| 36C24218B0461-002.pdf | ||
| 36C24218B0461-003.zip | ZIP file | |
| 36C24218B0461-001.docx | DOCX document | |
| 36C24218B0461-004.pdf | ||
| 36C24218B0461-000.docx | DOCX document |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
DWG of
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
528A7-14-715
SY
BASEMENT ASBESTOS
ABATEMENT PLAN
HA-300
VAMC SYRACUSE, NY
DAM
LMW
UPGRADE SECONDARY
SWITCHGEAR-EMERGENCY
05/14/2018
NOTE:
KEYED NOTES:
ASBESTOS CONTAINING MATERIAL REMOVAL SCHEDULE
ASBESTOS GENERAL NOTES:
2 3
AutoCAD SHX Text
AutoCAD SHX Text
DN
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
CL51
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
CORR 36
AutoCAD SHX Text
CL46A
AutoCAD SHX Text
CORR 30C
AutoCAD SHX Text
CORR 30C
AutoCAD SHX Text
CL02
AutoCAD SHX Text
SHAFT 5
AutoCAD SHX Text
BS1
AutoCAD SHX Text
CORRIDOR 30
AutoCAD SHX Text
CORRIDOR 30A
AutoCAD SHX Text
CL14
AutoCAD SHX Text
CL18
AutoCAD SHX Text
CL20
AutoCAD SHX Text
CL15
AutoCAD SHX Text
CL06
AutoCAD SHX Text
CL08
AutoCAD SHX Text
CL08A
AutoCAD SHX Text
CL10A
AutoCAD SHX Text
CL60
AutoCAD SHX Text
CL10
AutoCAD SHX Text
CL16
AutoCAD SHX Text
CL04
AutoCAD SHX Text
CL04A
AutoCAD SHX Text
CL49
AutoCAD SHX Text
CL49A
AutoCAD SHX Text
CL55
AutoCAD SHX Text
BL04
AutoCAD SHX Text
CL09
AutoCAD SHX Text
BL06A
AutoCAD SHX Text
SERVICE LOBBY 11
AutoCAD SHX Text
BL02
AutoCAD SHX Text
CL03
AutoCAD SHX Text
AL03
AutoCAD SHX Text
AL09A
AutoCAD SHX Text
AL09
AutoCAD SHX Text
BL05A
AutoCAD SHX Text
BL08
AutoCAD SHX Text
BL08B
AutoCAD SHX Text
BL10A
AutoCAD SHX Text
BL06
AutoCAD SHX Text
BL06B
AutoCAD SHX Text
CL46
AutoCAD SHX Text
CL46B
AutoCAD SHX Text
CL48
AutoCAD SHX Text
CL50
AutoCAD SHX Text
CL54D
AutoCAD SHX Text
CL54C
AutoCAD SHX Text N
AutoCAD SHX Text
SCALE: 1/8" = 1'-0"
AutoCAD SHX Text
HA-100
AutoCAD SHX Text
AutoCAD SHX Text
BASEMENT PLAN
AutoCAD SHX Text
MALTA, NY 12020
AutoCAD SHX Text
MECHANICAL,ELECTRICAL,PLUMBING ENGINEERS,PLLC
AutoCAD SHX Text
4 COLLAMER ROAD
AutoCAD SHX Text Sigma Psi
AutoCAD SHX Text Consulting
AutoCAD SHX Text http://www.sigmapsi.com
AutoCAD SHX Text 518-581-9428
AutoCAD SHX Text
KEY PLAN
AutoCAD SHX Text ALL ABANDONED PIPING SYSTEMS SHALL BE REMOVED DURING ABATEMENT WORK. CONTRACTOR SHALL VERIFY OPERATIONAL STATUS OF PIPING SYSTEMS WITH COR PRIOR TO ANY WORK. BOTTOM OF CHASES MUST BE LEVELED TO BASEMENT FLOOR LEVEL WITH CONCRETE.
AutoCAD SHX Text COORDINATE CHASE REMOVAL AND ABATEMENT AFTER DEMOLITION OF PANEL ELC-DPC (PHASE 3H - SEE E-304).
AutoCAD SHX Text COORDINATE CHASE REMOVAL AND ABATEMENT AFTER DEMOLITION OF PANEL ELC-DPC-A (PHASE 3C - SEE E-304).
AutoCAD SHX Text
LEGEND
AutoCAD SHX Text
MATERIAL DESCRIPTION
AutoCAD SHX Text
APPROXIMATE QUANTITY
AutoCAD SHX Text
PIPE AND PIPE FITTING INSULATION INSIDE MASONRY CHASE
AutoCAD SHX Text
84 L.F. IN 3 SEPARATE CHASES
AutoCAD SHX Text A. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COMPLETION OF THE ASBESTOS THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COMPLETION OF THE ASBESTOS CONTAINING MATERIAL REMOVALS AS DEFINED IN THE CONTRACT DOCUMENTS. THE CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR ALL MEANS, METHODS, COORDINATION, SUPERVISION, MANAGEMENT, AND SEQUENCING TO COMPLETE THE WORK. ADDITIONALLY, THE CONTRACTOR SHALL MAKE ALL EFFORTS TO COOPERATE AND COORDINATE WITH THE OTHER PROJECT CONTRACTORS. THE CONTRACTOR SHALL COORDINATE ALL BUILDING/ELECTRICAL/HVAC SHUTDOWNS AND ISOLATION WITH THE OWNER. B. THE CONTRACTOR SHALL HOLD A CURRENT LICENSE IN THE STATE OF NEW YORK FOR THE CONTRACTOR SHALL HOLD A CURRENT LICENSE IN THE STATE OF NEW YORK FOR ASBESTOS REMOVAL AND SHALL EMPLOY NYS DEPARTMENT OF LABOR CERTIFIED EMPLOYEES. SUFFICIENT STAFF SHALL BE PROVIDED TO COMPLETE THE ASBESTOS REMOVALS WITHIN THE SCHEDULED CONSTRUCTION PERIODS. C. ASBESTOS MATERIAL REMOVAL AND DISPOSAL SHALL BE IN ACCORDANCE WITH THE ASBESTOS MATERIAL REMOVAL AND DISPOSAL SHALL BE IN ACCORDANCE WITH THE PROCEDURES IDENTIFIED IN THE PROJECT MANUAL AND APPLICABLE LOCAL, STATE, AND FEDERAL REGULATIONS. CONTRACTOR, AT HIS OWN EXPENSE, MAY OBTAIN A SITE SPECIFIC VARIANCE FROM THE NYS DEPARTMENT OF LABOR. D. CONTRACT DRAWINGS INDICATE THE EXTENT OF ASBESTOS REMOVAL AND ARE TO BE USED CONTRACT DRAWINGS INDICATE THE EXTENT OF ASBESTOS REMOVAL AND ARE TO BE USED AS A GUIDELINE. CONTRACTOR SHALL REMOVE AND DISPOSE OF ASBESTOS CONTAINING MATERIALS ILLUSTRATED ON THE CONTRACT DRAWINGS AND LISTED IN THE SPECIFICATIONS. E. CONTRACTOR SHALL COORDINATE PROPOSED DECONTAMINATION UNIT LOCATIONS, STAGING CONTRACTOR SHALL COORDINATE PROPOSED DECONTAMINATION UNIT LOCATIONS, STAGING AREAS, AND WORK SITE ACCESS WITH BUILDING OWNER AND/OR THEIR REPRESENTATIVE. F. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPLACEMENT OR REPAIR OF ANY DAMAGES THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPLACEMENT OR REPAIR OF ANY DAMAGES TO THE BUILDING, BUILDING COMPONENTS, OR SYSTEMS NOT INCLUDED IN THIS SCOPE THAT ARE CONSEQUENTLY DAMAGED AS A RESULT OF THE CONTRACTOR'S WORK. G. THE CONTRACTOR IS RESPONSIBLE FOR ALL DEMOLITION AND REMOVALS REQUIRED TO THE CONTRACTOR IS RESPONSIBLE FOR ALL DEMOLITION AND REMOVALS REQUIRED TO CONDUCT ABATEMENT. H. DUE TO PHASED NATURE OF ELECTRICAL WORK, EACH CHASE MUST BE ABATED AS DUE TO PHASED NATURE OF ELECTRICAL WORK, EACH CHASE MUST BE ABATED AS INDIVIDUAL MINOR PROJECTS SINCE ALL AREAS WILL NOT BE ACCESSIBLE AT THE SAME TIME.
AutoCAD SHX Text
COORDINATE CHASE REMOVAL AND ABATEMENT PRIOR TO PHASE 2D (SEE E-303).
AutoCAD SHX Text
ADDED ADDITIONAL CHASE
AutoCAD SHX Text 06/21/2018
| Sheets and Views |
| HA-300 |
File details come from the government source that posted it.