36C24218B0203-002.pdf
PDF 171 KB Posted
- Attached to
- REPLACE STORM DRAIN SYSTEM Federal contract opportunity
- Solicitation number
- 36C24218B0203
About this file
36C24218B0203 P07 - Wage Determination.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24218C0110-000.docx | DOCX document | |
| 36C24218B0203-00002000.docx | DOCX document | |
| 36C24218B0203-00001001.pdf | ||
| 36C24218B0203-00001000.docx | DOCX document | |
| 36C24218B0203-004.zip | ZIP file | |
| 36C24218B0203-001.docx | DOCX document | |
| 36C24218B0203-003.zip | ZIP file | |
| 36C24218B0203-000.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
General Decision Number: NY180018 01/05/2018 NY18
Superseded General Decision Number: NY20170018
State: New York
Construction Type: Highway
County: Steuben County in New York.
HIGHWAY CONSTRUCTION PROJECTS
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.35 for calendar year 2018 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015.
If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.35 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2018. The EO minimum wage rate will be adjusted annually.
Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/05/2018
ELEC0139-003 06/05/2016
Rates Fringes
ELECTRICIAN......................$ 34.50 24.39
ELEC1249-003 05/01/2017
Rates Fringes
ELECTRICIAN (LINE
CONSTRUCTION: LIGHTING AND
TRAFFIC SIGNAL Including any and all Fiber Optic Cable necessary for Traffic Signal Systems, Traffic Monitoring systems and Road Weather information systems) Flagman.....................$ 25.59 6.75%+22.65+a Groundman (Truck Driver)....$ 34.12 6.75%+22.65+a Groundman Truck Driver (tractor trailer unit)......$ 36.25 6.75%+22.65+a Lineman & Technician........$ 42.65 6.75%+22.65+a Mechanic....................$ 34.12 6.75%+22.65+a
2/2/2018https://www.wdol.gov/wdol/scafiles/davisbacon/NY18.dvb?v=0
FOOTNOTE:
a. New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Christmas Day, plus President's Day, Good Friday, Decoration Day, Election Day for the President of the United States and Election Day for the Governor of the State of New York, provided the employee works the day before or the day after the holiday.
ENGI0832-001 07/01/2017
Rates Fringes
Operating Engineer:
EXCAVATING AND PAVING
GROUP 1....................$ 31.12 26.15+a GROUP 2....................$ 30.66 26.15+a GROUP 3....................$ 29.99 26.15+a GROUP 4....................$ 26.61 26.15+a MASTER MECHANIC............$ 33.12 26.15+a
HEAVY AND HIGHWAY
GROUP 1....................$ 40.51 27.05+a GROUP 2....................$ 39.80 27.05+a GROUP 3....................$ 36.94 27.05+a GROUP 4....................$ 44.51 27.05+a GROUP 5....................$ 43.51 27.05+a GROUP 6....................$ 42.51 27.05+a GROUP 7....................$ 41.89 27.05+a
TUNNEL AND SHAFT
GROUP 1....................$ 43.15 27.15+b GROUP 2....................$ 41.93 27.15+b GROUP 3....................$ 39.14 27.15+b GROUP 4....................$ 36.13 27.15+b MASTER MECHANIC............$ 45.49 27.15+b
For EXCAVATION AND PAVING:
FOOTNOTE:
a. PAID HOLIDAYS: New Year's Day; Memorial Day; Independence Day; Labor Day; Thanksgiving Day; Christmas Day, regardless of the day of the week on which the holiday may fall, provided the employee works either on the work day immediately preceding the holiday or on the scheduled work day immediately following the holiday.
EXCAVATION AND PAVING CLASSIFICATIONS
GROUP 1: Asphalt paver; automatic fine grader; backhoe (except tractor mounted, rubber tired); blacktop plant (automated); cableway; caisson auger; central mix concrete plant (automated); cherry picker- over 5 ton capacity;
crane; cranes and derricks (steel erection); dragline; dual drum paver; front end loader (4 cu. yd. and over);
hoist,(Tow or 3 drum); pile driver; power grader with elevation loader attachment; quarry master (or equivalent);
shovel; slip form paver; tractor drawn belt-type loader;
truck crane tunnel shovel; excavator, all purpose hydraulically operated
GROUP 2: Backhoe (tractor mounted, rubber tired); bituminous spreader and mixer; blacktop plant (non automated); boring machine; cage hoist; central mix plant (non automated) and all concrete batching plants; cherry picker, 5 tons and under; compressor (4 or less) exceeding 2000 CFM combined capacity; concrete paver over 16s; concrete pump; crusher;
drill rigs (tractor mounted); front end loader (under 4 cu.
yds); hi- pressure boiler (15 lbs and over); hoist (one drum); Kolman plant loader and similar type loaders;
maintenance engineer; maintenance grease man; mechanical slurry machine; mixer for stabilized base self propelled;
monorail machine; plant engineer; power broom; power grader; pump crete; ready mix concrete plant; road widener;
roller (all above sub-grade); side boom; tractor scraper;
tractor with dozer and or pusher; trencher; winch
GROUP 3: Compressors (4 not to exceed 2000 CFM combined capacity; or 3 or less with more than 1200 CFM but not to exceed 2000 CFM); compressors (any size but subject to other provisions for compressors); dust collectors;
generators; welding machines (4 of any type or combination); concrete pavement spreaders and finishers;
conveyor; drill (core); drill (well); electric pump used in conjunction with well point systems; farm tractor with accessories; fine grade machine; fork lift; gunite machine;
hammers-hydraulic-self propelled; locomotive; post hole digger and post driver; pumps (regardless of motive power, not more than 4 in number not to exceed 20" in total capacity); submersible electric pumps when used in lieu of well points, tractor with towed accessories; vibratory compactor; vibro tamp; well point
GROUP 4: Compressor (any size, but subject to other provisions for compressors); dust collectors; generators;
welding machines (3 or less of any type or combination);
concrete mixer (16s and under), concrete saw-self propelled; fireman; form tamper; mulching machine; power heaterman; pumps regardless of motive power no more than 3 in number not to exceed 12" in total capacity; revinius widener; steam cleaner; tractor
GROUP 5: Master Mechanic
For HEAVY AND HIGHWAY CONSTRUCTION:
FOOTNOTE:
b. PAID HOLIDAYS: New Years Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Christmas Day provided the employee works the working day before and the working day after the holiday
POWER EQUIPMENT OPERATOR CLASSIFICATIONS (HEAVY/HIGHWAY):
GROUP 1: Asphalt Curb Machine, Self Propelled, Slipform, Automated Concrete Spreader (CMI Type), Automatic Fine Grader, Backhoe (Except Tractor Mounted, Rubber Tired), Backhoe Excavator Full Swing (CAT 212 or similar type), Back Filling Machine, Belt Placer (CMI Type), Blacktop Plant (Automated), Boom truck , Cableway, Caisson Auger, Central Mix Concrete Plant (Automated), Concrete Curb Machine, Self Propelled, Slipform, Concrete Pump, Crane, Cherry Picker, Derricks (steel erection), Dragline, Overhead Crane (Gantry or Straddle type), Pile Driver, Truck Crane, Directional Drilling Machine, Dredge, Dual Drum Paver, Excavator (All Purpose Hydraulically Operated) (Gradall or Similar), Front End Loader ( 4 cu. yd. and Over), Head Tower (Sauerman or Equal), Hoist (Two or Three Drum), Holland Loader, Maintenance Engineer, Mine Hoist, Mucking Machine or Mole Pavement Breaker(SP) Wertgen; PB-4 and similar type, Power Grader, Profiler (over 105 H.P.)
Quad 9, Quarry Master (or equivalent), Scraper, Fireman, Fork Lift, Form Tamper, Grout Pump, Gunite Machine, Hammers (Hydraulic self-propelled), Hydra-Spiker, ride-on, Hydraulic Pump (jacking system), Hydro-Blaster (Water), Mulching Machine, Oiler, Parapet Concrete or Pavement, Shovel, Side Boom, Slip Form Paver, Tractor Drawn, BeltType Loader, Truck or Trailer Mounted Log , Chipper (Self Feeder), Tug Operator (Manned Rented Equipment Excluded), Tunnel Shovel
GROUP 2: Asphalt Paver, Backhoe (Tractor Mounted, Rubber Tired), Bituminous Recycler Machine, Bituminous Spreader and Mixer, Blacktop Plant (NonAutomated), Blast or Rotary Drill (Truck or Tractor Mounted), Boring Machine, Cage Hoist, Central Mix Plant (NonAutomated) and All Concrete Batching Plants, Cherry Picker (5 tons capacity and under), Concrete Paver (Over 16S), Crawler Drill, Self-contained, Crusher, Diesel Power Unit, Drill Rigs, Tractor Mounted, Front End Loader (Under 4 cu. yd.), Greaseman/Lubrication Engineer, HiPressure Boiler (15 lbs. and over), Hoist (One Drum), Hydro-Axe, Kolman Plant Loader and Similar Type Loaders, L.C.M. Work Boat Operator, Locomotive Mixer (for stabilized base selfpropelled), Monorail Machine, Plant Engineer, Profiler (105 H.P. and under), Grinder, Post Hole Digger and Post Driver, Power Broom (towed), Power Heaterman, Power Sweeper, Revinius Widener, Roller (Grade and Fill), Scarifier, ride-on, Shell Winder, Skid steer loader (Bobcat or similar), Span-Saw, ride-on, Steam Cleaner, Pug Mill, Pump Crete Ready Mix Concrete Plant Refrigeration Equipment (for soil stabilization)Road Widener, Roller (all above subgrade), Sea Mule, Self-contained Ride-on Rock Drill, Excluding Air-Track Type Drill, Skidder, Tractor with Dozer and/or Pusher, Trencher.
Tugger Hoist, Vermeer saw (ride on, any size or type), Winch, Winch Cat
GROUP 3: A Frame Winch Hoist on Truck , Articulated Heavy Hauler, Aggregate Plant, Asphalt or Concrete Grooving, Machine (ride on), Ballast Regulator, Ride-on Boiler (used in conjunction with production), Bituminous Heater, self-propelled, Boat (powered), Cement and Bin Operator, Compressors, Dust Collectors, Generators, Pumps, Welding Machines, Light Plants, Heaters (hands-off equipment), Concrete Pavement Spreader and Finisher, Concrete Paver or Mixer (16S and under), Concrete Saw (self-propelled), Conveyor, Deck Hand, Directional Drill Machine Locator, Drill, (Core), Drill, (Well,) Farm Tractor with accessories, Fine Grade Machine, Tamper, ride-on, Tie Extractor, ride-on, Tie Handler, ride-on, Tie Inserter, ride-on, Tie Spacer, ride-on, Tire Repair, Track Liner, ride-on, Tractor, Tractor (with towed accessories), Vibratory Compactor, Vibro Tamp, Well Point
GROUP 4: Tower Cranes
GROUP 5: Cranes 50 tons and over
GROUP 6: Cranes 49 tons and below
GROUP 7: Master Mechanic
For TUNNEL AND SHAFT:
FOOTNOTE:
b. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Christmas Day, regardless of the day of the week on which the Holiday may fall, provided the employee works the working day before and the working day after the holiday
TUNNEL AND SHAFT CLASSIFICATIONS
GROUP 1: Automated concrete spreader (CMI or equivalent);
automated fine grade machine (cmi); backhoe; belt placer (cmi or similar); blacktop spreader (automated); cableway;
caisson auger; central mix plant (automated); cherry picker (5 tons); concrete curb machine (self-propelled slipform);
concrete pump; crane; crane shaft; crane underground;
cranes and derricks (steel erection); dragline; dredge;
dual drum paver; excavator (all purpose-hydraulicly operated gradall or similar); fork lift (factory rated 15' and over); front end loader (4cu yd and over); head tower (sauerman or equal); hoist; shaft; hoist (two or three drum); holland loader; maintenance engineer (shaft and tunnel); mine hoist; mining machine (mole and similar types); mucking machine or mose; overhead crane (gantry or straddle type); pile driver; power grader; Quad 9, quarry master (or equivalent); scraper; shovel; side boom; slip form paver; tripper/maintenance engineer (shaft and tunnel); tractor drawn belt-type loader; truck crane; truck or trailer mounted log chipper (self feeder); tug operator (manned rented equipment excluded); tunnel shovel
GROUP 2: Automated central mix concrete plant; backhoe (topside); backhoe (tractor mounted,rubber tired);
bituminous spreader and mixer; blacktop plant (non automated); blast or rotary drill (truck or tractor mounted); boring machine; cage hoist; central mix plant (non automated) and all concrete batching plants; cherry picker (5 tons capacity and under); compressors (4 or less exceeding 2000 CFM combined capacity); concrete paver (over 16s); concrete pump; crane (topside); crusher; diesel power unit; drill rigs, tractor mounted; front end loader (under 4 cu. yds); grayco epoxy machine; hi-pressure boiler (15 lbs and over); hoist (one drum); hoist (two or three drum)
(topside); kolman plant loader and similar type loaders;
L.C.M. work boat operator; locomotive; maintenance engineer (topside); maintenance greaseman; mixer (for stabilized base self-propelled); monorial machine; plant engineer;
personnel hoist; pump crete; ready mix concrete plant;
refrigeration equipment (from soil stabilization); road widener; roller (all above sub-grade); sea mule; shotcrete machine; shovel (topside); tractor with dozer and/or pusher; trencher; tugger hoist; tunnel locomotive; welder;
winch; winch cat
GROUP 3: "A" frame truck; ballast regulator (ride on);
compressors (4 not to exceed 2000 cfm combined capacity; or 3 or less with more than 1200 cfm but not to exceed 2000 cfm); compressors (any size but subject to other provisions for compressors; dust collectors; generators; pumps;
welding machines; light plants (4 of any type or combination); concrete pavement spreaders and finishers;
conveyor; drill (core); drill (well); electric pump used in conjunction with well point system; farm tractor with accessories; fine grade machine; fork lift (under 15 ft);
ground pump over 5 cu. ft (manufacturers rating); gunite machine; hammers (hydraulic self propelled); hydra-spiker (ride on); hydra blaster (water); hydra blaster; motorized form carrier; post hole digger and post driver; power sweeper; roller (grade and fill); scarifer (ride on); span saw (ride on); submersible electric pump (when used in lieu of well points); tamper (ride on); tie extractor (ride on);
tie handler (ride on); tie inserter (rider on); tie spacer (ride on); track liner (ride on); tractor with towed accessories; vibratory compactor; vibro tamp; well point aggregate plant; boiler (used in conjunction with production); cement and bin operator; compressors (3 or less not to exceed 1200 cfm combined capacity); compressors (any size; but subject to other provisions for compressors); dust collectors; generators; pumps; welding machines; light plants (3 or less of any type or combination); concrete paver or mixer (16s and under);
concrete saw (self propelled); fireman; form tamper;
greaseman; hydraulic pump (jacking system); junior engineer; light plants; mulching machine; oiler; parapet concrete or pavement grinder; power broom (towed); power heaterman (when used for production); revinius widener;
shell winder; steam cleaner; tractor
GROUP 4: Crane, friction or lattice type with boom length 200 feet and over
IRON0006-002 05/01/2017
TOWNSHIPS OF CANISTEO, FREEMONT, GREENWOOD, HARTSVILLE,
HORNELL, HORNELLSVILLE, HOWARD, JASPER, TROUPSBURG, WEST UNION
Rates Fringes
Ironworkers:
Fence Erector...............$ 28.62 24.65 Ironworker (Rodmen).........$ 30.05 26.15
IRON0033-009 05/01/2017
TWPS OF ADDISON, AVOCA, BATH, BRADFORD, CAMERON, CAMPBELL,
CATON, COHOCTON, CORNING, DANSVILLE, ERWIN, HORNBY, LINDLEY,
PRATTSBURG, PULTENEY, RATHBONE, THURSTON, TUSCARORA, URBANA,
WAYLAND, WAYNE WOODHULL
Rates Fringes
Ironworkers:
Ornamental, Reinforcing Stone Derrickman, Rigger, Rodman, Structural Machinery Movers, Fence Erectors, Precast Concrete Erector.....................$ 27.10 25.04 Sheeter.....................$ 27.35 25.04
LABO0785-022 07/01/2017
HEAVY & HIGHWAY
ZONE III
Rates Fringes
LABORER
GROUP 1.....................$ 26.80 20.56+a GROUP 2.....................$ 27.00 20.56+a
FOOTNOTE:
a. PAID HOLIDAYS: New Year's Day; Memorial Day;
Independence Day; Labor Day; Thanksgiving Day; Christmas Day, provided the employee works the working day before and the working day after the holiday.
LABORER CLASSIFICATIONS
GROUP 1: Laborers; Flaggers; Outboard and Hand Boats; Bull Float; Chain Saw; Concrete Aggregate Bin; Concrete bootman;
Gin Buggy; Hand or Machine Vibrator; Jackhammer; Mason Tender; Mortar Mixer; Pavement Breaker; Handlers of all Steel Mesh; Small Generators for laborers' tool;
Installation of Bridge Drainage Pipe; Pipelayers; Vibrator type Rollers; Tamper; drill Doctor; Tail or Screw Operator on Asphalt Paver; Water Pump Operators (1- 1/2" and single diaphram); Nozzle (asphalt, gunnite, seeding and sandblasting); Laborers on Chain Link Fence Erection; rock Splitter and Power Unit; Pusher Type Concrete Saw and all other Gas, Electric, Oil and Air Tool Operators; Wrecking Laborers
GROUP 2: All Rock or Drill Machine Operators (except quarry master and similar type); Acetylene Torch Operator; Asphalt Raker; Powderman; Blasters; Form Setters; Stone or Granite Curb Setters
PLUM0267-001 05/01/2017
TOWNS OF ADDISON, BATH, BRADFORD, CAMPBELL, CANTON, CORNING,
ERWIN, HORNBY, LINDLEY, PULTENEY, RATHBONE, THURSTON,
TUSCARORA, URBANA AND WAYNE COUNTIES
Rates Fringes
Plumber, Pipefitter, Steamfitter (including HVAC work)............................$ 34.01 23.57
TEAM0317-004 07/01/2017
HEAVY & HIGHWAY
Townships of Avoca, Canisteo, Cohocton, Dansville, Freemont, Greenwood, Hartsville, Hornell, Howard, Jasper, Prattsburg, Pulteney, Troupsburg, West Union, Wheeler.
Rates Fringes
TRUCK DRIVER
GROUP 1.....................$ 24.46 24.10+a GROUP 2.....................$ 24.66 24.10+a
a. Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Christmas Day, provided the employee works the working day before and the working day after the holiday.
TRUCK DRIVER CLASSIFICATIONS
GROUP 1: Yardman; Pickups; panel trucks; flatboy materials trucks (straight jobs); single axle dump trucks; dumpsters;
receivers; greasers; truck tireman, tandems; batch truck;
mechanics; semi- trailors; low-boy trucks; asphalt distributor trucks; agitator; mixer trucks and dumpcrete type vehicles; truck mechanic; fuel truck
GROUP 2: Specialized earth moving equipment - euclid type or similar off-highway equipment, where not self-loaded;
straddle (ross) carrier; self-contained concrete mobile unit; off-highway tandem back dump; twin engine equipment;
double-hitched equipment where not self-loaded
TEAM0529-002 05/01/2017
STEUBEN COUNTY: Towns of Addison, Avoca, Bath, Bradford, Cameron, Campbell, Caton, Corning, Erwin, Hornby, Howard, Lindley, Pulteney, Rathbone, Thurston, Tuscarora, Urbana, Wayne, Wheeler and Woodhull
Rates Fringes
TRUCK DRIVER
GROUP 1.....................$ 21.76 12.71+a GROUP 2.....................$ 21.83 12.71+a GROUP 3.....................$ 22.32 12.71+a
FOOTNOTES:
a. PAID HOLIDAYS: New Year's day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Christmas Day, provided the employee works the working day before and the working day after the holiday.
TRUCK DRIVERS CLASSIFICATIONS:
GROUP 1: Flat Bed Truck (Single Axle); Dump Trucks (Under 10 yds Single Axle); Stake Body Truck (Single Axle);
Dumpster (Single Axle)
GROUP 2: Dump Truck (Over 10 yds); Transit Mix (Under 5 yds); Transit Mix (Over 5 yds); Flat or Stake Body (Tandem); A-Frame/Winch Trucks; Dry Batch Truck; Truck Mounted Sweeper and Vac Trucks; Dumpster (Tandem)
GROUP 3: Euclid-Type; Off Highway Equipment-Back or Double Bottom Dump Trucks (Over 20 Tons); Straddle Trucks; Pusher;
Articulate Dumped Trucks; Low Boy Trailers; Semi Trailers;
Asphalt Distributors; Fuel Truck
SUNY1988-001 06/22/1988
Rates Fringes
LABORER..........................$ 11.02 2.12
ROOFER...........................$ 11.62 3.21
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
File details come from the government source that posted it.