This document contains a scope of work for replacing a main water valve at a Department of Veterans Affairs facility along with records management requirements for any associated federal contract. The scope of work involves isolating and removing an existing valve, installing a new valve in-kind, testing the new valve, and confirming the repair. The records management requirements specify that the government owns all data, records, and documentation produced under the contract. The contractor must comply with federal and agency records policies regarding preservation, disposition, and safeguarding of all records, including those covered by the Privacy Act, and obtain approval before subcontracting or destroying any records. The related federal contract opportunity is solicitation number 36C24124Q0073 from the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 1 for a ground water replacement project at Building 2.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24124Q0073_3.docx | DOCX document | |
| Amendment 1 Questions and Answers.docx | DOCX document | |
| 36C24124Q0073_2.docx | DOCX document | |
| Combined Synopsis-Solicitation.docx | DOCX document | |
| 36C24124Q0073_1.docx | DOCX document | |
| Attachment 3_Past Performance Worksheet.xlsx | XLSX spreadsheet | |
| Attachment 2_Price Schedule.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Scope of Work Building 2 Ground Floor Corridor Main Water Valve Replacement
Background:
A domestic water shutdown occurred August 10 to facilitate the tie-ins of new sinks and toilets as a part of the Building 2, 6th floor Blind Rehab renovation project. When the tie-in was complete, the water riser needed to be turned back on. While attempting to open the valve, the valve would not open. The valve is in poor condition and needs to be replaced. As this repair requires the cold water to Building 2 to be off, this work shall be done off-hours. Photos of existing valve below:
Scope:
-Isolate the existing valve -Demo and remove existing valve -Install new in-kind valve -Test new valve -Confirm repair
END OF STATEMENT OF WORK
Records Management
1. Citations to pertinent laws, codes and regulations such as 44 U.S.C chapters 21, 29, 31 and 33; Freedom of Information Act (5 U.S.C. 552); Privacy Act (5 U.S.C. 552a); 36 CFR Part 1222 and Part 1228.
2. Contractor shall treat all deliverables under the contract as the property of the U.S. Government for which the Government Agency shall have unlimited rights to use, dispose of, or disclose such data contained therein as it determines to be in the public interest.
3. Contractor shall not create or maintain any records that are not specifically tied to or authorized by the contract using Government IT equipment and/or Government records.
4. Contractor shall not retain, use, sell, or disseminate copies of any deliverable that contains information covered by the Privacy Act of 1974 or that which is generally protected by the Freedom of Information Act.
5. Contractor shall not create or maintain any records containing any Government Agency records that are not specifically tied to or authorized by the contract.
6. The Government Agency owns the rights to all data/records produced as part of this contract.
7. The Government Agency owns the rights to all electronic information (electronic data, electronic information systems, electronic databases, etc.) and all supporting documentation created as part of this contract. Contractor must deliver sufficient technical documentation with all data deliverables to permit the agency to use the data.
8. Contractor agrees to comply with Federal and Agency records management policies, including those policies associated with the safeguarding of records covered by the Privacy Act of 1974. These policies include the preservation of all records created or received regardless of format [paper, electronic, etc.] or mode of transmission [e-mail, fax, etc.] or state of completion [draft, final, etc.].
9. No disposition of documents will be allowed without the prior written consent of the Contracting Officer. The Agency and its contractors are responsible for preventing the alienation or unauthorized destruction of records, including all forms of mutilation. Willful and unlawful destruction, damage or alienation of Federal records is subject to the fines and penalties imposed by 18 U.S.C. 2701. Records may not be removed from the legal custody of the Agency or destroyed without regard to the provisions of the agency records schedules.
10. Contractor is required to obtain the Contracting Officer's approval prior to engaging in any contractual relationship (sub-contractor) in support of this contract requiring the disclosure of information, documentary material and/or records generated under, or relating to, this contract. The Contractor (and any sub-contractor) is required to abide by Government and Agency guidance for protecting sensitive and proprietary information.