36C10E20Q0259 0001_1.docx

DOCX document 30 KB Posted

Attached to
5830--Amendment A0001 Paging System Federal contract opportunity
Solicitation number
36C10E20Q0259
Issued by
Department of Veterans Affairs Veteran Benefits Administration Headquarters

View the file

Other files for this federal contract opportunity

Other files attached to 5830--Amendment A0001 Paging System, newest first.
File Type Posted
Rules of Behavior.pdf PDF
Subcontractor Verification SDVOSB Work Sheet.doc DOC document
36C10E20Q0259.docx DOCX document
36C10E20Q0259 Past Performance Survey.pdf PDF
RevSow 08-25-2020.pdf PDF
2015-5707 REV13.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contract Opportunity Amendment to a Previous Combined Solicitation

PRODUCT SERVICE CODE

SUBJECT

CONTRACTING OFFICE'S

ZIP-CODE

SOLICITATION NUMBER

BASE NOTICE TYPE

RESPONSE DATE/TIME/ZONE

ARCHIVE

DAYS AFTER THE RESPONSE DATE

RECOVERY ACT FUNDS

SET-ASIDE

NAICS CODE

CONTRACTING OFFICE

ADDRESS

POINT OF CONTACT

(POC Information Automatically Filled from User Profile Unless Entered)

DESCRIPTION

See Attachment

AGENCY'S URL

URL DESCRIPTION

AGENCY CONTACT'S EMAIL

ADDRESS

EMAIL DESCRIPTION

ADDRESS

POSTAL CODE

COUNTRY

ADDITIONAL INFORMATION

GENERAL INFORMATION

PLACE OF PERFORMANCE

* = Required Field Contract Opportunity Amendment to a Previous Combined Solicitation Amendment A0001 Paging System 20006 36C10E20Q0259 09-11-2020 15:00

EASTERN TIME, NEW YORK, USA

N

SDVOSBC

334310 Department of Veterans Affairs Veterans Benefits Administration Office of Acquisition 1800 G. Street N.W.

Washington DC 20006 Contract Specialist Raymond Tracey raymond.tracey@va.gov 716-430-4684

00968 Puerto Rico

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF

CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND

DATE SPECIFIED MAY

is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:

(Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by lett er or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO P

URSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR

(48 CFR) 53.243

(Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modif ication and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE

CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 00101 Department of Veterans Affairs Veterans Benefits Administration Office of Acquisition 1800 G. Street N.W.

Washington DC 20006 00101 Department of Veterans Affairs Veterans Benefits Administration Office of Acquisition 1800 G. Street N.W.

Washington DC 20006

ALL OFFERORS

36C10E20Q0259 08-26-2020

X

N/A X

See attached Q&A

Amendment 0001 36C10E20Q0259 Response to Contractor Questions and confirmation of due date and time.

1. Date Quotes are due is 9/11/2020 3: PM.

1. Is Project tax exempt? The US Federal government is tax exempt

1. Price schedule page shows 2 CLINs. Clin 0001 has “Labor” to install PA system. Clin 0002 is asking for “Install” and “Test”. Should “install” and “Test” be removed from CLIN 0002 since it is part of CLIN 0001 SOW to install and test to make sure system is working, and make CLIN 0002 for “Training” only? Contractors can structure the quote as they deem necessary as long it meets the requirements of the SOW and RFQ.

1. Are drawings that show floor plans available? no basement layout available, available drawings will be emailed if needed to interested parties who confirmed intent to quote.

1. Is PA cabling required to be in conduit 100% all the way? This will have to factored by you and how you interpret the RFQ SOW/RFQ.

1. What floors Do Not require PA cabling conduit installation and allow use of J-hooks? Same as question 5.

1. What floors require PA cabling conduit installation? Same as question 5

1. On what floors j-hooks can be used instead of installing conduit? Same as question 5

1. Was the site visit mandatory? Ni it was not, each interested party would have had to determine that themselves. Facility is in San Juan PR. COVID 19 Restrictions had to be factored in so it was not made mandatory.

File details come from the government source that posted it. Updated .