36C10E20Q0259 0001_1.docx
DOCX document 30 KB Posted
- Attached to
- 5830--Amendment A0001 Paging System Federal contract opportunity
- Solicitation number
- 36C10E20Q0259
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Rules of Behavior.pdf | ||
| Subcontractor Verification SDVOSB Work Sheet.doc | DOC document | |
| 36C10E20Q0259.docx | DOCX document | |
| 36C10E20Q0259 Past Performance Survey.pdf | ||
| RevSow 08-25-2020.pdf | ||
| 2015-5707 REV13.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contract Opportunity Amendment to a Previous Combined Solicitation
PRODUCT SERVICE CODE
SUBJECT
CONTRACTING OFFICE'S
ZIP-CODE
SOLICITATION NUMBER
BASE NOTICE TYPE
RESPONSE DATE/TIME/ZONE
ARCHIVE
DAYS AFTER THE RESPONSE DATE
RECOVERY ACT FUNDS
SET-ASIDE
NAICS CODE
CONTRACTING OFFICE
ADDRESS
POINT OF CONTACT
(POC Information Automatically Filled from User Profile Unless Entered)
DESCRIPTION
See Attachment
AGENCY'S URL
URL DESCRIPTION
AGENCY CONTACT'S EMAIL
ADDRESS
EMAIL DESCRIPTION
ADDRESS
POSTAL CODE
COUNTRY
ADDITIONAL INFORMATION
GENERAL INFORMATION
PLACE OF PERFORMANCE
* = Required Field Contract Opportunity Amendment to a Previous Combined Solicitation Amendment A0001 Paging System 20006 36C10E20Q0259 09-11-2020 15:00
EASTERN TIME, NEW YORK, USA
N
SDVOSBC
334310 Department of Veterans Affairs Veterans Benefits Administration Office of Acquisition 1800 G. Street N.W.
Washington DC 20006 Contract Specialist Raymond Tracey raymond.tracey@va.gov 716-430-4684
00968 Puerto Rico
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF
CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND
DATE SPECIFIED MAY
is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:
(Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by lett er or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO P
URSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR
(48 CFR) 53.243
(Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modif ication and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE
CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 00101 Department of Veterans Affairs Veterans Benefits Administration Office of Acquisition 1800 G. Street N.W.
Washington DC 20006 00101 Department of Veterans Affairs Veterans Benefits Administration Office of Acquisition 1800 G. Street N.W.
Washington DC 20006
ALL OFFERORS
36C10E20Q0259 08-26-2020
X
N/A X
See attached Q&A
Amendment 0001 36C10E20Q0259 Response to Contractor Questions and confirmation of due date and time.
1. Date Quotes are due is 9/11/2020 3: PM.
1. Is Project tax exempt? The US Federal government is tax exempt
1. Price schedule page shows 2 CLINs. Clin 0001 has “Labor” to install PA system. Clin 0002 is asking for “Install” and “Test”. Should “install” and “Test” be removed from CLIN 0002 since it is part of CLIN 0001 SOW to install and test to make sure system is working, and make CLIN 0002 for “Training” only? Contractors can structure the quote as they deem necessary as long it meets the requirements of the SOW and RFQ.
1. Are drawings that show floor plans available? no basement layout available, available drawings will be emailed if needed to interested parties who confirmed intent to quote.
1. Is PA cabling required to be in conduit 100% all the way? This will have to factored by you and how you interpret the RFQ SOW/RFQ.
1. What floors Do Not require PA cabling conduit installation and allow use of J-hooks? Same as question 5.
1. What floors require PA cabling conduit installation? Same as question 5
1. On what floors j-hooks can be used instead of installing conduit? Same as question 5
1. Was the site visit mandatory? Ni it was not, each interested party would have had to determine that themselves. Facility is in San Juan PR. COVID 19 Restrictions had to be factored in so it was not made mandatory.