36C10B19Q0282-004.docx

DOCX document 241 KB Posted

Attached to
Event Management Services SaaS Federal contract opportunity
Solicitation number
36C10B19Q0282
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

36C10B19Q0282 36C10B19Q0282_4.docx

View the file

Other files for this federal contract opportunity

Other files attached to Event Management Services SaaS, newest first.
File Type Posted
36C10B19C0029-000.docx DOCX document
36C10B19Q0282-003.docx DOCX document
36C10B19Q0282-002.docx DOCX document
36C10B19Q0282-000.docx DOCX document
36C10B19Q0282-001.zip ZIP file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FedBizOpps Amendment to a Previous Combined Solicitation

CLASSIFICATION CODE

SUBJECT

CONTRACTING OFFICE'S

ZIP-CODE

SOLICITATION NUMBER

BASE NOTICE TYPE

RESPONSE

DATE (MM-DD-YYYY)

ARCHIVE

DAYS AFTER THE RESPONSE DATE

RECOVERY ACT FUNDS

SET-ASIDE

NAICS CODE

CONTRACTING OFFICE

ADDRESS

POINT OF CONTACT

(POC Information Automatically Filled from User Profile Unless Entered)

DESCRIPTION

See Attachment

AGENCY'S URL

URL DESCRIPTION

AGENCY CONTACT'S EMAIL

ADDRESS

EMAIL DESCRIPTION

ADDRESS

POSTAL CODE

COUNTRY

ADDITIONAL INFORMATION

GENERAL INFORMATION

PLACE OF PERFORMANCE

* = Required Field FedBizOpps Amendment to a Previous Combined Solicitation Rev. March 2010 D Event Management Services SaaS 07724 36C10B19Q0282

COMBINE

04-05-2019 N 541519 Department of Veterans Affairs Technology Acquisition Center 23 Christopher Way Eatontown NJ 07724 George Govich, george.govich@va.gov george.govich@va.gov george.govich@va.gov This amendment to RFQ 36C10B19Q0282 is to extend the due date and time.

Question/Comment
Government Response
Would the Government consider issuing a 10-day extension due to the level of effort required for submission?
The Government will extend the due date and time to April 5, 2019 at 2PM EST.
The FBO page states NAICS 541519 which is a $27.5M NAICS and also identifies this as a SDVOSB requirement, however, the SF1449 in the RFQ document Item #10 has only the SB option checked, it does not reflect a NAICS and identifies this as a $15.5M acquisition. Which is the correct set aside and size standard?
This is a SDVOSB set aisde. The NAICS is 541519 and the size standard is $27.5M. See revised 1449.
If this indeed is a SDVOSB and not only a SB, is the SDVOSB required to have a CVE certification?
Yes, SDVOSBs are required to have a CVE certification.

Is this the same opportunity as 36U10119Q0021 RFI (Event Management System Software as a Service) released with NAICS 541511 by Ray Dockery (OSDBU) through COMPASS on January 18, 2019?

Yes, this is for the same opportunity that was previously publicized.

As we see the due date is 4/4/2019 (RFP released on 4/1/2019), Did the agency already identify any specific vendor for the requirement? It is impossible for any company to submit a quote within 3 days.

Due to this being previously publicized and the minimal documentation that is required for Phase I, the Government is confident that quotes can be submitted within 3 days.

Whether companies from Outside USA can apply for this?

(like,from India or Canada) This is a SDVOSB set aside. Companies must be a registered SDVOSB.

Whether we need to come over there for meetings?
Yes, travel is required to attend program-related meetings or conferences throughout the PoP

Can we perform the tasks (related to RFP) outside USA?

(like, from India or Canada) The EMSS solution must meet all VA security requirements

Can we submit the proposals via email?
No, must be submitted in VOA.

PAGE 1 OF

1. REQUISITION NO.

2.

CONTRACT NO.

3. AWARD/EFFECTIVE DATE

4. ORDER NO.

5. SOLICITATION NUMBER

6. SOLICITATION ISSUE DATE

a. NAME

b. TELEPHONE NO. (No Collect Calls)

8. OFFER DUE DATE/LOCAL

TIME

9. ISSUED BY

CODE

10. THIS ACQUISITION IS

UNRESTRICTED OR

SET ASIDE:

% FOR:

SMALL BUSINESS

HUBZONE SMALL

BUSINESS

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

WOMEN-OWNED SMALL BUSINESS

(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

8(A)

NAICS:

SIZE STANDARD:

11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

12. DISCOUNT TERMS

13a. THIS CONTRACT IS A

RATED ORDER UNDER

DPAS (15 CFR 700)

13b. RATING

14. METHOD OF SOLICITATION

RFQ

IFB

RFP

15. DELIVER TO

CODE

16. ADMINISTERED BY

CODE

17a. CONTRACTOR/OFFEROR

CODE

FACILITY CODE

18a. PAYMENT WILL BE MADE BY

CODE

TELEPHONE NO.

DUNS:

DUNS+4:

PHONE:

FAX:

17b. CHECK IF REMITTANCE IS

DIFFERENT AND PUT SUCH ADDRESS IN OFFER

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS CHECKED

SEE ADDENDUM

19.

20.

21.

22.

23.

24.

ITEM NO.

SCHEDULE OF SUPPLIES/SERVICES

QUANTITY

UNIT

UNIT

PRICE

AMOUNT

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA

26. TOTAL AWARD AMOUNT (For Govt. Use Only) 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52

.212-5 ARE ATTACHED. ADDENDA

ARE

ARE NOT ATTACHED.

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA

ARE

ARE NOT ATTACHED

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN _______________

29. AWARD OF CONTRACT: REF. ___________________________________ OFFER

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

DATED ________________________________

. YOUR OFFER ON SOLICITATION

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED

SET FORTH HEREIN IS

ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER) 30b. NAME AND TITLE OF SIGNER (TYPE OR PRINT) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (TYPE OR PRINT)

c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION

(REV. 2/2012)

PREVIOUS EDITION IS NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.212

7. FOR SOLICITATION

INFORMATION CALL:

STANDARD FORM 1449

OFFEROR TO COMPLETE BLOCKS 12, 17, 23,

24, & 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

101-19-2-4288-0018 36C10B19Q0282 04-01-2019 George Govich 732-440-9692 04-0 -2019

PM EST

Department of Veterans Affairs Technology Acquisition Center 23 Christopher Way Eatontown NJ 07724 X x 27.5 Million X N/A X See Delivery Schedule See Delivery Schedule See Delivery Schedule Eatontown NJ 07724 Department of Veterans Affairs Technology Acquisition Center 23 Christopher Way Eatontown NJ 07724

TBD

Department of Veterans Affairs Technology Acquisition Center Financial Services Center PO Box 149971 Austin TX 78714-8971 Project Title: Event Management Software as a Service (EMSS) POCs:

CO: Debra Clayton; 732-795-1015; debra.clayton2@va.gov CS: George Govich; 732-440-9692; george.govich@va.gov

101-36X4537-4288-629000-2580 4537FC1BD

X X Debra G. Clayton Contracting Officer Table of Contents

SECTION A3
A.1 SF 1449 SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS3
SECTION B - CONTINUATION OF SF 1449 BLOCKS6
B.1 CONTRACT ADMINISTRATION DATA6
B.2 GOVERNING LAW7
B.3 SOFTWARE LICENSE, MAINTENANCE AND TECHNICAL SUPPORT7
B.4 PRICE SCHEDULE9
B.5 PERFORMANCE WORK STATEMENT33
1.0BACKGROUND34
2.0APPLICABLE DOCUMENTS34
3.0SCOPE OF WORK37
4.0PERFORMANCE DETAILS37
4.1PERFORMANCE PERIOD37
4.2PLACE OF PERFORMANCE38
4.3TRAVEL38
5.0SPECIFIC TASKS AND DELIVERABLES40
5.1PROJECT MANAGEMENT40
5.1.1REPORTING REQUIREMENTS40
5.1.2TECHNICAL KICKOFF MEETING41
5.1.3ONBOARDING41
5.2EVENT MANAGEMENT SOFTWARE AS A SERVICE (EMSS)41
5.2.1EMSS CORE CAPABILITIES42
5.2.2INTEGRATION43
5.2.3EMSS TRAINING44
5.2.4REMOTE TECHNICAL SUPPORT/HELP DESK45
5.2.5ON-SITE TECHNICAL SUPPORT/HELP DESK46
5.2.6OPERATIONS AND MAINTENANCE SUPPORT47
5.2.7SECURITY48
5.3OPTIONAL TASK 1 - PHASE-OUT TRANSITION SUPPORT48
5.4OPTIONAL TASK 2 – REMOTE TECHNICAL SUPPORT SURGE49
5.5OPTIONAL TASK 3 – ADDITIONAL EMSS ENHANCEMENTS50
6.0GENERAL REQUIREMENTS50
6.1ENTERPRISE AND IT FRAMEWORK50
6.1.1VA TECHNICAL REFERENCE MODEL50
6.1.2FEDERAL IDENTITY, CREDENTIAL, AND ACCESS MANAGEMENT (FICAM)51
6.1.3INTERNET PROTOCOL VERSION 6 (IPV6)52
6.1.4TRUSTED INTERNET CONNECTION (TIC)52
6.1.5STANDARD COMPUTER CONFIGURATION52
6.1.6VETERAN FOCUSED INTEGRATION PROCESS (VIP)53
6.1.7PROCESS ASSETT LIBRARY (PAL)53
6.1.8AUTHORITATIVE DATA SOURCES53
6.2SECURITY AND PRIVACY REQUIREMENTS54
6.2.1POSITION/TASK RISK DESIGNATION LEVEL(S)54
6.2.2CONTRACTOR PERSONNEL SECURITY REQUIREMENTS55
6.3METHOD AND DISTRIBUTION OF DELIVERABLES56
6.4PERFORMANCE METRICS57
6.5FACILITY/RESOURCE PROVISIONS57
6.6GOVERNMENT FURNISHED PROPERTY58
6.7SHIPMENT OF HARDWARE OR EQUIPMENT60
ADDENDUM A – ADDITIONAL VA REQUIREMENTS, CONSOLIDATED61
ADDENDUM B – VA INFORMATION AND INFORMATION SYSTEM SECURITY/PRIVACY LANGUAGE67
SECTION C - CONTRACT CLAUSES77
C.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)77
C.2 52.204-21 BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION SYSTEMS (JUN 2016)77
C.3 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS—COMMERCIAL ITEMS (JAN 2019)79
C.4 52.217-7 OPTION FOR INCREASED QUANTITY—SEPARATELY PRICED LINE ITEM (MAR 1989)86
C.5 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)86
C.6 VAAR 852.203-70 COMMERCIAL ADVERTISING (MAY 2018)86
C.7 VAAR 852.219-10 VA NOTICE OF TOTAL SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS SET-ASIDE (JUL 2016)(DEVIATION)87
C.8 VAAR 852.219-74 LIMITATIONS ON SUBCONTRACTING—MONITORING AND COMPLIANCE (JUL 2018)88
C.9 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2018)88
C.10 VAAR 852.237-70 CONTRACTOR RESPONSIBILITIES (APR 1984)89
C.11 VAAR 852.270-1 REPRESENTATIVES OF CONTRACTING OFFICERS (JAN 2008)90
SECTION D - CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS91
SECTION E - SOLICITATION PROVISIONS92
E.1 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)92
E.2 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018)92
E.3 52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS—COMMERCIAL ITEMS (OCT 2018)93
E.4 52.233-2 SERVICE OF PROTEST (SEP 2006)110
E.5 VAAR 852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE RESOLUTION (OCT 2018)110
E.6 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018)111
E.7 BASIS FOR AWARD111
E.8 PROPOSAL SUBMISSION INSTRUCTIONS112

SECTION B - CONTINUATION OF SF 1449 BLOCKS

B.1 CONTRACT ADMINISTRATION DATA

1. Contract Administration: All contract administration matters will be handled by the following individuals:

a. CONTRACTOR: TBD

b. GOVERNMENT: Contracting Officer 36C10B Debra G. Clayton Department of Veterans Affairs Technology Acquisition Center 23 Christopher Way Eatontown NJ 07724

2. CONTRACTOR REMITTANCE ADDRESS: All payments by the Government to the contractor will be made in accordance with:

[x]
52.232-33, Payment by Electronic Funds Transfer—System For Award Management, or
[]
52.232-36, Payment by Third Party

3. INVOICES: Invoices shall be submitted in arrears:

a. Quarterly[]
b. Semi-Annually[]
c. Other[x] In accordance with Price Schedule

4. GOVERNMENT INVOICE ADDRESS: All Invoices from the contractor shall be submitted electronically in accordance with VAAR Clause 852.232-72 Electronic Submission of Payment Requests.

Department of Veterans Affairs Technology Acquisition Center Financial Services Center PO Box 149971 Austin TX 78714-8971 ACKNOWLEDGMENT OF AMENDMENTS: The offeror acknowledges receipt of amendments to the Solicitation numbered and dated as follows:

AMENDMENT NO
DATE

B.2 GOVERNING LAW

Federal law and regulations, including the Federal Acquisition Regulations (FAR), shall govern this Contract/Order. Commercial license agreements may be made a part of this Contract/Order but only if both parties expressly make them an addendum hereto. If the commercial license agreement is not made an addendum, it shall not apply, govern, be a part of or have any effect whatsoever on the Contract/Order; this includes, but is not limited to, any agreement embedded in the computer software (clickwrap), any agreement that is otherwise delivered with or provided to the Government with the commercial computer software or documentation (shrinkwrap), or any other license agreement otherwise referred to in any document. If a commercial license agreement is made an addendum, only those provisions addressing data rights regarding the Government’s use, duplication and disclosure of data (e.g., restricted computer software) are included and made a part of this Contract/Order, and only to the extent that those provisions are not duplicative or inconsistent with Federal law, Federal regulation, the incorporated FAR clauses and the provisions of this Contract/Order; those provisions in the commercial license agreement that do not address data rights regarding the Government’s use, duplication and disclosure of data shall not be included or made a part of the Contract/Order. Federal law and regulation including, without limitation, the Contract Disputes Act (41 U.S.C. § 7101 et seq.), the Anti-Deficiency Act (31 U.S.C. § 1341 et seq.), the Competition in Contracting Act (41 U.S.C. § 3301 et seq.), the Prompt Payment Act (31 U.S.C. §3901 et seq.), Contracts for Data Processing or Maintenance (38 USC § 5725), and FAR clauses 52.212-4, 52.227-14, 52.227-19 shall supersede, control, and render ineffective any inconsistent, conflicting, or duplicative provision in any commercial license agreement. In the event of conflict between this Clause and any provision in the Contract/Order or the commercial license agreement or elsewhere, the terms of this Clause shall prevail. Claims of patent or copyright infringement brought against the Government as a party shall be defended by the U.S. Department of Justice (DOJ). 28 U.S.C. § 516. At the discretion of DOJ, the Contractor may be allowed reasonable participation in the defense of the litigation. Any additional changes to the Contract/Order must be made by contract/order modification (Standard Form 30) and shall only be effected by a warranted Contracting Officer. Nothing in this Contract/Order or any commercial license agreement shall be construed as a waiver of sovereign immunity.

B.3 SOFTWARE LICENSE, MAINTENANCE AND TECHNICAL SUPPORT

Software License, Maintenance and Technical Support:

1. Definitions.

1. Licensee. The term “licensee” shall mean the U.S. Department of Veterans Affairs (“VA”) and is synonymous with “Government.”

1. Licensor. The term “licensor” shall mean the contractor having the necessary license or ownership rights to deliver license, software maintenance and support of the computer software being acquired. The term “contractor” is the party identified in Block 17a on the SF1449. If the contractor is a reseller and not the Licensor, the contractor remains responsible for performance under this order.

1. Software. The term “software” shall mean the licensed computer software product(s) cited in the Schedule of Supplies/Services.

1. Maintenance. The term “maintenance” is the process of enhancing and optimizing software, as well as remedying defects. It shall include all new fixes, patches, releases, updates, versions and upgrades, as further defined below.

1. Technical Support. The term “technical support” refers to the range of services providing assistance for the software via the telephone, email, a website or otherwise.

1. Release or Update. The term “release” or “update” are terms that refer to a revision of software that contains defect corrections, minor enhancements or improvements of the software’s functionality. This is usually designated by a change in the number to the right of the decimal point (e.g., from Version 5.3 to 5.4). An example of an update is the addition of new hardware.

1. Version or Upgrade. The term “version” or “upgrade” are terms that refer to a revision of software that contains new or improved functionality. This is usually designated by a change in the number to the left of the decimal point (e.g., from Version 5.4 to 6).

1. Software License

1. Unless otherwise stated in the Schedule of Supplies/Services, the Performance Work Statement or Product Description, the software license provided to the Government is a perpetual, nonexclusive license to use the software

1. The Government may use the software in a networked environment.

1. Any dispute regarding the license grant or usage limitations shall be resolved in accordance with the Disputes Clause incorporated in FAR 52.212-4(d).

1. All limitations of software usage are expressly stated in the Schedule of Supplies/Services and the Performance Work Statement/Product Description.

1. Software Maintenance and Technical Support

1. If the Government desires to continue software maintenance and support beyond the period of performance identified in this contract or order, the Government will issue a separate contract or order for maintenance and support. Conversely, if a contract or order for continuing software maintenance and technical support is not received the contractor is neither authorized nor permitted to renew any of the previously furnished services.

1. The contractor shall provide software support services, which includes periodic updates, enhancements and corrections to the software, and reasonable technical support, all of which are customarily provided by the contractor to its commercial customers so as to cause the software to perform according to its specifications, documentation or demonstrated claims.

1. Any telephone support provided by contractor shall be at no additional cost.

1. The contractor shall provide all maintenance services in a timely manner in accordance with the contractor’s customary practice or as defined in the Performance Work Statement/Product Description. However, prolonged delay (exceeding 2 business days) in resolving software problems will be noted in the Government’s various past performance records on the contractor (e.g., www.ppirs.gov).

1. If the Government allows the maintenance and support to lapse and subsequently wishes to reinstate it, any reinstatement fee charged shall not exceed the amounts that would have been charged if the Government had not allowed the subscription to lapse.

1. Disabling Software Code. The Government requires delivery of computer software that does not contain any code that will, upon the occurrence or the nonoccurrence of any event, disable the software. Such code includes but is not limited to a computer virus, restrictive key, node lock, time-out or other function, whether implemented by electronic, mechanical, or other means, which limits or hinders the use or access to any computer software based on residency on a specific hardware configuration, frequency of duration of use, or other limiting criteria. If any such disabling code is present, the contractor agrees to indemnify the Government for all damages suffered as a result of a disabling caused by such code, and the contractor agrees to remove such code upon the Government’s request at no extra cost to the Government. Inability of the contractor to remove the disabling software code will be considered an inexcusable delay and a material breach of contract, and the Government may exercise its right to terminate for cause. In addition, the Government is permitted to remove the code as it deems appropriate and charge the Contractor for consideration for the time and effort expended in removing the code.

Manuals and Publications. Upon Government request, the contractor shall furnish the most current version of the user manual and publications for all products/services provided under this contract or order at no cost.

B.4 PRICE SCHEDULE

Note: Days used in the table below refer to calendar days unless otherwise stated. Deliverables with due dates falling on a weekend or holiday shall be submitted the following Government work day after the weekend or holiday.

Electronic submission to: VA PM, COR, CO Inspection: destination Acceptance: destination

BASE PERIOD

April 14, 2019 through April 13, 2020.

CLIN/ SLIN
DESCRIPTION
QTY
UNIT
UNIT PRICE
TOTAL PRICE
0001
Project Management in accordance with (IAW) Performance Work Statement (PWS) paragraph 5.1 and 6.0

This FFP CLIN includes all labor, material, and other costs required for the successful completion of the services detailed in PWS paragraph 5.1 and 6.0 and all its subparagraphs.

The period of performance (PoP) shall be 12 months from date of award.

12
MO
NSP
NSP
0001AA
Monthly Progress Report IAW PWS paragraph 5.1.1

Due the fifth day of each month throughout the PoP.

1
LT
NSP
NSP
0001AB
Monthly Onboarding Status Report IAW PWS paragraph 5.1.3

Due the fifth day of each month throughout the PoP.

1
LT
NSP
NSP
0001AC
Contractor Staff Roster IAW PWS paragraph 6.2.2

Due 3 days after contract award and updated throughout the PoP.

1
EA
NSP
NSP
0002
Event Management Services - Event Management Web-Based Software as a Service shall be provided IAW PWS paragraph 5.2.

This FFP CLIN includes all labor, material, and other costs required for the successful completion of the services detailed in PWS paragraph 5.2 and all its subparagraphs.

Due within 30 days of award and shall be available for use throughout the PoP.

1
LT
$
$
0002AA
User Documentation for Web API IAW PWS paragraph 5.2

Due 30 days after contract award and updated throughout the PoP.

1
LT
NSP
NSP
0002AB
Hosted Non-Production Environment IAW PWS paragraph 5.2.1

Due 30 days after contract award

1
LT
NSP
NSP
0002AC
Hosted Production Environment IAW PWS paragraph 5.2.1

Due 30 days after contract award

1
LT
NSP
NSP
0002AD
Super User/Admin Training Package IAW PWS paragraph 5.2.3

Due five (5) days prior to initial production release and updated throughout the PoP to reflect systems updates, modification, or enhancements.

1
LT
$
$
0002AE
End User Training Packages IAW PWS paragraph 5.2.3

Due five (5) days prior to initial production release and updated throughout the PoP to reflect systems updates, modification, or enhancements.

1
LT
$
$
0002AF
Online User Guides/Videos IAW PWS paragraph 5.2.3

Due five (5) days prior to initial production release and updated throughout the PoP to reflect systems updates, modification, or enhancements.

1
LT
$
$
0002AG
Remote Technical Support/Help Desk IAW PWS paragraph 5.2.4

The PoP shall be 12 months from date of award.

12
MO
$
$
0002AH
On-Site Technical Support/Help Desk IAW PWS paragraph 5.2.5

The PoP shall coincide with the length of each Direct Access Program event, up to a maximum of 8 events during the base period.

8
EA
$
NTE
0002AJ
Operation and Maintenance (O&M) support IAW PWS paragraph 5.2.6

The PoP shall be 12 months from date of award.

12
MO
$
$
0002AK
Plan of Action and Milestones IAW PWS paragraph 5.2.7

Due 30 days after contract award and updated throughout the PoP.

1
LT
NSP
NSP
0003
Travel IAW PWS paragraph 4.3

Travel may be required during performance of the contract and shall not exceed the budget estimate set forth herein. All travel shall be billed at Government rates IAW the Federal Travel Regulation.

The Contractor’s fixed handling rate, as set forth herein, may be applied to the billable travel cost.

Profit shall not be applied. Travel shall be approved by the COR in advance and in writing.

The fixed handling rate on travel is ____% The Contractor shall only invoice for trips actually taken.

1
LT

NTE

BASE PERIOD TOTAL
$

BASE PERIOD OPTIONAL TASK TWO

The following optional task may be exercised at any time during the base period IAW FAR 52.217-7, Option for Increased Quantity – Separately Priced Line Item. Work shall not commence until, and unless, a formal modification is issued by the CO.

0004
Remote Technical Support Surge IAW PWS paragraph 5.4

This FFP CLIN includes all labor, material, and other costs required for the successful completion of the services detailed in PWS paragraph 5.4.

The PoP shall be no earlier than three months prior to the event and no later than 30 days prior to the event start date. The period of performance shall not exceed the Base Period end date.

1
EA
$
$
BASE PERIOD OPTIONAL TASK 2 TOTAL
$

BASE PERIOD OPTIONAL TASK THREE

The following optional task may be exercised at any time during the base period up to two times IAW FAR 52.217-7, Option for Increased Quantity – Separately Priced Line Item. Work shall not commence until, and unless, a formal modification is issued by the CO.

0005
Additional EMSS Enhancements – Low Level of Effort (LOE) IAW PWS paragraph 5.5

This FFP CLIN includes all labor, material, and other costs required for the successful completion of the services detailed in PWS paragraph 5.5.

The solution shall be implemented in no more than two weeks after exercise of the optional task. The period of performance shall not exceed the Base Period end date.

The Contractor shall only invoice for completed enhancements.

4
EA
$
$
0006
Additional EMSS Enhancements – Medium LOE IAW PWS paragraph 5.5

This FFP CLIN includes all labor, material, and other costs required for the successful completion of the services detailed in PWS paragraph 5.5.

The solution shall be implemented in no more than four weeks after exercise of the optional task. The period of performance shall not exceed the Base Period end date.

The Contractor shall only invoice for completed enhancements.

1
EA
$
$
BASE PERIOD OPTIONAL TASK 3 TOTAL
$
BASE PERIOD PLUS ALL OPTIONAL TASKS TOTAL
$

OPTION PERIOD ONE

This Option may be exercised by the Government in accordance with FAR 52.217-9, Option to Extend the Term of the Contract (Mar 2000). Work shall not commence until, and unless, a formal modification is issued by the Contracting Officer. If exercised, this option shall commence immediately after expiration of the base period.

April 14, 2020 through April 13, 2021.

CLIN/ SLIN
DESCRIPTION
QTY
UNIT
UNIT PRICE
TOTAL PRICE
1001
Project Management in accordance with (IAW) Performance Work Statement (PWS) paragraph 5.1 and 6.0

This FFP CLIN includes all labor, material, and other costs required for the successful completion of the services detailed in PWS paragraph 5.1 and 6.0 and all its subparagraphs.

The period of performance (PoP) shall be 12 months beginning immediately after the Base Period.

12
MO
NSP
NSP
1001AA
Monthly Progress Report IAW PWS paragraph 5.1.1

Due the fifth day of each month throughout the PoP.

1
LT
NSP
NSP
1001AB
Monthly Onboarding Status Report IAW PWS paragraph 5.1.3

Due the fifth day of each month throughout the PoP.

1
LT
NSP
NSP
1001AC
Contractor Staff Roster IAW PWS paragraph 6.2.2

Updated throughout the PoP.

1
LT
NSP
NSP
1002
Event Management Services - Event Management Web-Based Software as a Service shall be provided IAW PWS paragraph 5.2.

This FFP CLIN includes all labor, material, and other costs required for the successful completion of the services detailed in PWS paragraph 5.2 and all its subparagraphs.

Shall be available for use throughout the PoP.

1
LT
$
$
1002AA
User Documentation for Web API IAW PWS paragraph 5.2

Updated throughout the PoP.

1
LT
NSP
NSP
1002AB
Hosted Non-Production Environment IAW PWS paragraph 5.2.1

Maintained throughout the PoP.

1
LT
NSP
NSP
1002AC
Hosted Production Environment IAW PWS paragraph 5.2.1

Maintained throughout the PoP.

1
LT
NSP
NSP
1002AD
Super User/Admin Training Package IAW PWS paragraph 5.2.3

Updated throughout the PoP to reflect systems updates, modification, or enhancements.

1
LT
$
$
1002AE
End User Training Packages IAW PWS paragraph 5.2.3

Updated throughout the PoP to reflect systems updates, modification, or enhancements.

1
LT
$
$
1002AF
Online User Guides/Videos IAW PWS paragraph 5.2.3

Updated throughout the PoP to reflect systems updates, modification, or enhancements.

1
LT
$
$
1002AG
Remote Technical Support/Help Desk IAW PWS paragraph 5.2.4

The PoP shall be 12 months beginning immediately after the Base Period.

12
MO
$
$
1002AH
On-Site Technical Support/Help Desk IAW PWS paragraph 5.2.5

The PoP shall coincide with the length of each Direct Access Program event, up to a maximum of 8 events during Option Period One.

8
EA
$
NTE
1002AJ
Operation and Maintenance (O&M) support IAW PWS paragraph 5.2.6

The PoP shall be 12 months beginning immediately after the Base Period.

12
MO
$
$
1002AK
Plan of Action and Milestones IAW PWS paragraph 5.2.7

Updated throughout the PoP.

1
LT
NSP
NSP
1003
Travel IAW PWS paragraph 4.3

Travel may be required during performance of the contract and shall not exceed the budget estimate set forth herein. All travel shall be billed at Government rates IAW the Federal Travel Regulation.

The Contractor’s fixed handling rate, as set forth herein, may be applied to the billable travel cost.

Profit shall not be applied. Travel shall be approved by the COR in advance and in writing.

The fixed handling rate on travel is ____% The Contractor shall only invoice for trips actually taken.

1
LT

NTE

OPTION PERIOD 1 TOTAL
$

OPTION PERIOD ONE OPTIONAL TASK TWO

The following optional task may be exercised at any time during Option Period 1 IAW FAR 52.217-7, Option for Increased Quantity – Separately Priced Line Item. Work shall not commence until, and unless, a formal modification is issued by the CO.

1004
Remote Technical Support Surge IAW PWS paragraph 5.4

This FFP CLIN includes all labor, material, and other costs required for the successful completion of the services detailed in PWS paragraph 5.4.

The PoP shall be no earlier than three months prior to the event and no later than 30 days prior to the event start date. The Period of performance shall not exceed Option Period One end date.

1
EA
$
$
OPTION PERIOD 1 OPTIONAL TASK 2 TOTAL
$

OPTION PERIOD ONE OPTIONAL TASK THREE

The following optional task may be exercised at any time during the Option Period 1 up to two times IAW FAR 52.217-7, Option for Increased Quantity – Separately Priced Line Item. Work shall not commence until, and unless, a formal modification is issued by the CO.

1005
Additional EMSS Enhancements – Low Level of Effort (LOE) IAW PWS paragraph 5.5

This FFP CLIN includes all labor, material, and other costs required for the successful completion of the services detailed in PWS paragraph 5.5.

The solution shall be implemented in no more than two weeks after exercise of the optional task. The Period of performance shall not exceed Option Period One end date.

The Contractor shall only invoice for completed enhancements.

4
EA
$
$
1006
Additional EMSS Enhancements – Medium LOE IAW PWS paragraph 5.5

This FFP CLIN includes all labor, material, and other costs required for the successful completion of the services detailed in PWS paragraph 5.5.

The solution shall be implemented in no more than four weeks after exercise of the optional task. The Period of performance shall not exceed Option Period One end date.

The Contractor shall only invoice for completed enhancements.

4
EA
$
$
1007
Additional EMSS Enhancements – High LOE IAW PWS paragraph 5.5

This FFP CLIN includes all labor, material, and other costs required for the successful completion of the services detailed in PWS paragraph 5.5.

The solution shall be implemented in no more than eight weeks after exercise of the optional task. The Period of performance shall not exceed Option Period One end date.

The Contractor shall only invoice for completed enhancements.

2
EA
$
$
OPTION PERIOD 1 OPTIONAL TASK 3 TOTAL
$
OPTION PERIOD 1 PLUS ALL OPTIONAL TASKS TOTAL
$

OPTION PERIOD TWO

This Option may be exercised by the Government in accordance with FAR 52.217-9, Option to Extend the Term of the Contract (Mar 2000). Work shall not commence until, and unless, a formal modification is issued by the Contracting Officer. If exercised, this option shall commence immediately after expiration of Option Period 1.

April 14, 2021 through April 13, 2022.

CLIN/ SLIN
DESCRIPTION
QTY
UNIT
UNIT PRICE
TOTAL PRICE
2001
Project Management in accordance with (IAW) Performance Work Statement (PWS) paragraph 5.1 and 6.0

This FFP CLIN includes all labor, material, and other costs required for the successful completion of the services detailed in PWS paragraph 5.1 and 6.0 and all its subparagraphs.

The period of performance (PoP) shall be 12 months beginning immediately after Option Period 1.

12
MO
NSP
NSP
2001AA
Monthly Progress Report IAW PWS paragraph 5.1.1

Due the fifth day of each month throughout the PoP.

1
LT
NSP
NSP
2001AB
Monthly Onboarding Status Report IAW PWS paragraph 5.1.3

Due the fifth day of each month throughout the PoP.

1
LT
NSP
NSP
2001AC
Contractor Staff Roster IAW PWS paragraph 6.2.2

Updated throughout the PoP.

1
LT
NSP
NSP
2002
Event Management Services - Event Management Web-Based Software as a Service shall be provided IAW PWS paragraph 5.2.

This FFP CLIN includes all labor, material, and other costs required for the successful completion of the services detailed in PWS paragraph 5.2 and all its subparagraphs.

Shall be available for use throughout the PoP.

1
LT
$
$
2002AA
User Documentation for Web API IAW PWS paragraph 5.2

Updated throughout the PoP.

1
LT
NSP
NSP
2002AB
Hosted Non-Production Environment IAW PWS paragraph 5.2.1

Maintained throughout the PoP.

1
LT
NSP
NSP
2002AC
Hosted Production Environment IAW PWS paragraph 5.2.1

Maintained throughout the PoP.

1
LT
NSP
NSP
2002AD
Super User/Admin Training Package IAW PWS paragraph 5.2.3

Updated throughout the PoP to reflect systems updates, modification, or enhancements.

1
LT
$
$
2002AE
End User Training Packages IAW PWS paragraph 5.2.3

Updated throughout the PoP to reflect systems updates, modification, or enhancements.

1
LT
$
$
2002AF
Online User Guides/Videos IAW PWS paragraph 5.2.3

Updated throughout the PoP to reflect systems updates, modification, or enhancements.

1
LT
$
$
2002AG
Remote Technical Support/Help Desk IAW PWS paragraph 5.2.4

The PoP shall be 12 months beginning immediately after Option Period 1.

12
MO
$
$
2002AH
On-Site Technical Support/Help Desk IAW PWS paragraph 5.2.5

The PoP shall coincide with the length of each Direct Access Program event, up to a maximum of 8 events during Option Period Two.

8
EA
$
NTE
2002AJ
Operation and Maintenance (O&M) support IAW PWS paragraph 5.2.6

The PoP shall be 12 months beginning immediately after Option Period 1.

12
MO
$
$
2002AK
Plan of Action and Milestones IAW PWS paragraph 5.2.7

Updated throughout the PoP.

1
LT
NSP
NSP
2003
Travel IAW PWS paragraph 4.3

Travel may be required during performance of the contract and shall not exceed the budget estimate set forth herein. All travel shall be billed at Government rates IAW the Federal Travel Regulation.

The Contractor’s fixed handling rate, as set forth herein, may be applied to the billable travel cost.

Profit shall not be applied. Travel shall be approved by the COR in advance and in writing.

The fixed handling rate on travel is ____% The Contractor shall only invoice for trips actually taken.

1
LT

NTE

OPTION PERIOD 2 TOTAL
$

OPTION PERIOD TWO OPTIONAL TASK TWO

The following optional task may be exercised at any time during Option Period 2 IAW FAR 52.217-7, Option for Increased Quantity – Separately Priced Line Item. Work shall not commence until, and unless, a formal modification is issued by the CO.

2004
Remote Technical Support Surge IAW PWS paragraph 5.4

This FFP CLIN includes all labor, material, and other costs required for the successful completion of the services detailed in PWS paragraph 5.4.

The PoP shall be no earlier than three months prior to the event and no later than 30 days prior to the event start date. The Period of performance shall not exceed Option Period Two end date.

1
EA
$
$
OPTION PERIOD 2 OPTIONAL TASK 2 TOTAL
$

OPTION PERIOD TWO OPTIONAL TASK THREE

The following optional task may be exercised at any time during the Option Period 2 up to two times IAW FAR 52.217-7, Option for Increased Quantity – Separately Priced Line Item. Work shall not commence until, and unless, a formal modification is issued by the CO.

2005
Additional EMSS Enhancements – Low Level of Effort (LOE) IAW PWS paragraph 5.5

This FFP CLIN includes all labor, material, and other costs required for the successful completion of the services detailed in PWS paragraph 5.5.

The solution shall be implemented in no more than two weeks after exercise of the optional task. The Period of performance shall not exceed Option Period Two end date.

The Contractor shall only invoice for completed enhancements.

4
EA
$
$
2006
Additional EMSS Enhancements – Medium LOE IAW PWS paragraph 5.5

This FFP CLIN includes all labor, material, and other costs required for the successful completion of the services detailed in PWS paragraph 5.5.

The solution shall be implemented in no more than four weeks after exercise of the optional task. The Period of performance shall not exceed Option Period Two end date.

The Contractor shall only invoice for completed enhancements.

4
EA
$
$
2007
Additional EMSS Enhancements – High LOE IAW PWS paragraph 5.5

This FFP CLIN includes all labor, material, and other costs required for the successful completion of the services detailed in PWS paragraph 5.5.

The solution shall be implemented in no more than eight weeks after exercise of the optional task. The Period of performance shall not exceed Option Period Two end date.

The Contractor shall only invoice for completed enhancements.

2
EA
$
$
OPTION PERIOD 2 OPTIONAL TASK 3 TOTAL
$
OPTION PERIOD 2 PLUS ALL OPTIONAL TASKS TOTAL
$

OPTION PERIOD THREE

This Option may be exercised by the Government in accordance with FAR 52.217-9, Option to Extend the Term of the Contract (Mar 2000). Work shall not commence until, and unless, a formal modification is issued by the Contracting Officer. If exercised, this option shall commence immediately after expiration of Option Period 2.

April 14, 2022 through April 13, 2023.

CLIN/ SLIN
DESCRIPTION
QTY
UNIT
UNIT PRICE
TOTAL PRICE
3001
Project Management in accordance with (IAW) Performance Work Statement (PWS) paragraph 5.1 and 6.0

This FFP CLIN includes all labor, material, and other costs required for the successful completion of the services detailed in PWS paragraph 5.1 and 6.0 and all its subparagraphs.

The period of performance (PoP) shall be 12 months beginning immediately after Option Period 2.

12
MO
NSP
NSP
3001AA
Monthly Progress Report IAW PWS paragraph 5.1.1

Due the fifth day of each month throughout the PoP.

1
LT
NSP
NSP
3001AB
Monthly Onboarding Status Report IAW PWS paragraph 5.1.3

Due the fifth day of each month throughout the PoP.

1
LT
NSP
NSP
3001AC
Contractor Staff Roster IAW PWS paragraph 6.2.2

Updated throughout the PoP.

1
LT
NSP
NSP
3002
Event Management Services - Event Management Web-Based Software as a Service shall be provided IAW PWS paragraph 5.2.

This FFP CLIN includes all labor, material, and other costs required for the successful completion of the services detailed in PWS paragraph 5.2 and all its subparagraphs.

Shall be available for use throughout the PoP.

1
LT
$
$
3002AA
User Documentation for Web API IAW PWS paragraph 5.2

Updated throughout the PoP.

1
LT
NSP
NSP
3002AB
Hosted Non-Production Environment IAW PWS paragraph 5.2.1

Maintained throughout the PoP.

1
LT
NSP
NSP
3002AC
Hosted Production Environment IAW PWS paragraph 5.2.1

Maintained throughout the PoP.

1
LT
NSP
NSP
3002AD
Super User/Admin Training Package IAW PWS paragraph 5.2.3

Updated throughout the PoP to reflect systems updates, modification, or enhancements.

1
LT
$
$
3002AE
End User Training Packages IAW PWS paragraph 5.2.3

Updated throughout the PoP to reflect systems updates, modification, or enhancements.

1
LT
$
$
3002AF
Online User Guides/Videos IAW PWS paragraph 5.2.3

Updated throughout the PoP to reflect systems updates, modification, or enhancements.

1
LT
$
$
3002AG
Remote Technical Support/Help Desk IAW PWS paragraph 5.2.4

The PoP shall be 12 months beginning immediately after Option Period 2.

12
MO
$
$
3002AH
On-Site Technical Support/Help Desk IAW PWS paragraph 5.2.5

The PoP shall coincide with the length of each Direct Access Program event, up to a maximum of 8 events.

8
EA
$
NTE
3002AJ
Operation and Maintenance (O&M) support IAW PWS paragraph 5.2.6

The PoP shall be 12 months beginning immediately after Option Period 2.

12
MO
$
$
3002AK
Plan of Action and Milestones IAW PWS paragraph 5.2.7

Updated throughout the PoP.

1
LT
NSP
NSP
3003
Travel IAW PWS paragraph 4.3

Travel may be required during performance of the contract and shall not exceed the budget estimate set forth herein. All travel shall be billed at Government rates IAW the Federal Travel Regulation.

The Contractor’s fixed handling rate, as set forth herein, may be applied to the billable travel cost.

Profit shall not be applied. Travel shall be approved by the COR in advance and in writing.

The fixed handling rate on travel is ____% The Contractor shall only invoice for trips actually taken.

1
LT

NTE

OPTION PERIOD 3 TOTAL
$

OPTION PERIOD THREE OPTIONAL TASK TWO

The following optional task may be exercised at any time during Option Period 3 IAW FAR 52.217-7, Option for Increased Quantity – Separately Priced Line Item. Work shall not commence until, and unless, a formal modification is issued by the CO.

3004
Remote Technical Support Surge IAW PWS paragraph 5.4

This FFP CLIN includes all labor, material, and other costs required for the successful completion of the services detailed in PWS paragraph 5.4.

The PoP shall be no earlier than three months prior to the event and no later than 30 days prior to the event start date. The Period of performance shall not exceed Option Period Three end date.

1
EA
$
$
OPTION PERIOD 3 OPTIONAL TASK 2 TOTAL
$

OPTION PERIOD THREE OPTIONAL TASK THREE

The following optional task may be exercised at any time during the Option Period 3 up to two times IAW FAR 52.217-7, Option for Increased Quantity – Separately Priced Line Item. Work shall not commence until, and unless, a formal modification is issued by the CO.

3005
Additional EMSS Enhancements – Low Level of Effort (LOE) IAW PWS paragraph 5.5

This FFP CLIN includes all labor, material, and other costs required for the successful completion of the services detailed in PWS paragraph 5.5.

The solution shall be implemented in no more than two weeks after exercise of the optional task. The Period of performance shall not exceed Option Period Three end date.

The Contractor shall only invoice for completed enhancements.

4
EA
$
$
3006
Additional EMSS Enhancements – Medium LOE IAW PWS paragraph 5.5

This FFP CLIN includes all labor, material, and other costs required for the successful completion of the services detailed in PWS paragraph 5.5.

The solution shall be implemented in no more than four weeks after exercise of the optional task. The Period of performance shall not exceed Option Period Three end date.

The Contractor shall only invoice for completed enhancements.

4
EA
$
$
3007
Additional EMSS Enhancements – High LOE IAW PWS paragraph 5.5

This FFP CLIN includes all labor, material, and other costs required for the successful completion of the services detailed in PWS paragraph 5.5.

The solution shall be implemented in no more than eight weeks after exercise of the optional task. The Period of performance shall not exceed Option Period Three end date.

The Contractor shall only invoice for completed enhancements.

2
EA
$
$
OPTION PERIOD 3 OPTIONAL TASK 3 TOTAL
$
OPTION PERIOD 3 PLUS ALL OPTIONAL TASKS TOTAL
$

OPTION PERIOD FOUR

This Option may be exercised by the Government in accordance with FAR 52.217-9, Option to Extend the Term of the Contract (Mar 2000). Work shall not commence until, and unless, a formal modification is issued by the Contracting Officer. If exercised, this option shall commence immediately after expiration of Option Period 3.

April 14, 2023 through April 13, 2024.

CLIN/ SLIN
DESCRIPTION
QTY
UNIT
UNIT PRICE
TOTAL PRICE
4001
Project Management in accordance with (IAW) Performance Work Statement (PWS) paragraph 5.1 and 6.0

This FFP CLIN includes all labor, material, and other costs required for the successful completion of the services detailed in PWS paragraph 5.1 and 6.0 and all its subparagraphs.

The period of performance (PoP) shall be 12 months beginning immediately after Option Period 3.

12
MO
NSP
NSP
4001AA
Monthly Progress Report IAW PWS paragraph 5.1.1

Due the fifth day of each month throughout the PoP.

1
LT
NSP
NSP
4001AB
Monthly Onboarding Status Report IAW PWS paragraph 5.1.3

Due the fifth day of each month throughout the PoP.

1
LT
NSP
NSP
4001AC
Contractor Staff Roster IAW PWS paragraph 6.2.2

Updated throughout the PoP.

1
LT
NSP
NSP
4002
Event Management Services - Event Management Web-Based Software as a Service shall be provided IAW PWS paragraph 5.2.

This FFP CLIN includes all labor, material, and other costs required for the successful completion of the services detailed in PWS paragraph 5.2 and all its subparagraphs.

Shall be available for use throughout the PoP.

1
LT
$
$
4002AA
User Documentation for Web API IAW PWS paragraph 5.2

Updated throughout the PoP.

1
LT
NSP
NSP
4002AB
Hosted Non-Production Environment IAW PWS paragraph 5.2.1

Maintained throughout the PoP.

1
LT
NSP
NSP
4002AC
Hosted Production Environment IAW PWS paragraph 5.2.1

Maintained throughout the PoP.

1
LT
NSP
NSP
4002AD
Super User/Admin Training Package IAW PWS paragraph 5.2.3

Updated throughout the PoP to reflect systems updates, modification, or enhancements.

1
LT
$
$
4002AE
End User Training Packages IAW PWS paragraph 5.2.3

Updated throughout the PoP to reflect systems updates, modification, or enhancements.

1
LT
$
$
4002AF
Online User Guides/Videos IAW PWS paragraph 5.2.3

Updated throughout the PoP to reflect systems updates, modification, or enhancements.

1
LT
$
$
4002AG
Remote Technical Support/Help Desk IAW PWS paragraph 5.2.4

The PoP shall be 12 months beginning immediately after Option Period 3.

12
MO
$
$
4002AH
On-Site Technical Support/Help Desk IAW PWS paragraph 5.2.5

The PoP shall coincide with the length of each Direct Access Program event, up to a maximum of 8 events.

8
EA
$
NTE
4002AJ
Operation and Maintenance (O&M) support IAW PWS paragraph 5.2.6

The PoP shall be 12 months beginning immediately after Option Period 3.

12
MO
$
$
4002AK
Plan of Action and Milestones IAW PWS paragraph 5.2.7

Updated throughout the PoP.

1
LT
NSP
NSP
4003
Travel IAW PWS paragraph 4.3

Travel may be required during performance of the contract and shall not exceed the budget estimate set forth herein. All travel shall be billed at Government rates IAW the Federal Travel Regulation.

The Contractor’s fixed handling rate, as set forth herein, may be applied to the billable travel cost.

Profit shall not be applied. Travel shall be approved by the COR in advance and in writing.

The fixed handling rate on travel is ____% The Contractor shall only invoice for trips actually taken.

1
LT

NTE

OPTION PERIOD 4 TOTAL
$

OPTION PERIOD FOUR OPTIONAL TASK TWO

The following optional task may be exercised at any time during Option Period 4 IAW FAR 52.217-7, Option for Increased Quantity – Separately Priced Line Item. Work shall not commence until, and unless, a formal modification is issued by the CO.

4004
Remote Technical Support Surge IAW PWS paragraph 5.4

This FFP CLIN includes all labor, material, and other costs required for the successful completion of the services detailed in PWS paragraph 5.4.

The PoP shall be no earlier than three months prior to the event and no later than 30 days prior to the event start date. The Period of performance shall not exceed Option Period Four end date.

1
EA
$
$
OPTION PERIOD 4 OPTIONAL TASK 2 TOTAL
$

OPTION PERIOD FOUR OPTIONAL TASK THREE

The following optional task may be exercised at any time during the Option Period 4 up to two times IAW FAR 52.217-7, Option for Increased Quantity – Separately Priced Line Item. Work shall not commence until, and unless, a formal modification is issued by the CO.

4005
Additional EMSS Enhancements – Low Level of Effort (LOE) IAW PWS paragraph 5.5

This FFP CLIN includes all labor, material, and other costs required for the successful completion of the services detailed in PWS paragraph 5.5.

The solution shall be implemented in no more than two weeks after exercise of the optional task. The Period of performance shall not exceed Option Period Four end date.

The Contractor shall only invoice for completed enhancements.

4
EA
$
$
4006
Additional EMSS Enhancements – Medium LOE IAW PWS paragraph 5.5

This FFP CLIN includes all labor, material, and other costs required for the successful completion of the services detailed in PWS paragraph 5.5.

The solution shall be implemented in no more than four weeks after exercise of the optional task. The Period of performance shall not exceed Option Period Four end date.

The Contractor shall only invoice for completed enhancements.

4
EA
$
$
4007
Additional EMSS Enhancements – High LOE IAW PWS paragraph 5.5

This FFP CLIN includes all labor, material, and other costs required for the successful completion of the services detailed in PWS paragraph 5.5.

The solution shall be implemented in no more than eight weeks after exercise of the optional task. The Period of performance shall not exceed Option Period Four end date.

The Contractor shall only invoice for completed enhancements.

2
EA
$
$
OPTION PERIOD 4 OPTIONAL TASK 3 TOTAL
$
OPTION PERIOD 4 PLUS ALL OPTIONAL TASKS TOTAL
$

OPTIONAL TASK ONE

The following optional task may be exercised at any time during the base period or any of the option periods IAW FAR 52.217-7, Option for Increased Quantity – Separately Priced Line Item. Work shall not commence until, and unless, a formal modification is issued by the CO.

5001
Phase Out Transition Support IAW PWS paragraph 5.3

This FFP CLIN includes all labor, material, and other costs required for the successful completion of the services detailed in PWS paragraph 5.3 and all its subparagraphs.

The PoP shall be 30 days after exercise of the optional task.

1
LT
$
$
5001AA
Phase Out Transition Plan IAW PWS paragraph 5.3

Due sixty days (60) days prior to contract the end of the contract unless otherwise approved by the COR.

1
LT
NSP
NSP
OPTIONAL TASK 1 TOTAL
$
BASE PLUS ALL OPTIONS TOTAL
$

POINTS OF CONTACT

VA Program Manager:

Name:Ray Dockery, Director, IT Systems Integration (OSDBU)
Address:810 Vermont Ave, Washington, DC, 20001
Voice:202-632-9109
Email:ray.dockery@va.gov

Contracting Officer’s Representative:

Name:James Henderson
Address:810 Vermont Ave, Washington D.C. 20001
Voice:202-817-4650
Email:james.henderson15@va.gov

Contracting Officer:

Name:Debra Clayton
Address:23 Christopher Way, Eatontown, NJ 07724
Voice:732-795-1015
Email:debra.clayton2@va.gov
36C10B19Q0282Section B

Page 1 of Page 1 of Page 1 of Page 1 of

B.5 PERFORMANCE WORK STATEMENT

PERFORMANCE WORK STATEMENT (PWS)

DEPARTMENT OF VETERANS AFFAIRS

Office of Small and Disadvantaged Business Utilization (OSDBU)

VA Event Management System Software as a Service (EMSS)

March 18, 2019

TAC-19-54354

PWS Version Number: 3.0

1.0 BACKGROUND

The Department of Veterans Affairs (VA), Office of Small and Disadvantaged Business Utilization (OSDBU) provides services to Veteran Owned Small Businesses (VOSB) and Service-Disabled Veteran Owned Small Businesses (SDVOSB) who seek to gain access to economic opportunity by leveraging the Federal procurement system.

To meet the requirements of Public Law 109-461, VA verifies the eligibility of firms registered in the Vendor Information Pages (VIP) database to ensure they are owned and controlled by Veterans or Service-Disabled Veterans. The VIP database was established to assist VA acquisition personnel in verifying the eligibility of firms seeking to participate in the VA procurement process.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.