31600157 data.pdf

PDF 498 KB Posted

Attached to
SHACKLES Federal contract opportunity
Solicitation number
SPMYM223Q1685
Issued by
Defense Logistics Agency Land and Maritime

About this file

This technical ordering data sheet outlines requirements for the procurement of alloy or carbon steel shackles under solicitation SPMYM223Q1685 by the Defense Logistics Agency Land and Maritime. The shackles must meet specifications for material composition, surface treatment, minimum factor of safety, and marking as defined in Federal Specification RR-C-271. Manufacturers must provide certificates of compliance and data reports authorizing defect removal and periodic load testing. Individual shackles require certificates documenting proof static load testing at 200-205% of rated capacity, visual inspection for defects, and 100% magnetic particle inspection per Naval technical publication requirements. The contractor shall also provide standard warranties at no additional cost to the government. Changes to specifications require approval from the identified shipyard code through the administrative contracting officer.

View the file

Other files for this federal contract opportunity

Other files attached to SHACKLES, newest first.
File Type Posted
11 31590160 CDRLs (6).pdf PDF
1 31590155 CDRLs (7).pdf PDF
21 31600156 CDRLs (7).pdf PDF
9 31590159 CDRLs (7).pdf PDF
7 31590158 CDRLs (7).pdf PDF
5 31590157 CDRLs (7).pdf PDF
3 31590156 CDRLs (7).pdf PDF
23 31600157 CDRLs (7).pdf PDF
17 31590163 CDRLs (7).pdf PDF
15 31590162 CDRLs (2).pdf PDF
19 31600155 CDRLs (7).pdf PDF
13 31590161 CDRLs (6).pdf PDF
31590155 SOLE SOURCE _Redacted.pdf PDF
31600155 data.pdf PDF
23Q1685 SHACKLES.pdf PDF
31590163 data.pdf PDF
31590155 data.pdf PDF
31600156 data.pdf PDF
31590156 data.pdf PDF
31590157 data.pdf PDF
Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LHPSS-2370-019

Rev B

Technical Ordering Data

Shackles

Contract Number:______________________________

1. A Signed Certificate of Compliance is required which validates and states the Shackles meet items 1.1 thru 1.4: (See Contract Data Requirements List (DI-MISC-81356) Certificate of Compliance)

1.1. Material – Shackles are forged of alloy or carbon steel and meet the technical requirements of the current revision of Federal Specification RR-C-271 (Grade A or B), paragraph 3.1.1, Table 1 for material composition.

1.2. Surface Treatment – Shackles have NO surface treatments such as paint, galvanization, or other coatings.

No RFID device or equivalent installed.

1.3. Minimum Factor of Safety – Shackles have a minimum breaking strength that is 5 times the manufacturer’s rated safe working load.

1.4. Marking - The manufacturer identification and safe working load is clearly marked on each shackle.

2. A Data Report is required which provides the information in items 2.1 and 2.2 below:

2.1. Defect Removal - The manufacturer shall provide authorization for defect removal by grinding, provided that such reduction anywhere on the shackle or pin does not reduce the cross-sectional diameter of the bow to less than 90% or the cross-sectional diameter of the pin diameter to less than 95% of the corresponding dimensions (D or P) shown in Federal Specification RR-C-271. Grinding shall longitudinally follow the contour of the shackle or pin and be contoured with a 3:1 taper. (See Contract Data Requirements List (DI- MISC-80678) Defect Removal Authorization)

2.2. Periodic Load Testing –The manufacturer shall either 1) provide authorization to periodic load test between 150% and 155% of the manufacturer's rated capacity/working load limit or 2) provide recommended maximum periodic test load. (See Contract Data Requirements List (DI-MISC-80678) Period Load Test)

3. Signed Certificates of Test and Inspections for each Shackle (identified by unique serial number) to document the following:

3.1. Proof Static Load Test (See Contract Data Requirements List (DI-NDTI-80809) Static Load Test) - The shackle shall be proof tested for a minimum of ten minutes at 200% to 205% of the manufacturer’s safe working load based on certified weights or as indicated on a load indicating device. The manufacturer must provide a Certificate which identifies each shackle by a serial number and verifies a proof load test was completed as directed for each shackle.

3.2. Visual Inspection (See Contract Data Requirements List (DI-NDTI-80809) Visual Inspection) – Following the proof load test, the manufacturer shall visually inspect the shackle for damage such as nicks, gouges, cracks or other defects that could reduce the load bearing capacity.

3.3. Magnetic Particle (MT) Inspected - (See Contract Data Requirements List (DI-NDTI-80809) Magnetic Particle Test) After proof testing, the accessible areas of the shackle shall be 100% MT Inspected per

NAVSEA Technical Publication T9074-AS-GIB-010/271, (TP-271), requirements for Non-Destructive

Testing Methods. Acceptance criteria shall be per MIL-STD-2035A. MT inspections performed in accordance with ASTM A275, Standard Test Method for Magnetic Particle Examination of Steel

Forgings, are acceptable provided the TP-271 requirements are met for:

LHPSS-2370-019

Rev B

Technical Ordering Data

Shackles

Contract Number:______________________________

a) Arc Strikes – Arc strikes shall be ground out, faired into surrounding material, and re-inspected using the prod or yoke method or visually inspected at not less than 5X magnification. Excavations and remaining wall thickness shall be inspected for and shall meet the requirements of the governing specification.

b) Tolerance on Equipment Ammeters – To check the equipment ammeter, a suitable calibrated ammeter shall be connected in series with suitable shunts and the current through the electrodes measured. The amperage measured by the calibrated ammeter during the test shall simultaneously be compared to that indicated on the meter of the magnetic particle equipment. The equipment meter shall agree (within 5% of full scale) with the current measured by the calibration meter.

c) Automated Equipment – Automatic powder blowers or any other form of forced air, other than from a hand-held bulb, shall not be used for the application or removal of dry magnetic particles.

d) Surface Preparation – Prior to inspection, surfaces shall be dry and free from any contamination which might interfere with the proper formation or interpretation of the magnetic particle patterns.

With the exception of undercuts which are within specification allowances, the contour of welds shall blend smoothly and gradually into the base metal. Surface irregularities shall be removed to the extent that they will not interfere with interpretation of the test results. The final magnetic particle inspection shall be performed in the final surface and heat-treated conditions for the component.

4. The Contractor shall extend to the Government the full coverage of any standard warranty normally offered in a similar sale, provided such warranty is available at no additional cost to the Government. (See Contract Data Requirements List (DI-SESS-81639) Warranty Documentation)

5. Failure to provide the Contract Data Requirements Lists (CDRLs) above shall be cause for rejection of this material.

6. Changes to specifications or technical requirements are NOT ALLOWED without Shipyard (Code 2370.21) approval via the Administrative Contracting Officer (ACO).

File details come from the government source that posted it. Updated .