This document is an Amendment of Solicitation/Modification of Contract for a supersack transport and disposal contract issued by USCG Base Kodiak. The solicitation (Solicitation Number 31140PR250000183) seeks a vendor to remove and dispose of approximately 40 supersacks of contaminated materials resulting from a 3% AFFF (Aqueous Film Forming Foam) spill at a USCG firehouse. The materials are assumed to be PFAS/PFOA contaminated, with 1633 sample results pending. Vendors are required to provide a firm-fixed price quote to complete the entire Statement of Work, which includes providing all necessary supervision, labor, equipment, materials, and transportation for removal and disposal.
Key details include a quote submission deadline of 1:00 p.m. Alaska time on 9/4/25, with no possibility of due date extension. The average supersack weight is approximately 1.3 tons, and the vendor is responsible for providing a sea container for shipping the supersacks off-island. The solicitation is an open market procurement, not subject to GSA. The supersacks are currently stored on the backside of the firehouse, with no additional personal protective equipment (PPE) requirements beyond standard hazardous waste handling protocols. The government will provide an industrial scale on-site if needed, and no barricades are required as the work area has no pedestrian traffic.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| WD 2015-5687 REV 26.pdf | ||
| Fire Department AFFF May Spill SOW.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Question or Comment Number Question/Comment USCG Response
1 Will the USCG provide relevant photos? Photographs attached.
2 Does the material exceed the container max weight allowance?
The average supersack weight is ~1.3 tonIt is the vendor's responsibility to comply with weight limits for shipment containers. Vendor should quote the number of containers required to remove all supersacks.
3 Will the USCG be providing the sea container?
Vendor is responsible for shipping the supersacks off-island, including providing a sea container.
4 Is this procurement subject to GSA?
This is an open market solicitation. If a vendor has a GSA contract number they would like to quote from, please provide that contract number with your quote.
5 Is there an available analytical report for the waste?
1633 samples results are pending, the material is the result of a 3% AFFF spill from a firetruck, they are assumed to be PFAS/PFOA contaminated.
SOW Page 1 First paragraph, “Contractor will provide all supervision, labor, equipment, materials, and transportation for the removal and disposal of the contents of approximately 40 supersacks of contaminated materials.“ Is the waste in supersacks already or do we need to fill the supersacks with the AFFF gravel? If already in super sacks are the super sacks on pallets? The material is already in supersacks, the supersacks are not on pallets
Section 1.1. "At the Government's option, the use of USG scales will be allowed.” Is this scale at the work site? An industrial scale can be provided on site by the government
Section 5. "Transport tote tanks to location TBD and transport and dispose of the materials IAW all local, state, and federal laws and regulations.” How many tote tank need to be transported, what is in them and is there disposal part of the RFP? When is the location TBD? It is supersacks, not liquid or tote tanks
Solicitation 31140PR250000183 Questions and Responses
Page 3, first paragraph “The work area must be free of hazards, materials, and equipment during non-working hours. The contractor will erect barricades closing the work area off to traffic as required and shall erect barricades closing the work area off to pedestrian traffic during work performance. Barricades shall be removed before the end of each work period unless the work requires barriers to remain overnight for safety.” Is there a map of the work area that we can used to estimate the liner feet of barricades needed, how many roads and pedestrian traffic areas are anticipated to be closed for this project? Is the contractor required to provide a traffic plan? Does the contractor need to install temporary fencing or is caution tape sufficient?
Specification language, The super sacks are stored on the backside of the Firehouse, coordination with the firehouse will be required but the work is off the roads and the area has no pedestrian traffic. No barricades needed.
Page 3, second paragraph “The Contractor shall provide all Materials Handling Equipment (MHE) and Personal Protective Equipment (PPE),unless otherwise stated. The MHE and PPE must be appropriate to safely handle hazardous waste, to include meeting any additional military installation specific requirements.” Please provide detail on what the additional military installation specific requirements are? No additional PPE requirements
Page 3, Permits/Notifications “Contractor shall notify the COR in the event of an outage of any facility.” Assume the notification to the COR would be if the contractor caused the outage? Or will the COR notify the contractor in the event of an outage and work cannot commence?
Specification language, no outage, the government will notify contractor if work cannot commence; however, outage or work interruption highly unlikely.
Attachment A, Management # 4. "Containers will be inspected weekly for leaks, corrosion, rust, and open lids/bungs.” How long do you estimate the project to take if weekly inspections are needed? Can the Government provide an estimated number of weekly inspections to assume or is another contractor performing inspections until waste is removed? Suspect weekly inspection are not required, one mobilization event.
13 Who is the current vendor / incumbent? This is a new requirement. No incumbent information is available.
14 Can we have the current contract copy? This is a new requirement. No contract is available.
15 What is the Annual spent / last 3 invoices ?
This annual spend is not available for release. This is a new requirement; no invoices are available.
16 Are liquidated damages applicable? If yes, please specify. No additional PPE requirements 17 Is there any possibility of due date extension? No. Quotes are due at 1:00 p.m. Alaska time on 9/4/25.
18 Who will be responsible for rinsing the foam?
This is supersack transport and disposal contract, the supersacks are the result of a spill at the USCG firehouse. Please review the Statement of Work and Attachment A for the effort required.
Please provide us with the price sheet if there is any, or confirm if we can provide our own quote ?
No price sheet is available. Please provide a firm-fixed price quote to complete the entirety of the Statement of Work
Will USCG personnel be opening valve for bladder to remove AFFF from ARFF vehicle?
This is supersack transport and disposal contract, the supersacks are the result of a spill at the USCG firehouse. Please review the Statement of Work and Attachment A for the effort required.
Is there a minimum number of rinses requested? If so, what is the volume per rinse?
This is supersack transport and disposal contract, the supersacks are the result of a spill at the USCG firehouse. Please review the Statement of Work and Attachment A for the effort required.
22 Approximately how many trucks are required to be cleaned/ rinsed?
This is supersack transport and disposal contract, the supersacks are the result of a spill at the USCG firehouse. Please review the Statement of Work and Attachment A for the effort required.
23 Are you looking for a cleaning solution or just water?
This is supersack transport and disposal contract, the supersacks are the result of a spill at the USCG firehouse. Please review the Statement of Work and Attachment A for the effort required.
24 What are size of the bladders on each truck?
This is supersack transport and disposal contract, the supersacks are the result of a spill at the USCG firehouse. Please review the Statement of Work and Attachment A for the effort required.
What is the procedure for the verification that there is not “any residual foam” left on the vehicle? In other words how clean is clean?
This is supersack transport and disposal contract, the supersacks are the result of a spill at the USCG firehouse. Please review the Statement of Work and Attachment A for the effort required.
Do we need to dispose of the containers that are vacuumed or emptied?
This is supersack transport and disposal contract, the supersacks are the result of a spill at the USCG firehouse. Please review the Statement of Work and Attachment A for the effort required.
What is the budgetary number for the waste removal and disposal service in 2024 and 2025? This information will not be released.
Please confirm if the firm fixed price will be applicable only for the base year?, are price escalations allowed for optional years?
This is a single requirement. Vendors are to provide a firm-fixed price to cover the entire effort outlined in the Statement of Work