3.01_N00383-25-Q-013A_N0038325PR0R283.pdf
PDF 768 KB Posted
- Attached to
- FMS REPAIR FOR THE COUNTRY OF KU Federal contract opportunity
- Solicitation number
- N0038325Q013A
About this file
This is a Request for Quotation (RFQ) issued by NAVSUP Weapon Systems Support Philadelphia for repair services of a processor signal data unit (NSN: 7R 1270-01-591-9098, P/N: 7959650-200) for Foreign Military Sales to Kuwait. The solicitation requires evaluation and repair services with inspection, component repair/replacement, reassembly and testing to return units to serviceable condition.
Key details include: Solicitation number N00383-25-Q-013A with quotes due by March 11, 2025; DO-A1 priority rating; not a small business set-aside; FOB Origin terms; 365-day induction period from contract award; repair turnaround time (RTAT) to be proposed by contractor; throughput constraints to be specified by contractor for monthly repair quantity. The contractor must comply with ISO 9001/SAE AS9100 quality requirements and maintain calibration system meeting ANSI/NCSL Z540.3 standards. Past performance and price will be evaluated, with past performance being more important than price. The contract includes requirements for Commercial Asset Visibility (CAV) reporting and specialized packaging/marking requirements for FMS shipments.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR QUOTATION
(THIS IS NOT AN ORDER)
THIS RFQ IS IS NOT A SMALL BUSINESS SET-ASIDE
PAGE OF PAGES
1 67
1. REQUEST NUMBER 2. DATE ISSUED 3. REQUISITION/PURCHASE REQUEST NO. 4.CERT.FOR NAT.DEF.
UNDER BDSA REG.2
AND/OR DMS REG. 1
RATING
N00383-25-Q-013A 2/11/2025 N0038325PR0R283 DO-A1
5a. ISSUED BY
6. DELIVER BY (Date)
NAVSUP WEAPON SYSTEMS SUPPORT
PHILADELPHIA
700 ROBBINS AVENUE
PHILADELPHIA, PA 19111 – 5098
5b. FOR INFORMATION CALL (NO COLLECT CALLS) 7. DELIVERY FOB DESTINATION OTHER (See Schedule) NAME TELEPHONE NUMBER
JOHN MAIER CODE: N723.10 AREA CODE NUMBER 9. DESTINATION
215 697-2000 a. NAME OF CONSIGNEE
8. TO:
a. NAME b. COMPANY b. STREET ADDRESS
c. STREET ADDRESS c. CITY
d. CITY e. STATE f. ZIP CODE d. STATE e. ZIP CODE
10. PLEASE FURNISH QUOTATIONS TO THE
ISSUING OFFICE IN BLOCK 5a ON OR BEFORE CLOSE OF BUSINESS (Date)
3/11/2025
IMPORTANT: This is a request for information, and quotations furnished are not officers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or service. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotation must be completed by the quoter.
11. SCHEDULE (Include applicable Federal, State, and local taxes)
ITEM NO.
(a)
SUPPLIES/SERVICES
(b)
QUANTITY
(c)
UNIT
(d)
UNIT PRICE
(e)
AMOUNT
(f)
12. DISCOUNT FOR PROMPT PAYMENT
a.10 CALENDAR DAYS (%) b.20 CALENDAR DAYS (%) c.30 CALENDAR DAYS (%) d. CALENDAR DAY
NUMBER PERCENTAGE
NOTE: Additional provisions and representations are are not attached.
13. NAME AND ADDRESS OF QUOTER 14.SIGNATURE OF PERSON AUTHORIZED TO
SIGN QUOTATION
15.DATE OF QUOTATION
a. NAME OF QUOTER
b. STREET ADDRESS 16.SIGNER
a. NAME (Type or print) b. TELPHONE
c. COUNTY AREA CODE
d. CITY e. STATE f. ZIP CODE c. TITLE (Type or print) NUMBER
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 18 (REV. 6/1995)
Previous edition not usable Prescribed by GSA-FAR (48 CFR) 53.215-1(a)
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED
PAGES
NAME OF OFFEROR OR CONTRACTOR
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001AA
IN ACCORDANCE WITH SECTION B, PERFORM
EVALUATION AND REPAIR SERVICES AS
REQUIRED
NSN: 7R 1270-01-591-9098
PART NUMBER: 7959650-200
NOMENCLATURE: PROCESSOR, SIGNAL DATA
M/F: PKUAE41276186R
SERIAL NUMBER: RLP367
RTAT=0000 (TBD)
Throughput Constraint=0000/month (TBD) Induction Expiration Date=000 (NTE 365 days) (TBD)
MAPAC CODES
SHIP TO: DKU005
MARK FOR: DKUA00
SUPADD: DA5GHY
FMS CASE: KU-P-GHY
PLATFORM: F-18
NSN 1680-01-561-2490 OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48 CFR) 53.110
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED
PAGES
NAME OF OFFEROR OR CONTRACTOR
SOLICITATION NOTES:
NO FAST PAY.
DO NOT INDUCT TO CAV.
Articles that have been serviced shall be shipped via a Collect Commercial Bill of Lading to the Freight Forwarder listed on the item page.
No transportation charges should be incurred against this order. Based on the criticality of the item, NAVSUP Weapon Systems Support may authorize alternate or priority air shipment for completed repairs. This authorization must be made in writing. No verbal instructions will be honored.
Please note: We are only providing you with the MAPAC SHIP TO and MARK FOR codes and not the full addresses. Prior to the shipment of the material, please consult the MAPAC website to obtain the complete SHIP TO and MARK FOR addresses. Please click on the MAPAC link on the left hand side of the page and enter the appropriate SHIP TO or MARK FOR code shown above.
https://www.transactionservices.dla.mil/daasinq/captcha_form.asp
Contract Specialist: John Maier Email: john.a.maier11.civ@us.navy.mil Phone: 215-697-2000
Repair Manager: Eric Pleier Email: eric.d.pleier.civ@us.navy.mil
This solicitation is for the repair of the items identified herein.
Repair Turnaround Time (RTAT) definition: The contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor's facility.
The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in the subsequent contract.
Required RTAT: ____ days after receipt of asset.
Throughput Constraint: Contractor must provide a throughput Constraint for each NSN(s). Total assets to be repaired monthly after initial delivery commences X/month (contractor fill in #). A throughput of 0000/month reflects no throughput constraint.
Induction Expiration Date: 365 days after contract award date. Any asset received after this date in days is not authorized for repair without bi-lateral agreement between the Contractor and NAVSUP WSS Contracting Officer.
Reconciliation: A reconciliation modification will be issued after final Inspection and acceptance of all assets inducted under the subsequent contract. The parties have agreed to a price (shown on the schedule page of the contract) for each unit at the negotiated RTAT. Such prices are based on the Contractor meeting the RTAT requirements described within the schedule page. If the Contractor does not meet the applicable RTAT requirement, consideration will be assessed and subject to negotiation.
All contractual documents (i.e. contracts, purchase orders, task orders, delivery orders and modifications) related to the instant procurement are considered to be "issued" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods, such as email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein.
https://www.transactionservices.dla.mil/daasinq/captcha_form.asp mailto:kevin.vong@navy.mil mailto:eric.d.pleier.civ@us.navy.mil
SECTION D - PRESERVATION, PACKAGING, PACKING AND MARKING
REQUIREMENTS
Preservation, packaging, packing and marking instructions shall be in accordance with sections indicated with an “X” in the numbered blocks.
DOCUMENT REF. NO. PAGE
CLAUSE
D400
SEC.
NO.
REQUISITION, CONTRACT OR ORDER NUMBER
1270-01-591-9098
PRESERVATION, PACKAGING, PACKING AND MARKING REQUIREMENTS
General – All specifications applicable to these requirements shall be of the issue in effect on the date of the invitation for bid or original negotiation. Packaging terms, levels of protection, etc. used in this exhibit are defined in MIL-STD-2073-1.
Preservation and packaging shall be accomplished in accordance with the requirements of MIL-P-116. The specific packaging procedures, and Level of Protection for each item are delineated in the coded format of MIL-STD-2073-2 and cited below, along with additional data elements as defined in MIL-STD-2073-1.
ITEM NUMBER(S)
PRESER-
VATION
METHOD
CL
EA
N/
DR
Y
PRESERV-
ATIVE
MATL
WRAP-
PING
MATL
CUSHION/
DUNNAGE
MATL CU
BI
C
TH
IC
K-
NE
SS
UNIT
CON-
TAINER
LE
VE
L O
F
PR
O
T INTERIM
CON-
TAINER UN
IT
CN
TR
LV
L SP
EC
M
KG
PACKING CODE 1270-01-591-9098
G X 1 0 0 K 3 L T B E D A 0 0 B 39 Q F F
HAZMAT QTY PER
UNIT PACK
INT CTNR
QTY
UNIT PACK
WT UNIT PACK CU SPI NUMBER REV SPI DATE CONTAINER NIIN GFM CFM
N 001 000
CONTAINER MANAGER
CODE PHONE (215) 697- SUPPLEMENTAL INSTRUCTIONS
ITEM NUMBER(S) PRESER-
VATION
METHOD
CL
PRESERV-
ATIVE
MATL
WRAP-
PING
MATL
CUSHION/
DUNNAGE
MATL CU
BI
C
TH
IC
K-
TAINER
LE
VE
L O
F
PR
O
T INTERIM
CON-
PACKING CODE
HAZMAT QTY PER
UNIT PACK
INT CTNR
QTY
WT UNIT PACK CU SPI NUMBER REV SPI DATE CONTAINER NIIN GFM CFM
ITEM NUMBER(S)
PRESER-
VATION
METHOD
CL
PRESERV-
ATIVE
MATL
WRAP-
PING
MATL
CUSHION/
DUNNAGE
MATL CU
BI
C
TH
IC
K-
TAINER
LE
VE
L O
F
PR
O
T INTERIM
CON-
INT CTNR
QTY
ITEM NUMBER(S) PRESER-
VATION
METHOD
CL
PRESERV-
ATIVE
MATL
WRAP-
PING
MATL
CUSHION/
DUNNAGE
MATL CU
BI
C
TH
IC
K-
TAINER
LE
VE
L O
F
PR
O
T INTERIM
CON-
INT CTNR
QTY
Markings of all containers for Item(s) shall include “Type l Shelf Life Item”, date of cure, and an “Expiration Date” of years after date of cure shelf life marking shall consist of the quarter of the year (i.e. Jan thru march 192 =1Q92) in accordance with MIL-STD-129.
Markings of all containers for Item(s) shall include ”Type l Shelf Life Item” date of manufacture/assembly, and an inspection/test date of years after date of manufacture/assembly.
Shelf life marketing shall consist of the quarter of the year and the year (i.e. Jan thru March 1992 = 1Q92) in accordance with MIL-STD-129.
Refer to Section 5.D for additional requirements.
NAVICP-4030/1 (Rev. 3-02)
PART I - THE SCHEDULE
SECTION B
SUPPLIES OR SERVICES AND PRICES/COSTS
WSSTERMBA00
CONTACT INFORMATION
When a DCMA office is shown on a Contract/Purchase Order, the Administrative Contracting Officer (ACO) is the primary point of contact and all inquiries shall initially be directed to that office for necessary action. PLEASE REFER TO THE FRONT PAGE, BOX 7.
Inquiries and correspondence directed to the Post Award PCO Contract Specialist should be addressed as follows:
Code: N723.10 Weapon System LRC: B5K
Telephone: 215-697-2974 E-Mail: john.a.maier11.civ@us.navy.mil
In the event that the listed PCO contact information is no longer valid and a follow-on PCO cannot be identified, contact (itimp.wss.fct@navy.mil).
WSSTERMBZ01
IMPORTANT NOTICE REGARDING INVENTORY TRANSACTION REPORTING
Inventory transaction reporting requirements have changed for NAVSUP Weapon System Support (NAVSUPWSS) contracts. These requirements are detailed in Section F, and the contractor should read this section carefully to ensure compliance. Additional information regarding reporting via Commercial Asset Visibility (CAV) is available at https://www.navsup.navy.mil/NAVSUP-Enterprise/NAVSUP- Weapon-Systems-Support Provisions-Instructions-and-Contract/
The CAV web tool can be found at https://applications.navsup.navy.mil/cavweb/
Questions can be addressed to NAVSUPWSSCAVSOW@navy.mil for NAVSUP WSS Philadelphia solicitations and contracts (document numbers beginning with N00383) and to NAVSUPWSSM.CAVSOW@navy.mil for NAVSUP WSS Mechanicsburg solicitations and contracts (document numbers beginning with N00104).
(06-16)
WSSTERMBZ04
IMPORTANT NOTICE REGARDING HAZARDOUS MATERIAL
FAR clause 52.223-3, Hazardous Material Identification and Material Safety Data, is incorporated by reference in Section I in this solicitation and requires offerors to—
(1) identify and hazardous material (defined in FED STD 313 as an item or chemical which is a "health or physical hazard" per OSHA in 29 CFR 1910.1200) that will be delivered under a resultant contract, and
(2) provide a Material Safety Data Sheet meeting OSHA/FED STD 313 requirements for all hazardous material identified.
While not an all-inclusive listing of hazardous material, at a minimum, any item with a four-digit Federal Supply Code (FSC), which correlates to the first four positions of the National Stock Number (NSN), of 6810, 6820, 6830, 6840, 6850,7930, 8010, 8030, 8040, 9110, 9135, 9140, 9150, or 9160 is considered hazardous material and requires submission of a Material Safety Data Sheet or an appropriate representation that there is no hazardous material contained in the item.
Failure to provide the required information and documentation may render you ineligible for award. If you have questions about whether a solicited item is classified as hazardous, contact the NAVSUP WSS HAZMAT point of contact, NAVSUPWSS Code 0772, at (717) 605-1361.
(10-06) https://www.navsup.navy.mil/NAVSUP-Enterprise/NAVSUP-Weapon-Systems-Support https://www.navsup.navy.mil/NAVSUP-Enterprise/NAVSUP-Weapon-Systems-Support https://applications.navsup.navy.mil/cavweb/
SECTION C
DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
1. SCOPE
1.1 Markings shall be in accordance with MIL-STD-130.
1.2 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with <SOURCE> drawing number (<CAGE CODE>) <PART NUMBER>, Revision <LATEST> and all details and specifications referenced therein.
1.3 Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification.
1.4 If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD- 001C.
2. APPLICABLE DOCUMENTS - NOT APPLICABLE
3. REQUIREMENTS
3.1 1.0 GENERAL
3.1.1 This Statement of Work (SOW) establishes the criteria for repair and testing /inspection of the subject item. It includes inspection, component repair and replacement, reassembly and testing procedures required to return units back into a serviceable condition.
3.2 2.0 DEFINITIONS.
3.2.1 CONTRACTOR: Is defined as the successful offeror awarded a contract, order or issued a project work order. The term "contract" encompasses a contract, an order, or a project work order.
3.2.2 OVERHAUL: An overhauled part is one which has been disassembled, cleaned, inspected, repaired as necessary (by replacing or repairing all components which have been found to exceed limits established by the repair/overhaul manual) reassembled and tested in accordance with the approved repair/overhaul manual listed in this SOW and returned to a Ready for Issue (RFI) condition (Refer to contract schedule for items to be overhauled).
3.2.3 REPAIR: A repaired part is one which has been restored to a Ready for Issue (RFI) condition (by replacing or repairing those components found to be defective, broken, damaged or inoperative during the initial evaluation and troubleshooting phase) and tested in accordance with the approved repair/overhaul manual listed in this SOW (Refer to contract schedule for items to be repaired).
3.3 3.0 SCOPE
3.3.1 GENERAL. The items to be furnished hereunder shall be overhauled, upgraded, repaired, tested, inspected, and accepted in accordance with the terms and conditions specified in this contract. Unless expressly provided Government Furnished Property, including equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, special test equipment, or any other manufacturing aid required for the repair, manufacture, and/or testing of the subject item(s) will not be provided by the Government and shall be the responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing, manual, or specification for the contract items.
3.3.2 REPAIR UPGRADE REQUIREMENTS: The contractor shall provide the necessary facility, labor, materials, parts, and test and tooling equipment required to return the following items to a Ready For Issue (RFI) condition:
ITEM(S) ON PAGE 2 <Available repair manuals, drawings and specifications per p/n requirements> Tech Publications.
3.3.3 RFI is defined as that condition allowing the items to perform properly and reliably in an operational environment in a manner they were intended to operate. The contractor must perform all repairs/upgrades at the facility identified within this SOW. Repairs performed by the contractor or subcontractor shall be performed in accordance with the specified drawings and repair manual(s).
3.4 Changes to such manuals used for repairs under this contract, or changes to drawings or specifications used in the manufacture of parts utilized in these repairs, require Procuring Contracting Officer (PCO) approval in accordance with the Configuration Management provisions of this Statement of Work or contract. Under no circumstances should the repair, test, and inspection extend beyond the requirements of this paragraph unless authorized by the Government Arkin addition, requests for approval of changes to a repair source or repair facility shall be submitted in writing to the PCO prior to making any such change.
3.4.1 Any repairs performed using unapproved changes to such manuals, drawings, specifications, or changes to repair source or facility are done at the contractor's own risk. If the Government disapproves the requested change, the contractor shall replace any delivered items repaired using such unapproved manuals, drawing, specification, repair source or repair facility change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a requested change to manuals, drawings, specifications, or to a repair source or facility.
3.4.2 References on Drawings and Specifications: For repair and overhaul purposes only. All references to the "prime contractor" or the "actual manufacturer" appearing on the drawings and / or specifications or technical data furnished by the Government shall be read as the "Government Designated Agency"
3.4.3 Process Control Documentation: The contractor shall prepare and maintain repair procedures, and test / inspection information / procedures which shall be made available to the Government for review and approval. The procedures shall include sequential diagrams of processes, as well as the performance specifications to perform the testing / inspection procedures. Those processes shall be frozen after approval of the inspection / Test.
3.4.4 Beyond Economical Repair (BER). An item is BER if the cost of the repair exceeds 75% of the production quantity price to replace the item, current at time of award. This replacement price is for the purposes of BER determinations only, and may not be used or relied on by the offeror in the pricing of the repairs required by this contract. Items determined BER are not included in the contract price. The contractor shall obtain written concurrence from DCMA for all units determined by the contractor to be BER. All such determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence shall be provided by the contractor to the PCO, with a copy to the inventory manager. After receipt of the required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item. The contractor is not authorized to proceed with the repair until notification to proceed is received from the PCO. Any disposal ordered shall be performed by the contractor in accordance with all applicable regulations and in accordance with all DCMA disposal procedures and requirements.
3.4.5 Missing on Induction (MOI). A Weapons Repairable Assembly (WRA) is subject to this MOI provision if the item received by the contractor for repair is missing one or more Shop Replaceable Assemblies (SRAs). Contractor replacement of MOI SRAs is not included in the contract price. The contractor shall immediately notify DCMA when an item is received with MOI SRA(s) and shall obtain written verification from DCMA for all WRAs determined to have MOI SRA(s). The contractor shall provide all such determinations, including identification of the missing SRA(s), and the DCMA written verification, to the Inventory Manager with a copy to the PCO and ACO prior to induction and/or repair of the WRA. The contractor shall not induct and/or repair WRAs with MOI SRAs until instructions on how to proceed are provided to the contractor by the Inventory Manager (where no adjustment price to the contract is required) or by the PCO. Items received by the contractor missing consumable parts are not MOI items. Rather, repair of such items and replacement of the missing consumable parts are included in the contract price and the item shall be inducted and repaired by the contractor under this contract.
3.4.6 Replacing Failed or Missing Shop Replaceable Assembly (SRA) when repairing a Weapons Replaceable Assembly (WRA).
3.4.7 A. When the contractor believes one or more SRA(s) within a WRA are either:
3.4.8 Beyond Economic Repair (BER) or Beyond Repair (BR) i. e. the unit is not capable of being repaired because of the extent of physical damage), or Missing on Induction (MOI), the contractor shall obtain written verification from DCMA and advice from the Inventory Manager whether a SRA may be replaced by one or more of the following options: Ship in place from an existing spares or repair contract, if any, MILSTRIP the SRA(s), otherwise be provided direction for obtaining the SRA(s) at no cost to the contractor. The detailed procedures are set forth in Section 6.0 of the WEB-BASED COMMERCIAL ASSET VISIBILITY (CAV) STATEMENT OF WORK.
3.4.9 B. When not otherwise provided for (or precluded) by other terms of this contract, the contractor may seek written authorization to replace failed SRA(s) with Ready For Issue SRA(s). When authorized, the procedures set forth in paragraph 3.0 of Section 6.2 of the WEB- BASED COMMERCIAL ASSET VISIBILITY (CAV) STATEMENT OF WORK shall be followed.
3.4.10 Over and Above Repair (OAR). An item sent to the contractor shall be considered to require over and above (OAR) repair effort if the repair required is not the type of repair that would be anticipated as a result of normal Navy operation of the item and is not included in the contract pricing due to the nature or scope of the repair needed for that particular item. Therefore, repair of OAR items may be subject to equitable adjustment. The Contractor shall obtain written concurrence from DCMA for all units determined by the contractor to require OAR effort. All such OAR determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence, shall be provided by the contractor to the PCO prior to undertaking repair of the item.
After receipt of the required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item. Any ordered disposal shall be performed by the contractor in accordance with all applicable regulations and DCMA disposal procedures and requirements.
3.5 4.0 PARTS AND MATERIALS
3.5.1 General. The contractor is responsible for supplying all parts and material necessary to perform the required repairs under this contract unless parts or material are specifically identified as Government Furnished Material (GFM). All parts and material used in performance of this contract shall be in accordance with the latest approved revision of applicable drawings and specifications and shall be new in accordance with FAR 52.211-5, Material Requirements, which is incorporated by reference herein Authorization to use other than new material as defined by FAR 52.211-5 requires written approval from the PCO. In addition, cannibalization must be approved by the PCO. Cannibalization of units that have not been inducted is not typically authorized and requires specific approval by the PCO.
3.5.2 The contractor shall ensure it has access for the duration of this contract to updated drawings and specifications for parts and material required for repairs performed under this contract. Any change to such parts/material drawings or specifications requires Government approval in accordance with the Configuration Management provisions of this Statement of Work. Written approval from the PCO must be obtained prior to any change to the manufacturing source or manufacturing facility for all parts which require source approval, unless the contractor is the Design Control Agent (DCA) (i.e. the entity responsible for maintaining the latest configuration data) for the contract item. If the contractor is the DCA, the contractor may approve changes to manufacturing source or manufacturing facility for all parts, including those which require source approval. Any repairs performed using unapproved changes to such drawings, specifications or manufacturing source or facility are done at the contractor's own risk. If the Government disapproves the requested change, the contractor shall replace any delivered items repaired using such unapproved change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a requested change to the drawings, specifications or manufacturing source or facility.
3.5.3 Purchased Material Control and Parts Control. The contractor shall establish and maintain a system of control over purchased parts and material. Such controls shall, at a minimum, assure that the parts and material purchased are in compliance with the requirements of this contract.
3.5.4 Receiving Inspection of Purchased Parts and Material. (1) Purchased items shall be inspected upon receipt at the contractor's facility to assure conformance with all requirements of the applicable drawings and specifications or (2) the contractor shall provide prior to the contract award evidence for Government review and approval of a purchased parts and material system which provides for the inspections to assure conformance with all requirements of the applicable drawings and specifications. Evidence of such inspections of such inspections shall be maintained by the contractor or subcontractor for Government review. The inspection report shall, at a minimum, include a record of all dimensional data (coordinate/positional), material, finish, and process with appropriate pass/fail criteria such as certifications and actual dimensional readings.
3.5.5 ***NOTE***PART CANNIBALIZATION IS NOT AUTHORIZED UNLESS SPECIFICALLY APPROVED BY NAVSUP WSS AND
THE BDE.
3.5.6
3.6 SOURCE AND LOCATION OF REPAIR SOURCE:
3.6.1 The contractor shall specify the name of the Source/Division performing the work and the actual location where work will be performed.
3.7 5.0 CONTRACTOR QUALITY REQUIREMENTS:
3.7.1 Quality Program. The Contractor shall establish, implement, document and maintain a quality system that ensures conformance to all applicable requirements of ISO 9001/ SAE AS9100. The Contractor's quality management system/program shall be designed to promptly detect, correct and prevent conditions that adversely affect quality.
3.7.2 Calibration System Requirements. Contractor shall maintain a calibration system that meets the requirements of ANSI/NCSL Z540.3, ISO-10012-1 or an equivalent calibration program acceptable to the Government.
3.8 6.0 CONFIGURATION MANAGEMENT (CM):
3.8.1 The contractor shall maintain a configuration management plan in accordance with the provisions of NAVSUP WSS configuration management clause NAVICPIA18. (Refer to contract).
3.9 7.0 MARKINGS.
3.9.1 Marking shall be as indicated in the contract when applicable.
3.10 8.0 STORAGE;
3.10.1 The contractor shall provide a proper enclosed warehouse environment for both material items awaiting repair and assets which have been repaired and are awaiting shipment to ensure the items are not damaged while being stored.
WSSTERMCZ01
CONFIGURATION MANAGEMENT AND CONTROLS
1.0 Configuration Management
NOTE: All references to the "Procurement Contracting Officer" or "PCO" in this Local Term are to the NAVSUP WSS PCO.
1.1 The Naval Air Systems Command (NAVAIR) shall maintain configuration control and change authority for all items in this contract.
Guidance pertaining to proper classification, definitions, preparation, and submission of engineering changes or product variances may be found in: NAVAIRINST 4200.56 (April 24, 2013), Critical Item Management; MIL-HDBK-61B (April 7, 2020), Configuration Management Guidance; SAE EIA-649C (February 2019), Configuration Management Standard; and SAE EIA-649-1A (August 2020), Configuration Management Requirements for Defense Contracts.
1.2 In accordance with the configuration management provisions of this contract, the Contractor shall maintain the total Equipment baseline configuration of the parts on this contract including, but not limited to, hardware, software and firmware.
NOTE: Additional information and guidance relative to engineering changes and variances may be obtained by contacting the systems cognizant NAVAIR Program Office.
2.0 Engineering Changes
2.1 The Government will not be responsible for any contract delay or disruption or any increased costs of performance of the Contractor due to a misclassification of an ECP by the Contractor, including those costs associated with replacement of delivered items resulting from such a misclassification.
2.2 Any Class I change initiated by the Government is subject to the Changes clause of this contract, FAR 52.243-1.
2.3 The Contractor shall coordinate with the cognizant NAVAIR PMA prior to any Class I ECP submission. The Contractor shall notify the Procurement Contracting Officer (PCO) of any Class I engineering change activity, or proposed change activity affecting items in this contract, including proposed or approved changes sponsored by any Government activity. NAVAIR shall approve all Class I changes. The Contractor must not implement a Class I change on this contract until a contract modification is issued by the PCO. ECPs shall be prepared in accordance with DI-SESS-80639E, Engineering Change Proposal (ECP).
2.4 Any Class II change8 involving a CSI shall be submitted to the PCO for NAVAIR Technical Authority approval unless NAVAIR has delegated approval authority to the cognizant Defense Contract Management Agency (DCMA) Contract Management Office (CMO). Class II changes related to non-CSIs shall be submitted to the cognizant DCMA CMO for concurrence in classification and may be implemented only upon receiving DCMA concurrence. Class II changes shall be made at no additional cost to the Government.
2.5 The Contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a Class I or Class II ECP.
3.0 Variances
3.1 The Contractor must not deliver any item for acceptance by the Government that incorporates a known departure from technical or contractual requirements unless a Request for Variance has been approved. Authorized variances are a temporary departure from the requirements only and do not authorize a change to the item's configuration baseline. Variance requests shall be prepared in accordance with DI-SESS-80640E - Request for Variance (RFV).
3.1.1 Major/Critical Variances: The Contractor shall submit all major/critical variance requests, via DCMA and the PCO, to NAVAIR for approval or disapproval. All approved major/critical variances require a contract modification by the PCO prior to final inspection and acceptance.
3.1.2 Minor Variances: Any minor RFV involving a CSI shall be submitted to the PCO for NAVAIR Technical Authority approval unless NAVAIR has delegated approval authority to the cognizant DCMA CMO. For minor RFVs related to non-CSI, delivery and/or shipment of such items under this contract is not permitted until authorized by the cognizant DCMA CMO.
3.2 The Contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a major/critical or minor variance.
(12/21)
WSSTERMCZ03
CONFIGURATION MANAGEMENT FOR SIMPLIFIED ACQUISITION
(a) The Contractor shall not make any configuration changes, engineering changes or part number changes to the contract/purchase order items, including, but not limited to, the item's hardware, software or firmware, unless approved by the Procurement Contracting Officer (PCO). In addition, approval by the appropriate technical authority may also be required. Guidance on how to submit a proposed engineering or part number change may be obtained from the PCO.
(b) The Contractor shall not manufacture any item for acceptance by the Government that incorporates a known departure from technical or contractual requirements unless a request for a deviation has been approved. Authorized deviations are a temporary departure from the requirements only and do not authorize a change to the item's configuration baseline. Any deviation, major or minor, must be approved by the PCO prior to acceptance. (12-04)
SECTION D
PACKAGING AND MARKING
PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE
SEE PACKAGING ON PAGE 3
252.211-7003
ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2022)
(a) Definitions. As used in this clause --
"Automatic identification device" means a device, such as a reader or interrogator, used to retrieve data encoded on machine-readable media.
"Concatenated unique item identifier" means –
(1) For items that are serialized within the enterprise identifier, the linking together of the unique identifier data elements in order of the issuing agency code, enterprise identifier, and unique serial number within the enterprise identifier; or
(2) For items that are serialized within the original part, lot, or batch number, the linking together of the unique identifier data elements in order of the issuing agency code; enterprise identifier; original part, lot, or batch number; and serial number within the original part, lot, or batch number.
"Data matrix" means a two-dimensional matrix symbology, which is made up of square or, in some cases, round modules arranged within a perimeter finder pattern and uses the Error Checking and Correction 200 (ECC200) specification found within International Standards Organization (ISO)/International Electrotechnical Commission (IEC) 16022.
"Data qualifier" means a specified character (or string of characters) that immediately precedes a data field that defines the general category or intended use of the data that follows.
"DoD recognized unique identification equivalent" means a unique identification method that is in commercial use and has been recognized by DoD. All DoD recognized unique identification equivalents are listed at https://www.acq.osd.mil/asda/dpc/ce/ds/unique-id.html https://www.acq.osd.mil/asda/dpc/ce/ds/unique-id.html
"DoD item unique identification" means a system of marking items delivered to DoD with unique item identifiers that have machine-readable data elements to distinguish an item from all other like and unlike items. For items that are serialized within the enterprise identifier, the unique item identifier shall include the data elements of the enterprise identifier and a unique serial number. For items that are serialized within the part, lot, or batch number within the enterprise identifier, the unique item identifier shall include the data elements of the enterprise identifier;
the original part, lot, or batch number; and the serial number.
"Enterprise" means the entity (e.g., a manufacturer or vendor) responsible for assigning unique item identifiers to items.
"Enterprise identifier" means a code that is uniquely assigned to an enterprise by an issuing agency.
"Government's unit acquisition cost" means –
(1) For fixed-price type line, subline, or exhibit line items, the unit price identified in the contract at the time of delivery;
(2) For cost-type or undefinitized line, subline, or exhibit line items, the Contractor's estimated fully burdened unit cost to the Government at the time of delivery; and
(3) For items produced under a time-and-materials contract, the Contractor's estimated fully burdened unit cost to the Government at the time of delivery.
"Issuing agency" means an organization responsible for assigning a globally unique identifier to an enterprise, as indicated in the Register of Issuing Agency Codes for ISO/IEC 15459, located at http://www.aimglobal.org/?Reg_Authority15459.
"Issuing agency code" means a code that designates the registration (or controlling) authority for the enterprise identifier.
"Item" means a single hardware article or a single unit formed by a grouping of subassemblies, components, or constituent parts.
"Lot or batch number" means an identifying number assigned by the enterprise to a designated group of items, usually referred to as either a lot or a batch, all of which were manufactured under identical conditions.
"Machine-readable" means an automatic identification technology media, such as bar codes, contact memory buttons, radio frequency identification, or optical memory cards.
"Original part number" means a combination of numbers or letters assigned by the enterprise at item creation to a class of items with the same form, fit, function, and interface.
"Parent item" means the item assembly, intermediate component, or subassembly that has an embedded item with a unique item identifier or DoD recognized unique identification equivalent.
"Serial number within the enterprise identifier" means a combination off numbers, letters, or symbols assigned by the enterprise to an item that provides for the differentiation of that item from any other like and unlike item and is never used again within the enterprise.
"Serial number within the part, lot, or batch number" means a combination of numbers or letters assigned by the enterprise to an item that provides for the differentiation of that item from any other like item within a part, lot, or batch number assignment.
"Serialization within the enterprise identifier" means each item produced is assigned a serial number that is unique among all the tangible items produced by the enterprise and is never used again. The enterprise is responsible for ensuring unique serialization within the enterprise identifier.
"Serialization within the part, lot, or batch number" means each item of a particular part, lot, or batch number is assigned a unique serial number within that part, lot, or batch number assignment. The enterprise is responsible for ensuring unique serialization within the part, lot, or batch number within the enterprise identifier.
"Type designation" means a combination of letters and numerals assigned by the Government to a major end item, assembly or subassembly, as appropriate, to provide a convenient means of differentiating between items having the same basic name and to indicate modifications and changes thereto.
"Unique item identifier" means a set of data elements marked on items that is globally unique and unambiguous. The term includes a concatenated unique item identifier or a DoD recognized unique identification equivalent.
http://www.aimglobal.org/?Reg_Authority15459
"Unique item identifier type" means a designator to indicate which method of uniquely identifying a part has been used. The current list of accepted unique item identifier types is maintained at https://www.acq.osd.mil/asda/dpc/ce/ds/ unique-id.html
(b) The Contractor shall deliver all items under a contract line, subline, or exhibit line item.
(c) Unique item identifier.
(1) The Contractor shall provide a unique item identifier for the following:
(i) Delivered items for which the Government's unit acquisition cost is $5,000 or more, except for the following line items:
Contract Line, Subline, or Exhibit Line Item Number Item Description
(ii) Items for which the Government's unit acquisition cost is less than $5,000 that are identified in the Schedule or the following table:
Contract Line, Subline, or Exhibit Line Item Number Item Description
(If items are identified in the Schedule, insert "See Schedule" in this table.)
(iii) Subassemblies, components, and parts embedded within delivered items, items with warranty requirements, DoD serially managed reparables and DoD serially managed nonreparables as specified in Attachment Number < >.
(iv) Any item of special tooling or special test equipment as defined in FAR 2.101 that have been designated for preservation and storage for a Major Defense Acquisition Program as specified in Attachment Number < >.
(v) Any item not included in paragraphs (c)(1)(i), (ii), (iii), or (iv) of this clause for which the contractor creates and marks a unique item identifier for traceability.
(2) The unique item identifier assignment and its component data element combination shall not be duplicated on any other item marked or registered in the DoD Item Unique Identification Registry by the contractor.
(3) The unique item identifier component data elements shall be marked on an item using two dimensional data matrix symbology that complies with ISO/IEC International Standard 16022, Information technology International symbology specification Data matrix; ECC200 data matrix specification.
(4) Data syntax and semantics of unique item identifiers. The Contractor shall ensure that --
(i) The data elements (except issuing agency code) of the unique item identifier are encoded within the data matrix symbol that is marked on the item using one of the following three types of data qualifiers, as determined by the Contractor:
(A) Application Identifiers (AIs) (Format Indicator 05 of ISO/IEC International Standard 15434), in accordance with ISO/IEC International Standard 15418, Information Technology EAN/UCC Application Identifiers and Fact Data Identifiers and Maintenance and ANSI MH 10.8.2 Data Identifier and Application Identifier Standard.
(B) Data Identifiers (DIs) (Format Indicator 06 of ISO/IEC International Standard 15434), in accordance with ISO/IEC International Standard 15418, Information Technology--EAN/UCC Application Identifiers and Fact Data Identifiers and Maintenance and ANSI MH 10.8.2 Data Identifier and Application Identifier Standard.
(ii) The encoded data elements of the unique item identifier conform to the transfer structure, syntax, and coding of messages and data formats specified for Format Indicators 05, 06, and 12 in ISO/IEC International Standard 15434, Information Technology-Transfer Syntax for High Capacity Automatic Data Capture Media.
(5) Unique item identifier.
(i) The Contractor shall—
(A) Determine whether to--
(1) Serialize within the enterprise identifier;
(2) Serialize within the part, lot, or batch number; or
(3) Use a DoD recognized unique identification equivalent (e.g. Vehicle Identification Number); and
(B) Place the data elements of the unique item identifier (enterprise identifier; serial number; DoD recognized unique identification equivalent; and for serialization within the part, lot, or batch number only: Original part, lot, or batch number) on items requiring marking by paragraph (c)(1) of this clause, based on the criteria provided in MIL-STD-130, Identification Marking of U.S. Military Property, latest version;
(C) Label shipments, storage containers and packages that contain uniquely identified items in accordance with the requirements of MIL-STD-129, Military Marking for Shipment and Storage, latest version; and
(D) Verify that the marks on items and labels on shipments, storage containers, and packages are machine readable and conform to the applicable standards. The contractor shall use an automatic identification technology device for this verification that has been programmed to the requirements of Appendix A, MIL-STD-130, latest version.
(ii) The issuing agency code—
(A) Shall not be placed on the item; and
(B) Shall be derived from the data qualifier for the enterprise identifier.
(d) For each item that requires item unique identification under paragraph (c)(1)(i), (ii), or (iv) of this clause or when item unique identification is provided under paragraph (c)(1)(v), in addition to the information provided as part of the Material Inspection and Receiving Report specified elsewhere in this contract, the Contractor shall report at the time of delivery, as part of the Material Inspection and Receiving Report, the following information:
(1) Unique item identifier.
(2) Unique item identifier type.
(3) Issuing agency code (if concatenated unique item identifier is used).
(4) Enterprise identifier (if concatenated unique item identifier is used).
(5) Original part number (if there is serialization within the original part number).
(6) Lot or batch number (if there is serialization within the lot or batch number).
(7) Current part number (optional and only if not the same as the original part number).
(8) Current part number effective date (optional and only if current part number is used).
(9) Serial number (if concatenated unique item identifier is used).
(10) Government's unit acquisition cost.
(11) Unit of measure.
(12) Type designation of the item as specified in the contract schedule, if any.
(13) Whether the item is an item of Special Tooling or Special Test Equipment.
(14) Whether the item is covered by a warranty.
(e) For embedded subassemblies, components, and parts that require DoD item unique identification under paragraph
(c)(1)(iii) of this clause or when item unique identification is provided under paragraph (c)(1)(v), the Contractor shall report as part of the Material Inspection and Receiving Report specified elsewhere in this contract, the following information:
(1) Unique item identifier of the parent item under paragraph (c)(1) of this clause that contains the embedded subassembly, component, or part.
(2) Unique item identifier of the embedded subassembly, component, or part.
(3) Unique item identifier type.**
(4) Issuing agency code (if concatenated unique item identifier is used).**
(5) Enterprise identifier (if concatenated unique item identifier is used).**
(6) Original part number (if there is serialization within the original part number).**
(7) Lot or batch number (if there is serialization within the lot or batch number).**
(8) Current part number (optional and only if not the same as the original part number).**
(9) Current part number effective date (optional and only if current part number is used).**
(10) Serial number (if concatenated unique item identifier is used).**
(11) Description.
**Once per item.
(f) The Contractor shall submit the information required by paragraphs (d) and (e) of this clause as follows:
(1) End items shall be reported using the receiving report capability in Wide Area WorkFlow (WAWF) in accordance with the clause at 252.232-7003. If WAWF is not required by this contract, and the contractor is not using WAWF, follow the procedures at http://dodprocurementtoolbox.com/site/uidregistry/.
(2) Embedded items shall be reported by one of the following methods--
(i) Use of the embedded items capability in WAWF;
(ii) Direct data submission to the IUID Registry following the procedures and formats at http://dodprocurementtoolbox.com/site/uidregistry/; or
(iii) Via WAWF as a deliverable attachment for exhibit line item number < >, Unique Item Identifier Report for Embedded Items, Contract Data Requirements List, DD Form 1423.
(g) Subcontracts. If the Contractor acquires by contract, any items for which item unique identification is required in accordance with paragraph (c)(1) of this clause, the Contractor shall include this clause, including this paragraph (g), in the applicable subcontract(s), including subcontracts for commercial items.
252.211-7006
PASSIVE RADIO FREQUENCY IDENTIFICATION (DEC 2019)
(a) Definitions. As used in this clause --
"Advance shipment notice" means an electronic notification used to list the contents of a shipment of goods as well as additional information relating to the shipment, such as passive radio frequency identification (RFID) or item unique identification (IUID) information, order information, product description, physical characteristics, type of packaging, marking, carrier information, and configuration of goods within the transportation equipment.
"Bulk commodities" means the following commodities, when shipped in rail tank cars, tanker trucks, trailers, other bulk wheeled conveyances, or pipelines:
(1) Sand.
(2) Gravel.
(3) Bulk liquids (water, chemicals, or petroleum products.)
(4) Ready-mix concrete or similar construction materials.
(5) Coal or combustibles such as firewood.
(6) Agricultural products such as seeds, grains, or animal feed.
"Case" means either a MIL-STD-129 defined exterior container within a palletized unit load or a MIL-STD-129 defined individual shipping container.
"Electronic Product Code (EPC)" means an identification scheme for universally identifying physical objects via RFID tags and other means.
The standardized EPC data consists of an EPC (or EPC identifier) that uniquely identifies individual object, as well as an optional filter value when judged to be necessary to enable effective and efficient reading of the EPC tags. In addition to this standardized data, certain classes of EPC tags will allow user-defined data. The EPC Tag Data Standards will define the length and position of this data, without defining its content.
"EPCglobal" means a subscriber-driven organization comprised of industry leaders and organizations focused on creating global standards for the adoption of passive RFID technology.
"Exterior container" means a MIL-STD-129 defined container, bundle, or assembly that is sufficient by reason of material, design, and construction to protect unit packs and intermediate containers and their contents during shipment and storage. It can be a unit pack or a container with a combination of unit packs or intermediate containers. An exterior container may or may not be used as a shipping container.
"Palletized unit load" means a MIL-STD-129 defined quantity of items, packed or unpacked, arranged on a pallet in a specified manner and secured, strapped, or fastened on the pallet so that the whole palletized load is handled as a single unit. A palletized or skidded load is not considered to be a shipping container. A loaded 463L System pallet is not considered to be a palletized unit load. Refer to the Defense Transportation Regulation, DoD 4500.9-R, Part II, Chapter 203, for marking of 463L System pallets.
"Passive RFID tag" means a tag that reflects energy from the reader/interrogator or that receives and temporarily stores a small amount of energy from the reader/interrogator signal in order to generate the tag response. The only acceptable tags are EPC Class 1 passive RFID tags that meet the EPCglobal Class 1 Generation 2 standard.
"Radio frequency identification (RFID)" means an automatic identification and data capture technology comprising one or more reader/interrogators and one or more radio frequency transponders in which data transfer is achieved by means…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .