(3-3) N4008520D0075.pdf
PDF 601 KB Posted
- Attached to
- Above Ground Storage Tank (AST) Inspection IDIQ Federal contract opportunity
- Solicitation number
- N4008520D0075
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until local time
X
A X B X C
D
EX
X G F
H theresa.feeley@navy.mil
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
11-Aug-2020
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA FAR (48 CFR) 53.214(c)
ANTHONY M. ZAMPETTI
1 158
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS
SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
CEDARVILLE ENGINEERING GROUP, LLC
159 E HIGH ST #500
POTTSTOWN PA 19464
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
N4008520D0075
N40085 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
THERESA R. FEELEY 215.897.2323
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
1 - 4 5 - 11
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
12 - 50 J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
52 - 54
K
REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 55 - 58
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
612N0 FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
anthony.zampetti@navy.mil
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: 215-897-8877 (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
$711,662.00
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) X 41 U.S.C. 253(c)( )5 (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE N68732
DEFENSE FINANCE AND ACCOUNTING SERVICE -
P O BOX 998022
CLEVELAND OH 44199
PART IV - REPRESENTATIONS AND INSTRUCTIONS
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
59 - 85
PART II - CONTRACT CLAUSES
NAVFAC MID ATLANTIC
PWD PHILADELPHIA
4921 S. BROAD STREET
BLDG 1, 2ND FLOOR
PHILADELPHIA PA 19112
215-897-6932FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
86 - 158
6. REQUISITION/PURCHASE NO.5. DATE ISSUED
15 May 2020
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
N4008520R3724
See Item 7
N4008520D0075
Section A - Solicitation/Contract Form
SOLICITATION REQUIREMENTS
A.1 Contract Title: IDIQ Above Ground Storage Tank Services outlined below and described in this
Performance Work Statement (PWS) at the Philadelphia Naval Business Center (PNBC), Philadelphia, PA 19112, the Naval Support Activity-Philadelphia (NSA-P), Philadelphia, PA 19111, Naval Support Activity, Mechanicsburg, PA 17050 and outlying areas supported by this installation under performance-based contract that is comprised of both Recurring Work and Non-Recurring Work Items.
A.2 Type of Contract: This is an Indefinite Delivery / Indefinite Quantity (IDIQ) type contract.
A.3 Minimum Guarantee: The only work authorized under this contract is that which is ordered by the
Government through issuance of a Task Order. The Government makes no representation as to the number of Task Orders or actual amount of work to be ordered. However, during the term of the contract, a minimum of the Firm-Fixed-Pricd CLIN for the base year period (CLIN 0001) is guaranteed to be ordered to the awardee under the basic performance period of the contract. Contractors are not guaranteed work in excess of the minimum guarantee specified herein.
A.4 Set-Aside: This is an 8(a) sole source procurement as per FAR 19.8 and under the Partnership Agreement between the Small Business Administration and the DOD. SBA Requirement No.: 0303-19-082019-01.
A.5 NAICS Code: The NAICS Code assigned to this procurement is 541990 with a small business size standard of $16,500,000.00. Refer to On-Line Representations and Certifications Applications (ORCA) via https://www.beta.sam.gov (FAR 52.219-1 – Small Business Program Representations (Oct 2014)).
A.6 Wage Determination: Service Contract Act Wages are included in this solicitation. Refer to Section J.
A.7 Bid Guarantee/Bonding Requirements: NOT REQUIRED for this procurement.
A.8 Contract Term: This contract contains provisions for a Base Period with four (4) Option Periods and one
(1) six month option extension, not to exceed a total of 66 months. The Government has the option to extend the term of the contract in accordance with Section I, Contract Clauses, 52.217-9 Option to Extend the Term of the Contract-Services (Mar 2000). In the option periods, the Government may adjust the prices, if applicable, based on the new Department of Labor Wage Determination.
A.9 Period of Performance: The period of performance will be determined at the time of award.
A.10 Evaluation of Proposals: Proposer shall submit a lump sum price for Section B, CLINs 0001 through
0010 and unit prices for ELINs A through E, referenced in Section J. Refer to Section M, FAR 52.217-5, Evaluation of Options (JUL 1990).
A.11 Contract Line Items And Exhibit Line Items:
a. Proposer shall enter unit prices and amounts for Contract Line Items (CLINs) and Exhibit Line Items
(ELINs) as indicated in the schedules and accompanying exhibits.
b. In the event there is a difference between a unit price and the extended total amount, the unit price will be held to be the intended bid and the total of the CLIN and ELIN will be recomputed accordingly.
The CLIN will also be recomputed to take into account the change in the contract ELINs. If the bidder provides a total amount for an ELIN, but fails to enter the unit price, the total amount divided by the ELIN quantity will be held to be the intended unit price.
c. The Schedule of Indefinite Delivery Indefinite Quantity Work (IDIQ) (CLINs 0001 through 0010) will be used as the basis for deductions in accordance with FAR 52.246-4, "INSPECTION OF SERVICES-FIXED PRICE, refer to Section E.
d. INDEFINITE DELIVERY INDEFINITE QUANTITY CLINs: The IDIQ ELINs shall be ordered under an individual task order basis.
A.12 Unit Price Adjustments In Option Periods:
This contract incorporates the Service Contract Act (SCA). The SCA Wage Determination incorporated in Section J is for the Base Year performance period only. The latest Wage Determination available at the time for each option exercise will be incorporated into the contract and the unit prices will be adjusted in accordance with FAR Clauses 52.222-43, Fair Labor Standards Act and Service Contract Act
– Price Adjustment. The contractor warrants, by submission of his proposal that the price does not include any contingency for future wage increases.
A.13 Indefinite Delivery Indefinite Quantity Exhibit Line Item Quantities:
Once the estimated quantities for individual line items shown in the Schedule have been ordered, additional quantities may be ordered as long as the overall not-to-exceed (NTE) amount of the contract per year is not exceeded and the Contractor agrees by signing the task order.
A.14 Unit Prices For Labor:
a. Estimated hours in the Schedule are a forecast of future requirements. These estimated hours are for performing "Indefinite Delivery Indefinite Quantity Work” accomplished in the time period shown.
b. The Contractor shall enter, in the unit price bid space, the unit price for performing composite labor. The composite labor price shall include all direct and indirect costs associated with performing an hour of work. The composite labor price should be the Contractor's hourly craft wage adjusted to allow for the bidders work force productivity (i.e., the Contractor's estimate of how its’ work force will perform in relation to the Means Facilities Cost Data and/or the Engineered Performance Standards). The Composite Labor Rate shall include all costs for preparation of the cost proposal, job preparation, travel, pre- expended bin materials and supplies, ordering and stockpiling job material, additional material handling, items of equipment necessary to perform work (i.e. bucket truck, lifting equipment, staging, etc.), equipment set up time, lift time, craft delay allowance, profit, tools, equipment, field and home office overhead, clerical support, supervision, inspection, fees, taxes, licenses, bonds, permits, insurance, etc.
A.15 Incorporation Of Technical Proposal:
a. The Contractor’s technical proposal, including revisions and amendments made prior to contract award and a copy of which is in the possession of both parties, will be incorporated into this contract upon award by reference with the same force and effect as if set forth in full text. All contractor personnel shall meet or exceed the qualification standards, experience levels, and trade backgrounds set forth in the technical proposal.
b. In the event of an inconsistency between the provisions of this contract and the technical proposal, the inconsistency shall be resolved by giving precedence in the following order: (i) the contract (excluding the technical proposal), and then (ii) the technical proposal.
A.16 Request For Proposals (RFP) Information/Clarification Questions:
The contractor is required to review the entire solicitation package before submitting questions. All questions must be submitted at least 2 days (48 hours) before proposal is due, Send to:
theresa.feeley@navy.mil. This is the most efficient way to ensure all questions are addressed in a timely manner.
A.17 Solicitation:
This solicitation incorporates by reference a Performance Work Statement (PWS) developed by using NAVFAC performance-based specifications. The PWS consists of Annexes 1, 2, and 18. The contractor will be required to meet the specifications in those Annexes as if they were set forth in Section C.
A.18 Notice to Offeror:
Offeror is required to submit Section B, Bid Schedule, and Section J, Exhibit Line Items (ELINs) with their proposal (Section J references the submission of Exhibits A – E (separate spreadsheet)). The total of the CLIN is equal to the sum of the ELINs as shown below:
CLINs ELINs 0001 Recurring Services - Base Period A001 through A015 0002 Non-Recurring Services - Base Period A700 through A706 0003 Recurring Services – 1ST Option B001 through B015 0004 Non-Recurring Services – 1st Option B700 through B706 0005 Recurring Services – 2nd Option C001 through C015 0006 Non-Recurring Services – 2nd Option C700 through C706 0007 Recurring Services – 3rd Option D001 through D015 0008 Non-Recurring Services – 3rd Option D700 through D706 0009 Recurring Services – 4th Option E001 through E015 0010 Non-Recurring Services – 4th Option E700 through E706
A.19 Site Visit: There will be no site visit for this requirement.
RFP DUE DATE:
THE REQUEST FOR PROPOSAL (RFP) IS DUE ON OR BEFORE 15 JUNE 2020 AT 3:00PM EASTERN
TIME. THE PROPOSAL MAY BE EMAILED (NO LARGER THAN 5MB), FAXED TO 215-897-6932,
MAILED (HARD COPY) AND/OR HAND CARRIED TO: NAVFAC MIDLANT PWD PA, 4921 S. BROAD
ST., BLDG 1, 2ND FLOOR, ATTN: THERESA FEELEY - CONTRACTS, PHILADELPHIA, PA 19112.
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES MAX
QUANTITY
UNIT UNIT PRICE MAX AMOUNT
0001 135,390 Each $1.00 $135,390.00
RECURRING SERVICES - BASE PERIOD
FFP
Schedule of Recurring Work - Exihibit Line Items (ELIN'S) A001-A015. Price for labor, equipment, material and supervision required to perform the Above Ground Storage Tank Inspection services specified in Section J. Work will be ordered as needed on individual task orders.
FOB: Destination
PSC CD: R425
MAX
NET AMT
$135,390.00
UNIT UNIT PRICE MAX AMOUNT
0002 576,272 Each $1.00 $576,272.00
NON-RECURRING-IDIQ SERVICES -BASE PERIOD
FFP
Schedule of Non-Recurring Work - Exihibit Line Items (ELIN'S) A700-A706.
Price for labor, equipment, material and supervision required to perform the Above Ground Storage Tank Inspection services specified in Section J. Work will be ordered as needed on individual task orders.
$576,272.00
UNIT UNIT PRICE MAX AMOUNT
0003 127,954.33 Each $1.00 $127,954.33
OPTION RECURRING SERVICES - 1ST OPTION
FFP
Schedule of Recurring Work - Exihibit Line Items (ELIN'S) B001-B015. Price for labor, equipment, material and supervision required to perform the Above Ground Storage Tank Inspection services specified in Section J. Work will be ordered as needed on individual task orders.
$127,954.33
UNIT UNIT PRICE MAX AMOUNT
0004 420,265.65 Each $1.00 $420,265.65
OPTION NON-RECURRING-IDIQ SERVICES - 1ST OPTION
FFP
Schedule of Non-Recurring Work - Exihibit Line Items (ELIN'S) B700-B706.
Price for labor, equipment, material and supervision required to perform the Above Ground Storage Tank Inspection services specified in Section J. Work will be ordered as needed on individual task orders.
$420,265.65
UNIT UNIT PRICE MAX AMOUNT
0005 142,388.69 Each $1.00 $142,388.69
OPTION RECURRING SERVICES - 2ND OPTION
FFP
Schedule of Recurring Work - Exihibit Line Items (ELIN'S) C001-C015. Price for labor, equipment, material and supervision required to perform the Above Ground Storage Tank Inspection services specified in Section J. Work will be ordered as needed on individual task orders.
$142,388.69
UNIT UNIT PRICE MAX AMOUNT
0006 423,873.65 Each $1.00 $423,873.65
OPTION NON-RECURRING-IDIQ SERVICES - 2ND OPTION
FFP
Schedule of Non-Recurring Work - Exihibit Line Items (ELIN'S) C700-C706.
Price for labor, equipment, material and supervision required to perform the Above Ground Storage Tank Inspection services specified in Section J. Work will be ordered as needed on individual task orders.
$423,873.65
UNIT UNIT PRICE MAX AMOUNT
0007 135,746.74 Each $1.00 $135,746.74
OPTION RECURRING SERVICES - 3RD OPTION
FFP
Schedule of Recurring Work - Exihibit Line Items (ELIN'S) D001-D015. Price for labor, equipment, material and supervision required to perform the Above Ground Storage Tank Inspection services specified in Section J. Work will be ordered as needed on individual task orders.
$135,746.74
UNIT UNIT PRICE MAX AMOUNT
0008 427,589.86 Each $1.00 $427,589.86
OPTION NON-RECURRING-IDIQ SERVICES - 3RD OPTION
FFP
Schedule of Non-Recurring Work - Exihibit Line Items (ELIN'S) D700-D706.
Price for labor, equipment, material and supervision required to perform the Above Ground Storage Tank Inspection services specified in Section J. Work will be ordered as needed on individual task orders.
$427,589.86
UNIT UNIT PRICE MAX AMOUNT
0009 151,060.16 Each $1.00 $151,060.16
OPTION RECURRING SERVICES - 4TH OPTION
FFP
Schedule of Recurring Work - Exihibit Line Items (ELIN'S) E001-E015. Price for labor, equipment, material and supervision required to perform the Above Ground Storage Tank Inspection services specified in Section J. Work will be ordered as needed on individual task orders.
$151,060.16
UNIT UNIT PRICE MAX AMOUNT
0010 431,417.56 Each $1.00 $431,417.56
OPTION NON-RECURRING-IDIQ SERVICES - 4TH OPTION
FFP
Schedule of Non-Recurring Work - Exihibit Line Items (ELIN'S) E700-E706.
Price for labor, equipment, material and supervision required to perform the Above Ground Storage Tank Inspection services specified in Section J. Work will be ordered as needed on individual task orders.
$431,417.56
CONTRACT MINIMUM/MAXIMUM QUANTITY AND CONTRACT VALUE
The minimum quantity and contract value for all orders issued against this contract shall not be less than the minimum quantity and contract value stated in the following table. The maximum quantity and contract value for all orders issued against this contract shall not exceed the maximum quantity and contract value stated in the following table.
MINIMUM
QUANTITY
MINIMUM
AMOUNT
MAXIMUM
QUANTITY
MAXIMUM
AMOUNT
1.00 $1.00 2,961,958.67 $2,961,958.67
DELIVERY/TASK ORDER MINIMUM/MAXIMUM QUANTITY AND ORDER VALUE
The minimum quantity and order value for each Delivery/Task Order issued shall not be less than the minimum quantity and order value stated in the following table. The maximum quantity and order value for each Delivery/Task Order issued shall not exceed the maximum quantity and order value stated in the following table.
MINIMUM
QUANTITY
MINIMUM
AMOUNT
MAXIMUM
QUANTITY
MAXIMUM
1.00 $1.00 2,961,958.67 $2,961,958.67
CLIN MINIMUM/MAXIMUM QUANTITY AND CLIN VALUE
The minimum quantity(s) and CLIN value(s) for all orders issued against the CLIN(s) on this contract shall not be less than the minimum quantity(s) and CLIN value(s) stated in the following table. The maximum quantity(s) and CLIN value(s) for all orders issued against the CLIN(s) on this contract shall not exceed the maximum quantity(s) and CLIN value(s) stated in the following table.
CLIN
MINIMUM
QUANTITY
MINIMUM
AMOUNT
MAXIMUM
QUANTITY
MAXIMUM
AMOUNT
0001 1.00 $1.00 135,390.00 $135,390.00 0002 1.00 $1.00 576,272.00 $576,272.00 0003 1.00 $1.00 127,954.33 $127,954.33 0004 1.00 $1.00 420,265.65 $420,265.65 0005 1.00 $1.00 142,388.69 $142,388.69 0006 1.00 $1.00 423,873.65 $423,873.65 0007 1.00 $1.00 135,746.74 $135,746.74 0008 1.00 $1.00 427,589.86 $427,589.86 0009 1.00 $1.00 151,060.16 $151,060.16 0010 1.00 $1.00 431,417.56 $431,417.56
CLIN DELIVERY/TASK ORDER MINIMUM/MAXIMUM QUANTITY AND CLIN ORDER VALUE
The minimum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not be less than the minimum quantity and order value stated in the following table. The maximum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not exceed the maximum quantity and order value stated in the following table.
CLIN
MINIMUM
QUANTITY
MINIMUM
AMOUNT
MAXIMUM
QUANTITY
MAXIMUM
0001 1.00
$1.00
135,390.00
$135,390.00
0002 1.00
576,272.00
$576,272.00
0003 1.00
127,954.33
$127,954.33
0004 1.00
420,265.65
$420,265.65
0005 1.00
142,388.69
$142,388.69
0006 1.00
423,873.65
$423,873.65
0007 1.00
135,746.74
$135,746.74
0008 1.00
427,589.86
$427,589.86
0009 1.00
151,060.16
$151,060.16
0010 1.00
431,417.56
$431,417.56
Section C - Descriptions and Specifications
DESCRIPTION AND SPECIFICATIONS
Annex 0100000 – C General Information Annex 0200000 – C Management and Administration Annex 1502000 – C Facility Investment
0100000 – General Information Spec Item Title 1 General Information
1.1 Outline of Services
1.2 Project Location
1.3 Acquisition of Additional Work
1.4 Background Information
1.5 Verification of Workload and Conditions
1.6 Climate Patterns
1.7 Related Information
1.8 Navy Approach to Service Contracting
1.8.1 Partnering Philosophy
1.8.2 Contractor's Knowledge
1.8.3 Industry Best Practices
1.9 Standard Template
1.10 Navy PBSA Approach
1.11 Technical Proposal Certification
Spec Item Title Description 1 General Information
1.1 Outline of Services Except where otherwise stated, the Contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to provide the services outlined below and described in this Performance Work Statement (PWS) at the Philadelphia Naval Business Center (PNBC), Philadelphia, PA 19112, the Naval Support Activity-Philadelphia (NSA- P), Philadelphia, PA 19111, Naval Support Activity, Mechanicsburg, PA 17050 and outlying areas supported by this installation under performance-based contract that is comprised of both Recurring Work and Non- Recurring Work Items.
The PWS is organized into annexes. Annex 1 is "General Information".
Annex 2 contains the on-site project management and administration requirements. Annexes 3 through 18 contain the technical requirements.
The annex numbers are identified as 1 through 18 in the description column, but the full expanded annex numbers include seven digits (e.g., Annex 1 expanded number is 0100000 as shown in the header row at the top of this page).
Annex 1 General Information Annex 2 Management and Administration Annex 3 Command and Staff – N/A Annex 4 Public Safety – N/A Annex 5 Air Operations – N/A Annex 6 Port Operations – N/A Annex 7 Ordnance – N/A Annex 8 Range Operations – N/A Annex 9 Health Care Support – N/A Annex 10 Supply – N/A Annex 11 Personnel Support – N/A Annex 12 Morale, Welfare and Recreation Support – N/A Annex 13 Galley – N/A Annex 14 Housing – N/A Annex 15 Facilities Support Annex C-1502000 Facility Investment Annex 16 Utilities – N/A Annex 17 Base Support Vehicles and Equipment – N/A Annex 18 Environmental – N/A
1.2 Project Location The work shall be performed at various locations. The following is an example of the dispersion of work at the various locations.
(1) Aboveground Storage Tank inspections at the Philadelphia Naval Business Center.
(2) Aboveground Storage Tank inspections at the Naval Support Activity, Philadelphia.
(3) Aboveground Storage Tank inspections at the Naval Support Activity, Mechanicsburg.
(4) Formal Storage Tank inspections at the Philadelphia Naval Business Center.
(5) Formal Storage Tank inspections at the Naval Support Activity, Philadelphia.
(6) Formal Storage Tank inspections at the Naval Support Activity, Mechanicsburg.
(7) Water testing for Aboveground Storage Tanks at the Philadelphia Naval Business Center.
(8) Water testing for Aboveground Storage Tanks at the Naval Support Activity, Philadelphia.
(9) Water testing for Aboveground Storage Tanks at the Naval Support Activity, Mechanicsburg.
1.3 Acquisition of
Additional Work
The Government reserves the right to acquire additional services at additional locations, within the scope of the annexes and areas included in Spec Item 1.1 Outline of Services, in addition to the services and locations identified in the requirements of this contract. Additional services will be incorporated into the contract in accordance with the CHANGES clause, SECTION I or ordered under the non-recurring work provisions of the contract. Items of work not covered by this contract but within the general intent are considered in the scope of this contract.
1.4 Background Information The Philadelphia Naval Business Center is a public/private installation that includes administration, industrial, and warehouse facilities. The Naval Support Activity-Philadelphia is a private installation that includes administration, industrial, and warehouse facilities.
1.5 Verification of
Workload and Conditions
Throughout the PWS, the workload data is generally referred to as being located in Sections C and J. Section C provides data such as descriptions, specifications, and the statement of work. Section J provides data such as system descriptions, inventories, maps, floor plans, and tables to represent the type, quantity, and location of services to be provided.
As prescribed in FAR 52.237-1, offerors or quoters are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award.
1.6 Climate Patterns The Philadelphia region has four distinct seasons. The city’s climate is moderated by its proximity to the Atlantic Ocean: high humidity in summer, frequent high winds and bitter cold in the winter. January’s average temperature is 33 F/1C temperatures tend to dip below freezing in the evening. July’s average temperature is 75 F/24C with sunny, humid days that sometimes exceed 90 F/10-15C. Clear skies 25% of the time;
partly cloudy skies 31%; cloudy skies 44%. Annual rainfall: 40 in/100 cm;
heaviest rain in July and August. Annual snowfall: 20 in/50cm.
1.7 Related Information There are four types of Related Information that can be found in the Description and Related Information columns of the specification as follows:
Informational Notes as used throughout this PWS provides additional information to offerors to be used in developing a thorough understanding of the work to be performed in this contract. Any block of text marked
“Informational Notes” throughout Annexes 1 through 18 is subject to this disclaimer. Offerors may not rely upon the "Informational Notes" as material representations of the Government. Information provided in "Informational Notes" does not create a contractual requirement on either party to this contract.
Clarifying Information describes client expectations in a more detailed manner than the Performance Objective and Performance standard alone.
Constraining Information describes limitations to the work performed to meet the Performance Objective and Performance Standard.
Requirement Information further describes client requirements associated with each Performance Objective.
1.8 Navy Approach to
Service Contracting
The Department of Navy (DoN) spends over $1 billion in annual obligations to meet global requirements for facility operations and maintenance provided through Facility Support Contracts (FSC) and additional billions to provide other base operations support services (OBOS). The Head of the Contracting Activity (HCA) of the Naval Facilities Engineering Command (NAVFAC) has focused increased attention on re-engineering FSC contracts in response to customer and industry feedback, budget constraints, and the impact of a variety of contracting, program management and financial management regulations.
The Navy also supports the following principles:
1.8.1 Partnering Philosophy The first principle is that the Navy views its contractors as partners and not just abstract service providers. The Navy wants its contractors to succeed because partners' success drives the Navy's successful mission completion.
Within the bounds of acquisition policy the Navy intends to work to find solutions that will be beneficial to both the Government and its partners.
1.8.2 Contractor's Knowledge The second principle is that the Navy will receive insightful management from its contractors. This management will include the knowledge, skills, authority and willingness to use contractor resources to find better ways of serving Navy clients’ strategic and operational goals and objectives. The Navy's use of performance-based objectives evidences this principle.
Although performance work statements will typically contain several levels of performance assessment, the Navy wants its contractors to exercise maximum discretion within bounds of prudent risk management to adjust processes and resources needed to reach specified objectives at the highest performance level.
1.8.3 Industry Best Practices The third principle is that the Navy will adopt industry best commercial practices and maintain state-of-the-art service delivery. To that end, the Navy's emphasis will be in evaluating performance objectives (end results).
1.9 Standard Template Key to implementing a programmatic approach is using a standard template that ensures Navy-wide consistency yet affords appropriate tailoring to meet local needs. This contract conforms to the standard template and has been tailored for this solicitation. NAVFAC intends to use this template-based approach for future service contracts. Offerors should develop an understanding of the template as part of performing due diligence in reaching an understanding of the Navy’s requirements and expectations.
The standard template contains 18 standard annexes. Annex 1 will always contain information that is relevant to the entire scope of the contract.
Annex 2 contains on-site project management and administration requirements that are relevant to the entire scope of the contract. Annexes 3 through 18 contain the technical information and requirements peculiar to that technical annex. Within each technical annex, the organization of information and requirements are also standardized. Specification Item 1 will always contain General Information. Specification Item 2 will always contain the management and administrative requirements. Specification Item 3 will always contain the Recurring Work requirements.
Specification Item 4 will always contain the Non-Recurring Work requirements. Requirements and standards for higher level specification items apply to all subordinate specification items, e.g., Specification Item 3 standards apply to all recurring work specification items. Specification Item 3.1 is applicable to all 3.1 subordinate specification items.
Specification Items 3.2 and 3.3 are not considered subordinate to 3.1. All costs associated with Annexes 1 and 2 and Specification Items 1 and 2 must be priced and their price must be allocated across the Exhibit Line Items.
1.10 Navy PBSA Approach The Navy’s approach to performance-based service acquisition (PBSA) includes four component parts which are 1) performance outcomes, 2) measurable standards, 3) consideration of incentives, and 4) performance assessment plan.
1.11 Technical Proposal
Certification
The Contractor warrants that its proposal incorporated herein by reference will meet or exceed the performance objectives set forth in this contract.
0200000 – Management and Administration
2 Management and Administration
2.1 Definitions and Acronyms
2.2 General Information
2.2.1 Government Regular Working Hours
2.2.1.1 Observed Federal Holidays
2.2.1.2 Restriction to Contractor Working Hours
2.2.2 Wage Determinations
2.2.3 Requirements Hierarchy
2.3 General Administrative Requirements
2.3.1 Required Conferences and Meetings
2.3.2 Training for Maintenance and Operation of New and Replacement Systems and Equipment
2.3.3 Partnering
2.3.3.1 Informal Partnering
2.3.3.2 Contract Partnering Administration
2.3.3.3 Contract Partnering Session Attendees
2.3.4 Permits and Licenses
2.3.5 Insurance
2.3.5.1 Certificate of Insurance
2.3.5.2 Minimum Insurance Amounts
2.3.6 Protection of Government Property
2.3.7 Directives, Instructions, and References
2.3.8 Invoicing Procedures
2.3.9 Forms
2.4 Government-Furnished Property, Materials and Services
2.4.1 Government-Furnished Facilities (GFF)
2.4.2 Government-Furnished Utilities
2.4.3 Government-Furnished Materials (GFM)
2.4.4 Government-Furnished Equipment (GFE)
2.4.5 Government-Furnished Services (GFS)
2.5 Contractor-Furnished Items
2.6 Management
2.6.1 Work Reception
2.6.2 Work Control
2.6.3 Work Schedule
2.6.4 Deliverables
2.6.5 Service Interruptions
2.6.6 Quality Management System (QMS)
2.6.6.1 Quality Management (QM) Plan
2.6.2.2 Quality Inspection and Surveillance
2.6.3.3 Quality Inspection and Surveillance Report
2.6.7 System and Equipment Replacement
2.7 Personnel Requirements
2.7.1 Key Personnel
2.7.1.1 Project Manager (PM)
2.7.1.2 Quality Manager
2.7.1.3 Site Safety and Health Officer (SSHO)
2.7.2 Employee Requirements
2.7.2.1 Employee Certification and Training
2.7.2.2 Employee Appearance
2.7.2.3 Employee Conduct
2.7.2.4 Identification as Contractor Employee
2.7.2.5 Removal of Employees
2.7.2.6 Proof of Legal Residency
2.7.3 Enterprise-wide Contractor Manpower Reporting Application (eCMRA)
2.8 Security Requirements
2.8.1 Employee Listing
2.8.2 Vehicles
2.8.3 Passes and Badges
2.8.4 Access to Installation
2.8.4.1 DBIDS Program
2.8.4.2 DBIDS Credentials
2.8.5 Access to Buildings
2.8.6 Access Arrangements
2.8.6.1 Escort Arrangement for Secured Areas
2.8.7 Security Clearances
2.8.8 Employee Status
2.9 Contractor Safety Program
2.9.1 Accident Prevention Plan (APP)
2.9.2 Activity Hazard Analysis (AHA)
2.9.3 Safety and Occupational Health (SOH) Risks and Compliance Plans
2.9.3.1 Alcohol and Drug Abuse Prevention Plan
2.9.3.2 Chemical Hazard Communication Program
2.9.3.3 Confined Space Program
2.9.3.4 Critical Lift Plan
2.9.3.5 Fall Prevention and Protection Plan
2.9.4 Crane Operations
2.9.4.1 Crane Inspections
2.9.4.2 Rigging Gear
2.9.4.3 Crane Operators
2.9.5 Accident and Damage Reporting
2.9.5.1 Accident Reporting and Notification Criteria
2.9.6 Fire Protection
2.9.7 Monthly On-Site Labor Report
2.9.8 OSHA Citations and Violations
2.9.9 Safety Inspections and Monitoring
2.9.10 Safety Certification
2.9.11 Safety Apparel on Jobsites
2.9.12 Emergency Medical Treatment
2.10 Environmental Management and Sustainability
2.10.1 Energy Management Program
2.10.1.1 Energy Efficient Products
2.10.2 Environmental Protection
2.10.2.1 Sampling, Testing and Laboratory Services
2.10.2.2 Solid Waste Management and Recycling
2.10.2.3 Non-Regulated Waste Disposal
2.10.2.4 Regulated Waste Disposal
2.10.2.5 Universal Waste
2.10.2.6 Spill Prevention, Containment, and Clean-up
2.10.2.7 Hazardous Material Management
2.10.2.8 Protection of Endangered and Threatened Species (Flora and Fauna)
2.10.2.9 Noise Control
2.10.2.10 Asbestos Containing Material (ACM)
2.10.2.11 Clean Air Act (CAA)
2.10.3 Sustainable Procurement and Practices
2.10.3.1 Environmentally Preferable Products
2.10.3.2 Use of Recovered Materials
2.10.3.3 Use of Biobased Products
2.11 Disaster Preparedness
2.12 Technical Library
2.13 Warranty Management
2.14 Recurring Work Procedures
2.14.1 Notification to the Government for Work Above the Recurring Work Limitations
2.14.2 Recurring Work Exhibit Line Item Numbers (ELINs)
2.15 Non-Recurring Work
2.15.1 Unit Priced Task (UPT) Work (Non-Negotiated)
2.15.1.1 Acceptance and Performance
2.15.1.2 Invoicing and Receiving Payment
2.15.2 Unit Priced Labor (UPL)Work (Negotiated)
2.15.2.1 Non-recurring Preparation of Proposals
2.15.2.1.1 Labor Requirements
2.15.2.1.2 Material and Equipment Requirements
2.15.2.2 Issuance of Final Task Order
2.15.3 Non-Recurring Work ELINS
0200000 - Management and Administration
2 Management and
Administration
2.1 Definitions and
Acronyms
Definitions and Acronyms are listed in J-0200000-01.
2.2 General
Information
2.2.1 Government
Regular Working Hours
The Government's regular working hours are from 0700-1700, five days per week, Monday through Friday, except observed Federal holidays. Exceptions to the regular hours of operation are detailed in subsequent sections of this PWS. Work in certain annexes or sub-annexes require Contractor continuous operations, 24 hours a day, every day of the year including holidays. The performance of other work requirements shall be accomplished within the Government’s regular working hours unless the specific work requirement specified herein necessitates otherwise. Any other work outside Government regular working hours requires prior KO approval.
2.2.1.1 Observed Federal
Holidays
The Government observes the following holidays: New Year’s Day, Martin Luther King Jr.’s Birthday, President’s Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Veterans’ Day, Thanksgiving Day, and Christmas Day.
2.2.1.2 Restriction to
Contractor Working Hours
The Contractor shall perform services during regular government working hours unless stated in a particular section of the specification or as directed on the task order.
If the Contractor wishes to work outside of the Government's regular working hours for the Contractor’s convenience, the Contractor shall submit a written Request to Work Outside Government’s Regular Working Hours per Section F. Excludes work to be performed during specified hours.
2.2.2 Wage
Determinations
Wage Determinations are included in J-0200000-02.
2.2.3 Requirements
Hierarchy Requirements or definitions specified in each spec item of this contract apply to subordinate paragraphs. For example, requirements shown in spec item 3.1 would apply to spec items 3.1.1, 3.1.2, 3.1.2.1 and so on.
Likewise, Performance Standards specified at a lower digit level (i.e. spec item 3.1.1, 3.1.2, 3.1.2.1) apply when performance is assessed at a higher tier (i.e., spec item 3.1) based on the composite work requirements.
2.3 General
Administrative Requirements
2.3.1 Required
Conferences and Meetings
The Contractor shall attend administrative and coordination meetings. The Contractor shall provide sign-in sheets and prepare minutes of all meetings and submit per Section F for review and comments. Comments received within two working days shall be incorporated into the minutes and a copy of the final revision shall be submitted per Section F for concurrence.
2.3.2 Training for
Maintenance and Operation of New and Replacement Systems and Equipment
When construction, renovation, or repair work is performed by means other than this contract, the Contractor shall attend Government provided training, as applicable, for maintenance and operation of new and replacement systems and equipment at no additional cost to the Government.
2.3.3 Partnering To increase the likelihood of successful performance of this contract, the Government requires cohesive partnerships with its Contractors and subcontractors. Key stakeholders, including the supported commands who will receive services, principal individuals from NAVFAC, the performance assessment team, and representative(s) of the installation(s) will be invited to participate in the partnering process. Key members of the prime and sub-contractor teams, including senior management personnel must participate.
The partnership will draw on the strength of each organization in an effort to achieve quality contract services done right the first time, within the contract price, as scheduled, and without any safety mishaps.
Partnering should accomplish three goals:
- The first goal is to develop a cohesive team with common purpose, commitment and established communication processes.
- The second goal of partnering is contract specific, identifying risks and opportunities for the team to address.
- The third goal is to sustain the Partnership throughout the contract by identifying and addressing issues that affect the Partnership.
2.3.3.1 Informal Partnering The Contracting Officer shall organize the initial Partnering Meeting with key personnel of the project team, including Contractor's personnel and Government personnel. The initial session will be scheduled concurrent with the Pre-Performance Conference and held no later than 30 days after award and will be held at a Government provided facility as designated by the KO.
The Initial Informal Partnering Session will be conducted and facilitated using electronic media (a video and accompanying forms) provided by Contracting Officer. The senior Government stakeholder present will lead the meeting, however, the Contractor’s PM or senior representative is encouraged to participate as co-lead.
The Partners will determine the frequency of the follow-on sessions.
2.3.3.2 Contract Partnering
Administration
Upon award, the ACO will contact the Contractor, supported command(s), Region, and Installation(s) stakeholders, and the performance assessment team to discuss implementation of partnering. A partnership agreement, The Charter, should be in place as early as possible so issues arising, even before work begins, can be resolved using the issues resolution process.
Replacement of Core Management Team members (stakeholders who attended the initial session and manage the contract work day-to-day) is discouraged since it will disrupt the synergy that has been developed. If replacement of a team member proves to be unavoidable, a follow-on partnering session must be held to officially turn the responsibilities of the position over to the new member.
The Core Management Team consisting of the attendees below must be present during the initial and all follow-on partnering sessions. These are the core mandatory attendees. Other stakeholders may attend if they desire or as recommended by the partners.
2.3.3.3 Contract Partnering
Session Attendees
The Contractor shall bring the necessary personnel to successfully partner on this contract. Asterisk indicates mandatory personnel.
President/Vice President
* Project Manager
* Quality Manager Site Safety and Health Officer
2.3.4 Permits and
Licenses
The Contractor shall obtain all required permits, licenses, and authorizations to perform work under this contract and comply with all the applicable Federal, state and local laws and regulations. The Contractor shall submit copies of Permits and Licenses per Section F.
2.3.5 Insurance The Contractor shall submit a Certificate of Insurance per Section F as evidence of the existence of the following insurance coverage in amounts not less than the amounts specified below in accordance with the FAR Clause
52.228-5, INSURANCE – WORK ON A GOVERNMENT
INSTALLATION. This insurance must be maintained during the performance period.
2.3.5.1 Certificate of
Insurance
The Certificate of Insurance shall provide for at least 30 calendar days written notice to the KO by the insurance company prior to cancellation or material change in policy coverage. Other requirements and information are contained in the aforementioned insurance clause.
2.3.5.2 Minimum
Insurance Amounts
The Contractor shall procure and maintain, during the entire period of performance under this contract, the following minimum insurance coverage:
Comprehensive General Liability: $500,000 per occurrence
Automobile Liability: $200,000 per person, $500,000 per occurrence, $20,000 per occurrence for property damage
Workmen's Compensation: As required by Federal and state worker's compensation and occupational disease statutes
Employer's Liability coverage: $100,000, except in states where worker's compensation may not be written by private carriers
Other as required by state law
2.3.6 Protection of
Government Property
During execution of the work, the Contractor shall protect Government property. The Contractor shall return areas damaged as a result of negligence under this contract to their original condition at no cost to the Government.
2.3.7 Directives, Instructions, and References
Department of Defense (DoD), Secretary of the Navy (SECNAV), Chief of Naval Operations (OPNAV), and other applicable Directives, Instructions, and References are listed in J-0200000-03. The Contractor shall comply with the most current version of directives, instructions, and references including versions published during the term of the contract.
2.3.8 Invoicing
Procedures
Refer to Section G for invoicing instructions. Refer to Invoice Form in J- 0200000-04 for sample.
2.3.9 Forms Forms referenced in this Annex, e.g. accident reporting, and damage reporting are included among the Forms in J-0200000-05.
2.4 Government-
Furnished Property, Materials and Services
In accordance with Section H, paragraph H.10 Govt-Furnished Property and the following paragraphs, the Government will furnish or make available to the Contractor certain Government-owned facilities utilities, materials, equipment and services for use in connection with this contract as stated below.
2.4.1 Government-
Furnished Facilities
(GFF)
None - The government will not furnish any facilities for use under this contract
2.4.2 Government-
Furnished Utilities
The Government will furnish water and electricity at existing outlets required for the work to be performed under the contract at no cost to the Contractor.
Information concerning the location of existing outlets may be secured from the KO. The Contractor shall provide and maintain, at its expense, the necessary service lines from the existing Government outlets to the work site.
Provide and maintain backflow prevention devices on connections to domestic water lines and electrical transformer provisions on connections to electric lines. Meet all Federal, State, local, and installation codes and regulations for backflow prevention devices and electrical transformer provisions. Services required by the Contractor, for which there are no available Government outlets, shall be provided by the Contractor at no cost to the Government.
2.4.3 Government-
Furnished Materials (GFM)
None - The government will not furnish any materials for use under this contract.
2.4.4 Government-
Furnished Equipment (GFE)
None - The government will not furnish any materials for use under this contract.
2.4.5 Government-
Furnished Services
(GFS)
None - The government will not furnish any materials for use under this contract.
2.5 Contractor-
Furnished Items
Except for items identified as Government Furnished, the Contractor shall provide all equipment, materials, parts, supplies, components, and facilities to perform the requirements of this contract. The KO may inspect Contractor-furnished items for adequacy and compliance with contract requirements.
Inadequate or unsafe items shall be removed and replaced by the Contractor at no cost to the Government. Materials containing asbestos, lead, and polychlorinated biphenyls (PCBs) shall not be brought onsite. Energy efficient tools and equipment shall be used when available. The KO may at any time require Samples, Safety Data Sheets (SDS) or Manufacturer’s Data Cut Sheets of Materials used in this contract.
2.6 Management The Contractor shall manage the total work effort associated with the services required herein to meet the performance objectives and standards. Such management includes but is not limited to planning, scheduling, cost accounting, report preparation, establishing and maintaining records, and quality assurance. The Contractor shall provide a staff with the necessary management expertise to ensure performance objectives and standards are met.
2.6.1 Work Reception The Contractor shall provide the capability to receive, prioritize, correspond, and respond to trouble/service calls and task orders during Government regular working hours and provide a point of contact at a local or toll free number who can perform the above function during other than Government regular working hours.
2.6.2 Work Control The Contractor shall implement all necessary work control procedures to ensure timely accomplishment of work requirements, as well as to permit tracking and reporting of work in progress. The Contractor shall plan and schedule work to assure material, labor, and equipment are available to complete work requirements within the specified time limits and in conformance with the quality standards established herein. Verbal scheduling and work status updates shall be provided when requested by the KO. A status update of any item of work must be provided within two hours of the inquiry during regular working hours, and by 0800 the following work day for inquiries after regular working hours.
2.6.3 Work Schedule The Contractor's work shall not interfere with normal Government business.
In those cases where some interference is unavoidable, the Contractor shall minimize the impact and effects of the interference. The Contractor shall provide advance access of all of its work schedules to the Government. The Contractor shall notify the KO of any difficulty in scheduling work due to Government controls.
2.6.4 Deliverables Records and reports are specified in Sections C, F, H, I, J, and within the Directives, Instructions, and References. The Contractor shall submit accurate and complete documents within the specified timeframes. The Contractor shall revise/modify records and reports, as directed by the KO, at no additional cost to the Government.
Except where otherwise specified, all deliverables shall be submitted electronically in a Microsoft Office Version 2010 compatible format.
Deliverables shall be unprotected and capable of being sorted by CLIN, work order number, asset number, section, annex/sub-annex, spec item and ELIN/Sub-ELIN or clause. All formulas shall be traceable.
Government acceptance of deliverables shall not relieve the Contractor of the responsibility for any error or omission which may exist in the deliverable, as the Contractor is responsible for all requirements of this contract.
2.6.5 Service
Interruptions If any utilities or other services must be discontinued (even temporarily) due to scheduled contract work, the Contractor shall notify the KO, affected tenants, and customers in accordance with local procedures. If the discontinued service is due to an emergency breakdown the Contractor shall notify the KO, affected tenants and customers as soon as practicable.
2.6.6 Quality
Management System (QMS)
The Contractor shall establish and maintain a complete QMS program in accordance with the provisions specified herein. The Contractor’s QMS program shall provide an effective and efficient means of identifying and correcting problems throughout the entire scope of operations. The Contractor's QMS program shall address:
• Accurate documentation of work processes, procedures, and output measures.
• A systematic procedure for assessing compliance with performance objectives and standards.
• Accurate documentation of quality inspections and surveillance conducted throughout the execution of work.
• Assessment-driven corrective actions and process adjustments as appropriate in a timely manner.
2.6.6.1 Quality
Management (QM) Plan
The Contractor shall develop and submit a QM Plan per Section F. The QM Plan shall describe the QMS methodology and approaches used under this contract. If any changes are made during the period of performance, submit to the KO a revised QM Plan for acceptance.
The Contractor’s QM Plan shall include, at a minimum, the following:
• Policy and objectives of Quality…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .