274-TM-1-26.pdf
PDF 7 MB Posted
- Attached to
- Resurfacing State and local contract opportunity
- Solicitation number
- 274-TM-1-26
- Issued by
- Wake County, Teachey Town, North Carolina
About this file
Bid Advertisement and Contract Documents for City of Raleigh Resurfacing Project
This is a formal bid advertisement and comprehensive contract document package for the City of Raleigh Department of Transportation's Annual Contract Resurfacing project (No. 274-TM-1-26) located in Raleigh, North Carolina. The project scope encompasses resurfacing approximately 13.38 centerline miles of city streets with approximately 19,310 tons of Superpave Asphalt, installing approximately 235 sidewalk access ramps, milling approximately 176,072 square yards of asphalt, installing approximately 16,091 tons of asphalt for pavement patching, furnishing and placing thermoplastic pavement markings, installing inductive detection signal loops, and removing and constructing approximately four speed humps. The mandatory pre-bid conference is scheduled for January 13, 2026, at 10:00 a.m. at 3228 Spottswood Street, Raleigh, North Carolina. Written questions must be submitted by January 20, 2026, at 5:00 p.m., with responses provided by January 23, 2026. Sealed bids are due February 10, 2026, at 2:00 p.m. at the Transportation Field Services Office. The contract completion date is November 1, 2026, with work to commence within ten calendar days of the Notice to Proceed.
A five percent (5%) bid deposit in the form of cash, cashier's check, certified check, or bid bond is required with each proposal submission. The City anticipates awarding the contract to the lowest responsible and responsive bidder and will require performance and payment bonds equal to 100 percent of the contract amount. Contractors must be properly licensed under North Carolina General Statutes Chapter 87 and comply with all applicable federal, state, and local regulations including OSHA requirements, North Carolina Occupational Safety and Health Standards, and the Americans with Disabilities Act. The contract includes a Minority and Women-Owned Business Enterprise (MWBE) participation goal of fifteen percent (15%) of the total contract amount for construction projects exceeding $300,000. Liquidated damages of $1,000 per calendar day apply for work not completed by the November 1, 2026, deadline. The City maintains the right to reject any or all proposals and is committed to equal opportunity procurement practices. Contract documents incorporate by reference the NCDOT Standard Specifications for Roads and Structures (latest edition), City of Raleigh Standard Details, the Manual on Uniform Traffic Control Devices, and ACI Specifications for Concrete Construction.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| addendum 1.pdf | ||
| addendum 3.pdf | ||
| 274-TM-1-26_addendum 2.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NAME OF BIDDER
ADDRESS
NC LICENSE NO.
ADVERTISEMENT, PROPOSAL, CONTRACT DOCUMENTS AND SPECIFICATIONS FOR
Annual Contract Resurfacing
RALEIGH DEPARTMENT OF TRANSPORTATION
TRANSPORTATION MAINTENANCE
274-TM-1-26
TRANSPORTATION DIRECTOR
222 WEST HARGETT STREET
DATE OF ADVERTISING: January 6th, 2026
DATE OF PRE-BID MEETING: January 13th, 2026, 10:00 a.m.
DATE OF BID OPENING: February 10th, 2026, 2:00 p.m.
3228 Spottswood St., Raleigh, NC
CITY OF RALEIGH
Annual Contract Resurfacing
PROJECT NO. 274-TM-1-26
DATE OF ADVERTISING: January 6th, 2026
DATE OF PRE-BID CONFERENCE: January 13th, 2026, 10:00 a.m.
DATE QUESTIONS DUE: January 20th, 2026, 5:00 p.m.
DATE FOR RESPONSES BY THE CITY: January 23rd, 2026, 5:00 p.m.
DATE OF BID OPENING: February 10th, 2026, 2:00 p.m.
NAME OF BIDDER:
ADDRESS:
NC LICENSE NO.:
BID DEPOSIT 5%:
TOTAL BID:
MWBE PERCENTAGE:
CONTRACTOR SIGNATURE:
6 – 7
8 – 9
11 – 25
27 – 47
48 – 51
52 – 55
56 – 59
61 – 62
63 – 64
65 – 73
74 – 98
99 – 102
109 – 138
TABLE OF CONTENTS
ADVERTISEMENT
PROPOSAL FORM
BIDDER’S CERTIFICATION
BID BOND
INSTRUCTIONS TO CONTRACTORS
CONTRACT
E-VERIFY AFFIDAVIT
MINORITY DOCUMENTATION FORMS
PERFORMANCE BOND
PAYMENT BOND
PROCEDURE FOR REPORTING SALES TAX
FINAL PAYMENT AFFIDAVIT
SCHEDULE OF PRICES
GENERAL INFORMATION SHEET
STREET ESTIMATE TOTALS SHEET
GENERAL CONDITIONS
STANDARD GENERAL PROVISIONS
FEDERAL CONTRACT PROVISIONS
PROJECT SPECIAL PROVISIONS
APPENDIX 139 – 185
103 – 108
ADVERTISEMENT
CITY OF RALEIGH PROJECT NO. 274-TM-1-26
Annual Contract Resurfacing
Pursuant to the General Statues of North Carolina, Section 143-128 et. seq, sealed proposals are invited and will be received by the City of Raleigh at the Transportation Field Services Office until 2:00 p.m. on February 10th, 2026, at which time a meeting at 3228 Spottswood Street, Raleigh, N.C., the sealed proposals will be publicly opened for construction consisting of furnishing and installing the following:
• Resurfacing of approximately 13.38 centerline miles of City streets, consisting of approximately 19,310 tons of Superpave Asphalt.
• Installation of approximately 235 sidewalk access ramps.
• Approximately 176,072 square yards of asphalt milling.
• Installation of approximately 16,091 tons of Intermediate and/or Base Course Asphalt for pavement patching.
• Furnishing and placement of thermoplastic pavement markings.
• Furnishing and installation of inductive detection signal loops.
• Removal and construction of approximately 4 speed humps.
Copies of the contract proposal may be obtained from the City of Raleigh beginning 6th day of January, 2026 for no fee, provided conditions are met as outlined in the bid documents.
A Mandatory Pre-Bid Conference for all contractors, subcontractors, minority and woman owned businesses will be held at 10:00 a.m. on January 13th, 2026 at 3228 Spottswood Street, Raleigh, NC 27615. Prospective bidders should contact James E. Simmons at the following email should there be any questions concerning the pre bid meeting:
james.simmons@raleighnc.gov or at 919-996-2354.
In review of the bid, Vendors may have questions to clarify or interpret the bid to submit the best bid possible. To accommodate the bid questions, Vendors shall submit any such questions by 5:00 p.m. on January 20th, 2026 .
The City will not entertain any further questions after the deadline. Send your questions via email to Daniel.Callahan@raleighnc.gov with the bid number in the subject line of your email. The City will answer all questions in addenda to the bid and post on the IPS website.
No proposal will be considered or accepted unless at the time of its filing, the same shall be accompanied by a cash deposit, cashier’s check, or certified check on a bank or trust company insured by the FDIC and authorized to do business in North Carolina in an amount equal to five percent (5%) of the proposal. In the alternative, a five percent (5%) bid bond issued by a corporate surety licensed by the State of North Carolina may be filed with the proposal. Bidders must be properly licensed under Chapter 87 of the General Statutes of North Carolina and must comply with nondiscrimination provisions. The City is an equal opportunity Municipality/Owner and invites small and minority contractors to bid. The City Council reserves the right to reject any or all proposals.
This the 6th day of January, 2026
THE CITY OF RALEIGH
Janet Cowell, MAYOR Paul Kallam, DIRECTOR, DEPT OF TRANSPORTATION
PROPOSAL FORM
PROPOSAL FOR THE CONSTRUCTION OF PROJECT 274-TM-1-26
IN THE CITY OF RALEIGH, NORTH CAROLINA
DATE
CITY COUNCIL
RALEIGH, NORTH CAROLINA
Ladies and Gentlemen: The undersigned bidder has carefully examined the Form of Contract, the Form of Contract Bonds, the General Conditions, the Special Conditions, the Plans and Specifications, all of which are acknowledged to be a part of the proposal, and the Proposal Form; and he has also carefully examined the site of the proposed work. The undersigned bidder agrees to bind himself on award to him by the City Council of the City of Raleigh under this proposal, to execute within ten (10) days, in accordance with such award, a Contract with necessary surety bonds, of which Contract this proposal and the plans and specifications shall be a part, to provide all necessary machinery, tools, labor, and other means of construction, and to do all the work and to furnish all materials, except as otherwise noted, necessary to perform and complete the said project within the time limit specified below. In addition to all other agreements and assurances, the undersigned bidder understands and hereby agrees as follows:
1. If this Contract is awarded, the bidder must, upon completion of this Contract, or at any other time requested, furnish to the City of Raleigh an accurate itemized statement of North Carolina Sales Tax paid on materials, supplies, equipment and any other items charged to this Contract, and otherwise fully comply with the “Procedure for Reporting North Carolina Sales Tax Expenditures”, attached.
2. The bidder further agrees to begin work within 10 calendar days from date of Contract Notice to Proceed.
3. The bidder represents and agrees to complete proposed work by November 1st, 2026.
Submitted this __________ day of____________________, 2026.
Name of bidder: _____________________________________________
Address: ___________________________________________________
BID FORM
PROPOSAL FOR THE CONSTRUCTION OF PROJECT NO. 274-TM-1-26
IN THE CITY OF RALEIGH, NORTH CAROLINA
DATE
CITY COUNCIL
RALEIGH, NORTH CAROLINA
Ladies and Gentlemen:
The undersigned bidder has carefully examined the Form of Contract, the Form of Contract Bonds, the General Conditions, the Special Conditions, the Plans and Specifications, all of which are acknowledged to be a part of the proposal, and the Proposal Form; and he has also carefully examined the site of the proposed work. The undersigned bidder agrees to bind himself on award to him by the City Council of the City of Raleigh under this proposal, to execute within ten (10) days, in accordance with such award, a Contract with necessary surety bonds, of which Contract this proposal and the plans and specifications shall be a part, to provide all necessary machinery, tools, labor, and other means of construction, and to do all the work and to furnish all materials, except as otherwise noted, necessary to perform and complete the said project within the time limit specified below.
In addition to all other agreements and assurances, the undersigned bidder understands and hereby agrees as follows:
1. If this Contract is awarded, the bidder must, upon completion of this Contract, or at any other time requested, furnish to the City of Raleigh an accurate itemized statement of North Carolina Sales Tax paid on materials, supplies, equipment and any other items charged to this Contract, and otherwise fully comply with the “Procedure for Reporting North Carolina Sales Tax Expenditures”, attached.
2. The bidder further agrees to begin work within 10 calendar days from date of Contract Notice to Proceed.
3. The bidder represents and agrees to complete proposed work by November 1st, 2026.
Submitted this __________ day of____________________, 2026.
Name of bidder: _____________________________________________ Address: ___________________________________________________
BIDDER’S CERTIFICATION
Acceptance of Terms
In submitting this Proposal, the undersigned agrees that this bid will remain in effect for a period of 60 days following the opening of the Bids, that the undersigned agrees to enter into a Contract with the Owner, if awarded, on the basis of this Proposal, and that the undersigned agrees to complete the work in accordance with the Contract Documents.
Non-Collusion in Bidding
The Bidder specifically agrees to abide by all applicable provisions of Article 3 of Chapter 133 of the North Carolina General Statutes. By submission of this Bid, each Bidder and each person signing on behalf of any Bidder certifies, and in case of a joint Bid each party thereto certifies as to its own organization, under penalty of perjury, that to the best of knowledge and belief:
1. The prices in this Bid have been arrived at independently without collusion, consultation, communication, or agreement, for the purpose of restricting competition, as to any matter relating to such prices with any other Bidder or with any competitor,
2. Unless otherwise required by Law, the prices quoted in the Bid have not been knowingly disclosed by the Bidder and will not knowingly be disclosed by the Bidder prior to opening, directly or indirectly, to any other Bidder or to any competitor, and
3. No attempt has been made or will be made by the Bidder to induce any other person, partnership, or corporation to submit or not to submit a Bid for the purpose of restricting competition.
Type of Business
The undersigned hereby represents that it is a __________________________ (corporation, partnership, an individual or limited liability company). If a corporation, the undersigned further represents that it is duly qualified as a corporation under the Laws of the State of North Carolina and it is authorized to do business in this State.
Firm Name Date
________________________________ Annual Contract Resurfacing Authorized Signature Name of Project
Title
Address of Firm
BID BOND (PENAL SUM FORM)
Bidder Surety
Name: Name:
Address (principal place of business): Address (principal place of business):
Owner Bid
Name: City of Raleigh Project (name and location):
Address (principal place of business):
222 W. Hargett Street Raleigh, NC 27601
Bid Due Date:
Bond
Penal Sum:
Date of Bond:
Surety and Bidder, intending to be legally bound hereby, subject to the terms set forth in this Bid Bond, do each cause this Bid Bond to be duly executed by an authorized officer, agent, or representative.
Bidder Surety
(Full formal name of Bidder) (Full formal name of Surety) (corporate seal)
By: By:
(Signature) (Signature) (Attach Power of Attorney)
Name: Name:
(Printed or typed) (Printed or typed)
Title: Title:
Attest: Attest:
(Signature) (Signature) Name: Name:
(Printed or typed) (Printed or typed)
Title: Title:
Notes: (1) Note: Addresses are to be used for giving any required notice. (2) Provide execution by any additional parties, such as joint venturers, if necessary.
1. Bidder and Surety, jointly and severally, bind themselves, their heirs, executors, administrators, successors, and assigns to pay to Owner upon default of Bidder the penal sum set forth on the face of this Bond. Payment of the penal sum is the extent of Bidder’s and Surety’s liability. Recovery of such penal sum under the terms of this Bond will be Owner’s sole and exclusive remedy upon default of Bidder.
2. Default of Bidder occurs upon the failure of Bidder to deliver within the time required by the Bidding Documents (or any extension thereof agreed to in writing by Owner) the executed Agreement required by the Bidding Documents and any performance and payment bonds required by the Bidding Documents.
3. This obligation will be null and void if:
3.1. Owner accepts Bidder’s Bid and Bidder delivers within the time required by the Bidding Documents (or any extension thereof agreed to in writing by Owner) the executed Agreement required by the Bidding Documents and any performance and payment bonds required by the Bidding Documents, or
3.2. All Bids are rejected by Owner, or
3.3. Owner fails to issue a Notice of Award to Bidder within the time specified in the Bidding Documents (or any extension thereof agreed to in writing by Bidder and, if applicable, consented to by Surety when required by Paragraph 5 hereof).
4. Payment under this Bond will be due and payable upon default of Bidder and within 30 calendar days after receipt by Bidder and Surety of written notice of default from Owner, which notice will be given with reasonable promptness, identifying this Bond and the Project and including a statement of the amount due.
5. Surety waives notice of any and all defenses based on or arising out of any time extension to issue Notice of Award agreed to in writing by Owner and Bidder, provided that the total time for issuing Notice of Award including extensions does not in the aggregate exceed 120 days from the Bid due date without Surety’s written consent.
6. No suit or action will be commenced under this Bond prior to 30 calendar days after the notice of default required in Paragraph 4 above is received by Bidder and Surety, and in no case later than one year after the Bid due date.
7. Any suit or action under this Bond will be commenced only in a court of competent jurisdiction located in the state in which the Project is located.
8. Notices required hereunder must be in writing and sent to Bidder and Surety at their respective addresses shown on the face of this Bond. Such notices may be sent by personal delivery, commercial courier, or by United States Postal Service registered or certified mail, return receipt requested, postage pre-paid, and will be deemed to be effective upon receipt by the party concerned.
9. Surety shall cause to be attached to this Bond a current and effective Power of Attorney evidencing the authority of the officer, agent, or representative who executed this Bond on behalf of Surety to execute, seal, and deliver such Bond and bind the Surety thereby.
10. This Bond is intended to conform to all applicable statutory requirements. Any applicable requirement of any applicable statute that has been omitted from this Bond will be deemed to be included herein as if set forth at length. If any provision of this Bond conflicts with any applicable statute, then the provision of said statute governs and the remainder of this Bond that is not in conflict therewith continues in full force and effect.
11. The term “Bid” as used herein includes a Bid, offer, or proposal as applicable.
INSTRUCTIONS TO CONTRACTORS
DO NOT REMOVE FROM CONTRACT
Please observe the following in executing the attached Contract:
1. The City may contract with various categories of legal entities; and the legal requirements for proper execution (signing, witnessing, etc.) differ as to each.
A. If the Contract is with an individual, that individual should sign the agreement exactly as his name is set out.
B. Execution on behalf of a corporation, authorized corporate officer must sign, with 2nd officer signing to attest (which is 2nd officer’s verification of authority and signature authenticity), plus corporate seal affixed. The following are corporate officers allowed to sign for the corporation: president; vice-president;
chairman; CEO; CFO; and Treasurer. The following officers are typically authorized to attest: secretary;
vice president, trust officer; clerk to board; cashier (only for banks); and their assistants or deputies.
A sole corporate officer may sign, accompanied with a notary’s acknowledgement, using the corporate acknowledgement form.
C. If the agreement is with a partnership (General Partnership or Limited Partnership), a general partner must sign, and his/her/its signature must be notarized.
D. LLC “Manager” or “managing member” must sign with proper notary acknowledgement.
2. After signing the Contract, the appropriate notary’s acknowledgement, either in the corporate form or individual/partnership form should be completed.
3. The Performance and Payment Bonds should be attached to the Contract package. Bonds are required by law on construction and repair contracts subject to formal bidding requirements (N.C.G.S. § 143-129 et seq. -- $300,000.00 for construction). They should be signed by the contractor, and his signature should be acknowledged with the appropriate acknowledgement form. Next, the bonds, in approved form, must be signed by the authorized agent of the Surety Company issuing the bonds, and an executed Power of Attorney document authorizing the agent to sign must accompany the bond documents. Bonds should not be dated. Bonds will be dated on or after the Contract date by the City. (Performance and Payment Bonds are not to be included in your bid)
4. The instrument should not be dated, except by the last person executing the Contract, normally the City Clerk.
5. Non-discrimination provisions should be included with the Contract, as should applicable Certificates of Insurance with proper and timely coverage indicated.
6. All modifications or deletions should be initialed or signed by representatives of both the Contractor and the City.
7. Three (3) original copies of the Contract are sent to the Contractor for execution. These three originals should be signed and returned to the City of Raleigh for final execution, after which one (1) copy will be returned to the Contractor.
Alternatively, copies of the contract may be executed through the City’s DocuSign process.
8. The minority business firm listing is to be completed and submitted as part of the Bid. Additional pages may be added as needed. All backup information related to solicitation of minority participation shall be copied and submitted with the Contract. Affidavit A and B must be submitted with your bid. Affidavit C or D must be submitted depending on MWBE commitment percentage.
NORTH CAROLINA
WAKE COUNTY
Rev.07/15/2025
NORTH CAROLINA
WAKE COUNTY
CONTRACT FOR CONSTRUCTION/REPAIR
THIS CONTRACT (the “Contract”) is entered into by and between [Keywords], hereinafter referred to as the “Contractor”, and the City of Raleigh, a North Carolina municipal corporation, hereinafter referred to as the “City” for the project entitled: Annual Contract Resurfacing.
WITNESSETH:
WHEREAS, the City desires to procure a contractor to perform services; and
WHEREAS, the City has completed necessary steps for retention of construction/repair services under State law and applicable City policies; and
WHEREAS, the City has agreed to engage the Contractor, and the Contractor has agreed to contract with the City, for performance of services as described, and according to the further terms and conditions, set forth herein.
NOW THEREFORE, in consideration of sums to be paid to the Contractor, and other good and valuable consideration, the Contractor and City do contract and agree as follows:
1. Description of Work The Contractor, at its own proper cost and expense and with skill and diligence, shall furnish all labor, tools, materials and equipment and do all things necessary for the proper construction and completion ready for use of the following improvements:
• Resurfacing of approximately 13.38 centerline miles of City streets, consisting of approximately 19,310 tons of Superpave Asphalt.
• Installation of approximately 235 sidewalk access ramps.
• Approximately 176,072 square yards of asphalt milling.
• Installation of approximately 16,091 tons of Intermediate and/or Base Course Asphalt for pavement patching.
• Furnishing and placement of thermoplastic pavement markings.
• Furnishing and installation of inductive detection signal loops.
• Removal and construction of approximately 4 speed humps.
In strict accordance with and as shown in the specifications, schedules, drawings and other documents set forth herein or incorporated by reference as follows:
• NCDOT Standard Specifications for Roads and Structures (latest edition)
• NCDOT Standard Drawings
• City of Raleigh Public Utilities Handbook
• City of Raleigh Standard Details
• City of Raleigh Guidelines for Land Disturbing Activities
• Manual on Uniform Traffic Control Devices
• ACI Specifications for Concrete Construction
The Contractor shall further perform in accordance with the directions (not inconsistent therewith) given from time to time during the construction by the project engineer or of such other official, employee, or other agent of the City as the City may designate.
2. General Obligations of the Contractor
The Contractor will accept the prices specified in this Contract in full compensation and satisfaction for the performance of this Contract and as consideration of this Contract. The Contractor shall be responsible for all loss and damages of every kind and nature which may arise out of or an account of the performance of the work required by this Contractor, and for all risks of every description connected with the said work; and the Contractor shall be responsible for well and faithfully completing the whole work according to all applicable plans and specifications and the terms and conditions of this Contract.
3. Time of Commencement and Completion
The entire work required by this Contract shall be commenced by the Contractor not later than 10 days after the date of Notice-to-Proceed and the entire work shall be completed not later than November 1st, 2026. Failure to complete the work by that time will result in damages due to public inconvenience, obstruction and delay to traffic, safety, and other considerations. For each consecutive calendar day in excess of the Contract time specified above, the Contractor shall have withheld monies due it, a sum of $1,000.00 per calendar day. If applicable, liquidated damages will be deducted/adjusted on a monthly basis at the time of the partial payment request, based on the Contractor’s progress in comparison with the approved progress schedule. In the event the Contractor does not complete the Contract within the contract deadline, including any extensions of time for excusable delays as noted in Article 17 of the General Conditions portion of the Contract Documents, the Contractor shall have withheld monies due it based on the above noted procedure. Further, the Contractor shall have withheld monies due it a sum of $1,000.00 for each consecutive calendar day of delay, until the Contract is completed.
4. Workmanship and Quality of Services/Warranties
All work under this Contract shall be done and performed to the satisfaction of the project engineer of the City of Raleigh, or of such other official, employee, or agent of the City as may be designated by the City, and such official, employee or agent designated by the City shall in all cases of dispute determine the quantity, quality, acceptability and fitness of the work and materials and of several portions thereof which are to be paid for under this Contract and shall decide and determine all questions which may arise as to the measurements, lines, levels and dimensions of the work and all questions respecting the true construction, interpretation or meaning of the plans and specifications. In case of dispute between the Contractor and the said official, employee, or agent of the City, the decision and determination of the latter shall be taken and shall be final and conclusive.
A. The Contractor, in executing this Contract, warrants that it will be responsible for the maintenance or correction of any work completed under this Contract that may become defective due to faulty workmanship or materials for a period of one (1) year after final acceptance of the work performed.
B. It is understood and agreed by the parties hereto that work done under this Contract shall be subject to all ordinances of the City of Raleigh relating to work done in the public streets or other public property of the City. Particularly reference is made to the provisions of Part 11, Chapter 6 of the Raleigh City Code.
5. Compensation
In consideration of the performance of this Contract and the full completion of the work required of the Contractor by the terms and conditions of this Contract, the City agrees to pay to the Contractor the not to exceed total Contract Amount of: (in written word and numerals), unless changed by a duly authorized amendment or change order.
A. Partial payments will be made to the Contractor by the City NET thirty (30) days after presentation of a true and accurate payment application to the City as certified by the Project Engineer or agent of the City.
B. All invoices must include the following Purchase Order Number_______________.
C. The final amount due to the Contractor will be made within thirty (30) days after the certified completion and final acceptance of all the work required by the Contract less retainage per Section 6. Payment to the Contractor by the City of the amounts so determined to be due, in accordance with this Contract, shall relieve the City from all claims for work done and materials and equipment furnished under this Contract.
D. It is further mutually agreed between the parties that no partial payment made under this
Contract shall be conclusive evidence of the performance of this Contract, either wholly or in part, and that no such payment shall be construed to be an acceptance of defective work or improper materials.
6. Retainage
This section will only apply if this public construction contract pertains to a project in which the total project costs are equal to or greater than one hundred thousand dollars ($100,000.00).
To ensure proper performance of the Contract, the City may retain five percent (5%) of the amount of each approved partial or periodic payment application until the project work is fifty percent (50%) complete, provided that the Contractor continues to perform satisfactorily, and any non-conforming work identified in writing prior to that date has been corrected by the Contractor and accepted by the construction manager.
If the City determines the Contractor’s performance is unsatisfactory, the City may reinstate retainage in the amount of five percent (5%) for each subsequent partial or periodic payment application until the Contractor’s performance becomes satisfactory. The project shall be deemed fifty percent (50%) complete when the contractor's gross project invoices, excluding the value of materials stored off-site, equal or exceed fifty percent (50%) of the value of the contract, except the value of materials stored on-site shall not exceed twenty percent (20%) of the contractor's gross project invoices for the purpose of determining whether the project is fifty percent (50%) complete. Following fifty percent (50%) completion of the project, the City may also withhold additional retainage from any subsequent periodic payment, not to exceed five percent (5%), to allow the City to retain two and one-half percent (2 ½%) total retainage through the completion of the project.
Within sixty (60) days after the submission of a pay request, the City with written consent of the surety shall release to the Contractor all retainage on payments held by the City if (1) the City receives a certificate of substantial completion from the architect, engineer, or designer in charge of the project; or
(2) the City receives beneficial occupancy or use of the project. However, the City may retain sufficient funds to secure completion of the project or corrections on any work. If the City retains funds, the amount retained shall not exceed two and one-half (2 ½) times the estimated value of the work to be completed or corrected. Any reduction in the amount of the retainage on payments shall be with the consent of the contractor's surety.
Retainer provisions contained in Contractor’s subcontracts may not exceed the terms and conditions for retainage provided herein. Contractors are further required to satisfy the retainage provisions of N.C.G.S. 143-134.1(b2) with regard to subcontracts for early finishing trades (structural steel, piling, caisson, and demolition) and to coordinate the release of retainage for such trades from the retainage held by the City from the Contractor pursuant to statute. Nothing shall prevent the City from withholding payment to the Contractor in addition to the amounts identified herein for unsatisfactory job progress, defective construction not remedied, disputed work, or third-party claims filed against the City or reasonable evidence that a third-party claim will be filed.
7. Notices
Except as otherwise expressly provided in this Contract, all notices, requests for payment, or other communications arising hereunder shall be sent to the following:
City of Raleigh Contractor Attn: James E. Simmons Attn:
Title: Senior Streets Projects Manager Title:
Address 1: P.O. Box 590 Address 1:
Address 2: Raleigh, NC 27602 Address 2:
Telephone: 919-996-2354 Telephone:
E-mail: james.simmons@raleighnc.gov E-mail:
8. Non-Discrimination
A. To the extent permitted by North Carolina law, the Parties for themselves, their agents, officials, directors, officers, members, representatives, employees, and contractors agree not to discriminate in any manner or in any form based on actual or perceived age, mental or physical disability, sex, religion, creed, race, color, sexual orientation, gender identity or expression, familial or marital status, economic status, veteran status or national origin in connection with this Contract or its performance.
B. The Parties agree to conform with the provisions and intent of Raleigh City Code §4- 1004 in all matters related to this Contract. This provision is incorporated into the Contract for the benefit of the City of Raleigh and its residents and may be enforced by an action for specific performance, injunctive relief, or any other remedy available at law or equity. This section shall be binding on the successors and assigns of all parties with reference to the subject matter of the Contract.
9. Minority and Women Owned Business Enterprise
The City of Raleigh prohibits discrimination in any manner against any person based on actual or perceived age, race, color, creed, national origin, sex, mental or physical disability, sexual orientation, gender identity or expression, familial or marital status, religion, economic status, or veteran status. The City maintains an affirmative policy of fostering, promoting, and conducting business with women and minority owned business enterprises.
10. Assignment
This Contract may not be assigned without the express written consent of the City.
11. Applicable Law
All matters relating to this Contract shall be governed by the laws of the State of North Carolina, without regard to its choice of law provisions, and venue for any action relating to this Contract shall be Wake County Civil Superior Court or the United States District Court for the Eastern District of North Carolina, Western Division.
12. Insurance
Contractor agrees to purchase at its own expense insurance coverages to satisfy the following minimum requirements. A certificate reflecting the following minimum coverages shall accompany this Contract:
A. Workers’ Compensation Insurance:
Limits:
Workers Compensation: Statutory for the State of North Carolina Employers Liability: Bodily Injury by Accident $1,000,000 each accident Bodily Injury by Disease $1,000,000 policy limit Bodily Injury by Disease $1,000,000 each employee
B. Commercial General Liability:
Each Occurrence: $1,000,000 Personal and Advertising Injury $1,000,000 General Aggregate Limit $2,000,000 Products and Completed Operations Aggregate $2,000,000
The aggregate limit must apply per project. The form of coverage must be the ISO CG 00 01 policy as approved by the State of North Carolina Department of Insurance. If a form of coverage other than the CG 00 01 is used it must be approved by the City’s risk manager. Any endorsed exclusions or limitations from the standard policy must be clearly stated in writing and attached to the Certificate of Insurance.
Completed Operations coverage must be maintained for the period of the applicable statute of limitations.
C. Commercial Automobile Liability:
$1,000,000 combined single limit.
D. Additional Insured:
Contractor agrees to endorse the City as an Additional insured on the Commercial General Liability, Auto Liability and Umbrella Liability if being used to meet the minimum liability limits for General Liability and Automobile Liability.
The Additional Insured shall read ‘City of Raleigh is named additional insured as their interest may appear’.
The Certificate Holder address should read:
City of Raleigh Post Office Box 590 Raleigh, NC 27602-0590
E. Builders Risk Coverage:
Minimum limit in the amount of total bid price. The Builder Risk policy must be endorsed to increase the limit of insurance for all change orders.
F. Policy Form:
Builder Risk coverage must be on a direct physical loss basis and contain no exclusion for theft, collapse or damage to foundations or underground structures, pipes or conduits.
G. Named Insured:
The Named Insured shall be The City of Raleigh, the Contractor, and all sub-contractors with a contractual assumption of responsibility for damage to the project.
All insurance companies must be licensed to do business in North Carolina and be acceptable to the City’s risk manager. If the insurance company(s) is a permitted surplus lines insurer, the insurance company name, and NAIC number must be submitted to the City’s risk manager for approval before commencing work. Contractor shall be required to provide the City no less than thirty (30) days’ notice of cancellation, or any material change, to any insurance coverage required by this Contract.
A Certificate of Insurance (COI) must be issued by an authorized representative of the insurance carrier(s). Certificates of Insurance must have the insurance company name and NAIC number clearly identified. The acceptance of or the review of Certificates of Insurance by the City does not relieve Contractor of any requirements in the Contract to provide specific insurance coverage required by the Contract, nor does the acceptance of or review of Certificates of Insurance covenant all insurance requirements have been met.
13. Surety Bonds
If Surety Bonds are required by the City for this project, the Contractor shall have furnished and attached hereto a performance bond and a payment bond each in the penal sum of the full Contract amount covering the faithful performance of the Contract and the payment of all obligations arising hereunder, in such form and content as the City may prescribe and with surety approved by the City. Should any surety upon the bond for the performance of this Contract become unacceptable to the City, the Contractor must promptly furnish additional security as may be required from time to time by the City to protect the interests of the City and of persons, firms and corporations supplying labor or materials in the performance of the work contemplated by the Contract.
14. Indemnity
A. To the fullest extent allowed by law, Contractor shall indemnify, defend, and hold harmless the City, its officers, officials, employees, agents, or indemnities (collectively called “Indemnified Parties”) from and against those Losses, liabilities, damages, and costs proximately caused by, arising out of, or resulting from the sole negligence of the Contractor, the Contractor’s agents, or the Contractor’s employees.
B. In matters other than those covered by subsection 14.1. above, and to the fullest extent allowed by law, Contractor shall indemnify, defend, and hold harmless the Indemnified Parties from and against those Losses, liabilities, damages, and costs caused by, arising out of, resulting from, or in connection with the execution of the work provided for in this Agreement when the Fault of the Contractor or its Derivative Parties is a proximate cause of the Loss, liability, damage, or expense indemnified.
C. Costs and expenses shall include attorneys’ fees, litigation or arbitration expenses, or court costs actually incurred by the Indemnified Parties to defend against third-party claims alleged in any court, tribunal, or alternative dispute resolution procedure required of any of the Indemnified Parties by law or by contract, only if the Fault of the Contractor or its Derivative Parties is a proximate cause of the attorney’s fees, litigation or arbitration expenses, or court costs to be indemnified.
D. The Contractor’s duty to indemnify, defend, and hold harmless described hereinabove shall survive the termination or expiration of this Contract.
E. Definitions:
i. For the purposes of this Section 14, the term “Loss” or “Losses” shall include, but not be limited to, fines, penalties, and/or judgments issued or levied by any local, state, or federal governmental entity.
ii. For the purposes of this Section 14, the term “Derivative Parties” shall mean any of the Contractor’s subcontractors, agents, employees, or other persons or entities for which the Contractor may be liable or responsible as a result of any statutory, tort, or contractual duty.
15. Communications
If communications to the public and/or City employees are required as part of the Contractor’s scope of work under this Contract, then the Contractor shall work with the City in the development of a communications plan (“Communications Plan”) that must first be approved by the City in writing before any such communications are delivered to the public and/or City employees.
For purposes of this Section 15, such written approval by the City shall be provided by electronic mail by the applicable City Communications Department employee who is responsible for reviewing and approving the Communications Plan, such electronic mail to be sent to the electronic mail address listed in Section 7, above, as part of the contact information for the Contractor representative identified in Section 7, above.
Among other things, the Communications Plan must establish whether the City or the Contractor will be responsible for sending any such communications to the public and/or City employees as required either by this Contract or the Communications Plan. The Communications Plan also shall include, but not be limited to, communications objectives, target audience, and deliverables (print, video, website, social, direct, or digital). The Contractor shall comply with the Communications Plan when communicating to the public and/or City employees pursuant to this Contract and the Communications Plan. All such communications shall comply with the City’s brand and communications guidelines, as the same may be amended or modified from time to time.
The City’s current brand and communications guidelines are incorporated into this Contract by reference and can be found on the City’s website here: https://raleighnc.gov/doing-business/city-brand-guidance-vendors.
For purposes of this Section 15, “Communications” is defined as any public or City employee facing information presented in channels such as, but not limited to, a website, mobile applications, social media, printed materials, vehicles, billboards, and videos.
A. Communications Plan Approval:
Any materials, messaging or outreach from the Contractor related to marketing and communications of any service or effort under this Contract must first be reviewed and approved by the City’s Communications Department. This is to ensure that the Communications Plan:
i. complies with the City’s brand and communication guidelines;
ii. integrates with the City’s other communications channels and digital strategy;
iii. meets accessibility guidelines; and
iv. conforms to communications best practices with respect to general user experience.
B. Accessibility Requirements:
For web content that the Contractor is to make accessible to the public and/or City employees as part of an approved Communications Plan that is included in the Contractor’s scope of work under this Contract, all web materials including, but not limited to, tools, mobile applications, and websites, generated by, or on behalf of, the Contractor must meet at least the mid-range conformance level, AA compliance of the https://raleighnc.gov/doing-business/city-brand-guidance-vendors https://raleighnc.gov/doing-business/city-brand-guidance-vendors current Web Content Accessibility Guidelines, as the same may be amended from time to time.
Any such web content generated by, or on behalf of the Contractor, as part of a Communications Plan associated with this Contract shall meet all standards of good cognitive web accessibility, which include the following:
i. Using proper headings and lists
ii. Using unique links
iii. Using alternative text and captions
iv. Using more white space
v. Dividing content into more manageable pieces
vi. Making forms manageable by breaking them into multiple, sequential steps
vii. Providing a logical reading order
viii. Being consistent with fonts, colors and locations of page elements
ix. Offering keyboard access
x. Offering content in multiple formats
xi. Understanding minimum contrast
C. Languages:
Digital sites/ tools that are for public use/consumption, including for use by City employees, under a Communications Plan associated with this Contract must have translation module (e.g., G-translate, Weglot) so that the service is available in all languages. At minimum, Spanish translation is required on all such digital sites/tools based on low English proficiency requirements:
i. In most cases, entities that are recipients of federal financial assistance through
U.S. Department of Health and Human Services (HHS) must provide language assistance services in order to comply with their legal obligation to take reasonable steps to ensure meaningful access to their programs by persons with Limited English Proficiency (LEP).
D. Content:
For any communications content that the Contractor is required to generate, or have generated, as part of its scope of work under this Contract, the Contractor shall send such content to City Communications Department staff in raw, high-resolution format for inclusion in communications materials to be made accessible to the public and/or City employees as set forth in the Communications Plan that arises from this Contract (i.e., https://www.hhs.gov/civil-rights/for-individuals/special-topics/limited-english-proficiency/index.html websites, mobile applications, printed materials collateral, and social media). PDF attachments shall be used only as a last resort and only after written approval by the City, with such written approval to be provided by the City in electronic mail format as described elsewhere in this Section 15.
i. Contractor shall only provide to the City communications materials for which the
City has rights to use, with written documentation of such use rights being provided to the City as requested from time to time by the City in its sole discretion.
ii. All working files agreed upon for the specific Communications Plan shall be provided to the City Communications Department, i.e., text, graphics, charts and data, infographics, and original native files such as Illustrator, Excel, ArcGIS, etc.
Following are the file format specifications:
a. Images: At least 300dpi for printing at actual size; 96dpi and at least
1920x1080px for digital/Web.
b. Video: Any video should be no less than Standard HD (1920x1080) but preferable 4k.
c. Text: Word document using accessibility best practices (heading structure, table of contents, and tables).
16. Advertising
The Contractor shall not use the existence of this Contract, or the name of the City, as part of any advertising without prior written approval of the City.
17. Acknowledgement of City Brand and Tree Logo Ownership and Restrictions
The City of Raleigh has developed proprietary branding (the “City Brand”) centered around the Raleigh tree mark logo (the “Tree Logo”). The City’s exclusive rights and ownership in and to the Tree Logo are protected under trademark and copyright, including U.S. Copyright Reg. No. VAu1-322-896, N.C. State Trademark Registration Reg. No. T-23070 and Federal Trademark Registration Reg. No. 5,629,347, as well as under other federal and state laws.
The Contractor acknowledges and understands that the City is not conferring any license to the Contractor under this Agreement to use or depict the Tree Logo or other aspects of the City Brand. The Contractor shall not make any use or depiction of the Tree Logo or other aspects of the City Brand without the prior express written approval of the City. In this regard, should any materials being produced by Contractor for the City under this Agreement contemplate use or depiction of the Tree Logo, including, but not limited to, printed materials, digital media, signage and/or display materials, Contractor shall proceed under the auspices and direction of the City’s Communications Department and shall comply with all guidelines and restrictions governing use or depiction of the Tree Logo.
18. Force Majeure
Except as otherwise provided in any environmental laws, rules, regulations or ordinances applicable to the parties and the services performed under this Contract, neither party shall be deemed to be in default of its obligations hereunder if and so long as it is prevented from performing such obligations by an act of war, hostile foreign actions, nuclear explosion, earthquake, hurricane, tornado, or other catastrophic natural event or act of God. Either party to the Contract must take reasonable measures and implement reasonable protections when a weather event otherwise defined as a force majeure event is forecast to be eligible to be excused from the performance otherwise required under this Contract by this provision.
19. Termination
If the Contractor fails to perform the work described herein by the time allowances provided in Section 3 or fails to provide adequate staff and resources required to properly execute said work in a workmanlike and safe manner, the City can declare the Contractor in Default.
If the Contractor fails to complete the work in the provided project duration as stated in Section 3 of this Contract, or fails to meet periodic schedules describing work sequence, or fails to comply with all appropriate local, federal, or state laws, rules and regulations, then the City may, without prejudice to any other right or remedy and after giving the Contractor and its surety a maximum of seven (7) days from delivery of a written notice, declare the Contract in default, take possession of the project and of all equipment, tools, materials thereon owned by the Contractor and call upon the surety or appropriate legal recourse to finish the work by whatever method deemed expedient.
20. Laws/Safety Standards
A. The Contractor shall comply with all laws, ordinances, codes, rules, regulations, safety standards and licensing requirements that are applicable to the conduct of its business, including those of federal, state, and local agencies having jurisdiction and/or authority.
B. All manufactured items and/or fabricated assemblies subject to operation under pressure, operation by connection to an electric source, or operation involving a connection to a manufactured, natural, or LP gas source shall be constructed and approved in a manner acceptable to the appropriate state inspector which customarily requires the label or re-examination listing or identification marking of the appropriate safety standard organization, such as the American Society of Mechanical Electrical Engineers for pressure vessels; the Underwriters' Laboratories and/or National Electrical Manufacturers' Association for electrically operated assemblies; or the American Gas Association for gas operated assemblies, where such approvals of listings have been established for the type(s) of devices offered and furnished. Further, all items furnished by the Contractor shall meet all requirements of the Occupational Safety and Health Act (OSHA), and state and federal requirements relating to clean air and water pollution.
C. Contractor must comply with North Carolina Occupational Safety and Health Standards for General Industry 13 NCAC 07F (29CFR 1910). In addition, Contractor shall comply with all applicable occupational health and safety and environmental rules and regulations.
D. The Contractor shall effectively manage its safety and health responsibilities including:
i. Accident Prevention:
Prevent injuries and illnesses to its employees and others on or near the job site.
Contractor managers and supervisors shall ensure personnel safety by strict adherence to established safety rules and procedures.
ii. Environmental Protection:
Protect the environment on, near, and around the work site by compliance with all applicable environmental regulations.
iii. Employee Education and Training:
Provide education and training to all contractor’s employees before they are exposed to potential workplace or other hazards as required by specific OSHA Standards.
21. Applicability of North Carolina Public Records Law
Notwithstanding any other provisions of this Contract, this Contract and all materials submitted to the City by the Contractor are subject to the public records laws of the State of North Carolina and it is the responsibility of the Contractor to properly designate materials that may be protected from disclosure as trade secrets under North Carolina law as such and in the form required by law prior to the submission of such materials to the City. Contractor understands and agrees that the City may take any and all actions necessary to comply with federal, state, and local laws and/or judicial orders and such actions will not constitute a breach of the terms of this Contract. To the extent that any other provisions of this Contract conflict with this section, the provisions of this section shall control.
22. Miscellaneous
A. The Contractor shall be responsible for the proper custody and care of any…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .