03. Attachment 3.1 - M&E PMP - Instructions.docx

DOCX document 58 KB Posted

Attached to
Supporting Citizen Journalists Federal grant opportunity
Opportunity number
SCAISB-20-AW-006-04012020
Issued by
Department of State US Embassy Islamabad

About this file

03. Attachment 3.1 - M&E PMP - Instructions

View the file

Other files for this federal grant opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 3.1 PAS M&E performance monitoring plan (PMP): instructions

Recommendation: Keep your PMPs transparent, concise and as simple as possible.

Key Terms:

Goal
The higher-order objective to which a project or program is intended to contribute. A goal should be lofty in nature and not resource-dependent. Many projects can contribute to the same goal.
Objective
A statement of the condition or state one expects to achieve. Objectives should be concrete, time-bound, and measureable and viewed as targets. Follow SMART criteria (see below).
Outcomes
The result or effect that is caused by or attributable to program or activity. Outcomes may be short‐term or long-term, intended or unintended, positive or negative, direct or indirect.
Activities
The actions you intend to conduct (training, workshops, screenings, campaigns, etc.) in order to reach your objectives and goals.
Outputs
Outputs are the products, goods, and services which result from activities. Ex: # of workshops, training hours, pamphlets, social media groups/posts, etc.
Indicator
A particular characteristic or dimension used to measure intended changes. Indicators are used to observe progress and measure actual results compared to expected results (targets). Indicators answer “how” or “whether” a project is progressing toward associated objectives. Indicators should be expressed quantitatively and should be objective and measureable (e.g. numeric value, percentages, indices). Examples of indicators include: number of gender-based violence survivors provided social support services; percent change in knowledge about investigative journalism; % of participants who feel the training is relevant to their career; 100% of milestone 4 achieved.
Target
An expected value or level for an indicator, at a specified point in time in the future. The target shows the level of achievement that is expected in order for results to occur. Targets are compared against actual results. A target is defined for each indicator as part of the M&E PMP. Related terms: Benchmark, Milestone
Method
Methods, sometimes called tools, are the processes one uses to collect data that is used to inform indicators. They can include both qualitative and quantitative processes, however indicators themselves must be in quantitative form. For example, one may hold focus groups, a qualitative methodology, to determine perceptions of a countering violent extremism program, however the data extracted may show that 50% of the focus group participants discussed negative perceptions of the programming: Your indicator is “perception of CVE” and your actual result is 50%. A method is used to collect evidence to show you’ve achieved your PMP’s targets.

GOAL: 1

AUDIENCE:

PROBLEM STATEMENT:

OBJECTIVE 1:

Activity
Indicator
Data Collection Method
Justification
Q?

Month-Month Q?

Month-Month Q?

Month-Month Q?

Month-Month

Total of target
% of target achieved
Target
Actual
Target
Actual
Target
Actual
Target
Actual

Outcome 1.1:

Output 1.1.1:

Output 1.1.2:

Outcome 1.2:3

Output 1.2.1:
4

Output 1.2.2:

Outcome 1.3:

Output 1.3.1:

Output 1.3.2:

M&E PMP Datasheet Instructions

The goal, audience, problem statement and objectives should be identical to the narrative in your proposal. Continuity across all documents is critical.

Not all programs have 3 objectives; some have less or more. Ensure that each objective has its own M&E chart as above.

Activities should be the same as those activities discussed in your proposal. Only include one activity per box, aligning the activity with your outcome and output indicators.

An indicator “indicates” process or change.

An output indicator is typically a simple count: # of hours, trainings, students, social media shares or likes, etc. These indicators are used as a basic accounting as to what has happened.

An outcome indicator shows change over time and can be both qualitative or quantitative. These indicators may include percentage change (in understanding, perception, capacity, either increase or decrease), milestones, etc.

SEE INDICATOR REFERENCE BELOW

Data Collection Methods vary. Some common data collection methods include:

Surveys:

Key Informant Interviews Baseline/2nd Survey Polling Community interviews

Focus Groups

Pre/Post Test designs.

Social Media Analysis Count of likes, shares, etc.

Sentiment Analysis.

Social Network Analysis

Basic counts.

Case studies

Stakeholder meetings

Field observation visits

Organizational Capacity Assessments

Document/Film/Image review

Most Significant Change

Mobile/Technology Solutions

CHOICE OF METHOD WILL BE BASED ON INDICATOR. There are several online resources on how to conduct the above.

Justification for the indicators you choose should follow the SMART criteria:

Specific: Clearly defined, objective, not subjective.

Measurable: Change can be demonstrated, quantifiable using available tools and methods.

Achievable: Fits within your capacity, budget and other resources.

Relevant: Tied to intended outputs & outcomes.

Time-Bound: Start and end point clearly defined.

Please formulate your justification in a simple, single statement.

Targets/Actuals:

This document will be updated every quarterly report with this information.

Input the Quarter of first reporting and the month range. Quarters and months are as follows:

Q1: Oct-Dec Q2: Jan-March Q3: April-June Q4: July-September

If your program is more than a year, cut and paste the entire chart to a new page.

Target: An estimation is the intended results, as defined by the indicator. Ex. 75% increase from pre-to post-test; 65% of respondents agree further work is needed to ease tensions on the border; 10 workshops were conducted.

Actual: This column is for reporting what occurred.

How the total of targets is calculated will be determined by the variable. Leave these blank for your GOR to calculate.

INDICATOR REFERENCE SHEET:

The below is an abbreviated guide; you are encouraged to design new indicators. This list is not exhaustive.

Activity
Outputs (Immediate Effects)
Data Collection Methods
Outcomes (Intermediate Effects)
Data Collection Methods
Impacts (Long-term Effects
Data Collection Methods

Workshops Training Mentoring Campaigns Videos Social Media Exhibitions Conferences Manuals Flyers Posters Small grants

# of …

Workshops Mentoring Sessions/Hours Conferences Manuals Flyers Etc.

What you choose to “count” your outputs will be determined by activity and requires evidence.

Ex.

Attendance sheets Manuals Active social media platforms Flyers

Outcomes show change over time. Some examples include:

% increase in knowledge

% increase/decrease in perceptions of US

Milestones achieved

Increase in social media network size (measures vary based on social media platform)

% increase in women’s/minorities participation

% of participants agree the training assisted in their career Data methods will be tied to the indicator. Some examples include:

Pre/Post Test

Baseline/2nd Survey

Clearly defined milestones

Social Media Analysis

Clearly defined observation criteria / Focus Groups

Key Informant Interviews (KII)

Looking at impact is difficult considering the duration of your program. To design indicators for impacts, one typically looks at the long-term goals and objectives, and tries to demonstrate causality.
There are many methods. See here.
PROCESS/PERFORMANCE DATA
OBJECTIVE-LEVEL DATA

File details come from the government source that posted it.