25-00733 Requirements and Specifications Wavemeter.pdf

PDF 173 KB Posted

Attached to
Wavemeter Federal contract opportunity
Solicitation number
NB688000-25-00733
Issued by
Department of Commerce National Institute of Standards and Technology

About this file

This is a Requirements and Specifications document for a Wavemeter being procured by the NIST Ion Storage Group (PML 688.10). The document outlines specifications for a visible/NIR wavemeter with multiple inputs and locking electronics to support quantum computing, quantum simulation, and optical clock experiments using trapped ions.

The key requirements include delivery, installation, and training to be completed within 24 weeks after receipt of order (ARO). The system requires turnkey installation and comes with standard manufacturer warranty. Software and electronic manuals must be provided. The government will conduct acceptance testing within 7 business days. No special facility requirements, training, maintenance agreements or travel are specified. The document indicates detailed technical specifications are provided in a separate attachment that must be met to satisfy the need. The Ion Storage Group requires very high accuracy measurements and the ability to simultaneously stabilize wavelengths of multiple lasers that are used to drive specific atomic transitions.

View the file

Other files for this federal contract opportunity

Other files attached to Wavemeter, newest first.
File Type Posted
25-00733 Wavemeter Detailed Specifications.docx DOCX document
NB688000-25-00733 Wavemeter RFQ Unrestricted LPTA.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R

Requirements / Specifications: Wavemeter 1 Version 1.0 (2019) Double-click on for further assistance.

Use this document to detail specifications/requirements for an item and/or ancillary services.

TITLE: Wavemeter Requesting Lab/Division/Group: PML 688.10

General Statement of Need The Ion Storage Group at NIST performs a variety of quantum computing, quantum simulation, and optical clock experiments using trapped ions. These experiments rely on the use of frequency-stabilized lasers of a variety of wavelengths to drive specific atomic transitions. We require a wavemeter to measure the wavelengths of multiple lasers and provide a suitable feedback signal to the lasers to stabilize their wavelengths to chosen values. The nature of the experiments requires very high accuracy for the wavemeter measurements and the ability to stabilize the wavelengths of multiple lasers simultaneously.

Items and/or Ancillary Services

Item 1: Visible/NIR wavemeter with multiple inputs and locking electronics Quantity: 1 Specifications: See attachment for detailed specifications. All list specifications must be met to satisfy the need.

Separately Priced Options and Services:

Item 2: [List minimum specifications.

Quantity: [Enter quantity here.] Specifications: [Enter quantity here.]

[List any other item(s) or service requirements here using the same format above.]

Service Requirements / Item Specifications

Section Requirements/Specifications Planning Considerations ☒ N/A

☐ List any visits required to allow potential vendors to see site specific constraints.

[Explain requirement here] ☐ US citizen required on-site (foreign nationals require preregistration 30 days prior) ☐ Vendor rep on-site more than three days ☐ Other considerations: [List other considerations to ensure an accurate quote]

Shipping & Delivery ☐ N/A

Standard shipping Shipping criteria:

☐ Partial delivery acceptable ☐ Direct delivery to building required [Explain need for requirement here] Building has: ☐ Loading dock

Requirements / Specifications: Wavemeter 2

☐ Containerization preference: [Choose container] Other requirements: [List any other requirements here] Delivery date criteria:

☒ Delivery of goods, installation, and training shall be completed no later than:

24 Weeks ARO ☐ Deliver no earlier than: [Insert date here] ☐ Other: [List other shipping, delivery, or specil requirements]

Electronic Media ☐ N/A

[Enter electronic media requirements by item here.] ☒ Software ☒ Electronic manuals ☐ License Key ☐ Other: [List any other Electronic Media requirements here] [Enter email address for software delivery here]

Installation ☐ N/A

[Enter installation requirements by item here.] ☐ Vendor technician on site ☐ Rigging ☐ Uncrating / Unpackaging ☐ Removal of packaging material ☐ Equipment set up ☐ Start-up services ☒ Turn key installation ☐ Other [Enter details here.] Note: When installation is required, TPOC or COR shall be the coordination point.

Facility / Utility Considerations ☒ N/A

No utility or facility requirements.

☐ OFPM Work Order Number(s) [List any Work Order Number(s) here] ☐ Power available Voltage: [Enter voltage here] (V) Max Current: [Enter max current draw here] (A) Phase: [Choose phase] Frequency: [Typically 60Hz] (Hz) NEMA Plug Type: [Enter plug type here] (i.e.: NEMA L5-20P) Environment: [Choose environment] Other power consideration: [List any other power considerations here] ☐ Utility connections: [List relevant available utilities, pressure(s), and flowrate(s)] ☐ Other considerations: [List other considerations to ensure an accurate quote]

Requirements / Specifications: Wavemeter 3

Warranty ☐ N/A

Base Manufacturer Warranty is acceptable [If you require an Extended Manufacturer Warranty, describe the warranty requirements per item here.] What is included?

☐ Labor ☐ Parts ☐ Travel ☐ Cost and liability for returns ☐ Other: [Enter other requirements here] ☐ Warranty length: [Enter warranty length here] Period Length:[Ex. month, 6 month, year etc.]

Training ☒ N/A

No training requirements ☐ On-site ☐ Off-site location: [Enter location(s) here] ☐ Number of trainees: [Enter number of trainees here] Scope of training:

☐ Operations ☐ Maintenance ☐ Troubleshooting ☐ Safety ☐ Other: [Enter other scope requirements here] ☐ Training materials to be provided: [Describe requirement here] ☐ Other: [Enter other training requirements here] Note: When training is required, TPOC or COR shall be the coordination point.

Inspection and Acceptance ☐ N/A

[Enter inspection requirements per item here] ☒ Planned government acceptance testing (7 business days) ☐ Gov’t acceptance expected to take longer than 7 business days: [Duration] ☐ Inspection and acceptance plan: [Explain here] ☐ Other: [Enter other requirements here]

Maintenance ☒ N/A none Period Length: [Ex. month, 6 month, year etc.] What is included?

☐ Labor ☐ Spare parts ☐ Consumables ☐ Travel ☐ Cost and liability for returns ☐ Software updates ☐ Manuals ☐ Service plan length: [Enter service plan length here] ☐ Other: [Enter other requirements here] ☐ Requirements: [Enter requirements here] (i.e.: onsite within 72 hours, etc.)

☐ Option Period 1 ☐ Option Period 2 ☐ Option Period 3 ☐ Option Period 4

Government Furnished Material / Equipment ☒ N/A none ☐ Samples for testing ☐ Government equipment which will leave gov't site (TPOC must coordinate with division property custodian) Serial Number: [Enter Serial Number here] Description: [Enter description here] NIST property number: [Enter NIST property number here]

Requirements / Specifications: Wavemeter 4

☐ Other: [Enter other details here] Travel ☒ N/A none ☐ Explain: [Explain here] ☐ Other: [Enter other requirements here] Vendor: To the maximum extent possible, include as part of appropriate sections above (maintenance, repair, etc.). Otherwise, it will be a separate line item, reimbursable per the Federal Travel Regulation.

Provide suggestions to improve this form by clicking here.

https://oaam.nist.gov/OAAMAcquisitions/FormFeedback/default.aspx

Use this document to detail specifications/requirements for an item and/or ancillary services.
TITLE: Wavemeter
Requesting Lab/Division/Group: PML 688.10
General Statement of Need
Provide suggestions to improve this form by clicking here.

File details come from the government source that posted it. Updated .