23Z5AQ2 Emg Repairs Housing Unit HVAC MATERIAL LIST.pdf

PDF 76 KB Posted

Attached to
FCI EL RENO HVAC REPAIR Federal contract opportunity
Solicitation number
15B50724Q00000001
Issued by
Department of Justice Bureau of Prisons Federal Correctional Institution El Reno

About this file

This document outlines material requirements for HVAC repairs at the Federal Correctional Institution in El Reno, Oklahoma. The Bureau of Prisons intends to purchase various HVAC parts including tees, elbows, couplings, tubing, solder, compressors, driers, and interlocks from qualified vendors. Key items include 10 each of several pipe fitting components, 20 feet each of 1-3/8 and 7/8 OD ACR tubing, 25 each of solder joints, 10 ZR16M3E compressors, 750 pounds of R407C refrigerant, 20 driers, and 20 interlocks. Deliveries must be made directly to the institution between 8 AM and 2:30 PM Monday through Friday, excluding federal holidays. This material list relates to solicitation 15B50724Q00000001 for HVAC repair services at FCI El Reno issued by the Department of Justice Bureau of Prisons.

View the file

Other files for this federal contract opportunity

Other files attached to FCI EL RENO HVAC REPAIR, newest first.
File Type Posted
HVAC RFQ LETTER.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Approved 9/15/23 SCRO

MATERIAL PURCHASE

EMG REPAIRS HOUSING UNIT HVAC

FCI EL RENO – PROJECT 23Z5AQ2

I. REQURIEMENTS

A. Scope of Work

The Federal Bureau of Prisons (FBOP), Federal Correctional Institution (FCI) El Reno intends to purchase supplies and material for in-house HVAC repairs at FCI El Reno, located at 4205 Highway 66 West, El Reno, OK 73036.

All supplies and materials must be submitted with full product detail sheets and specifications.

B. Material and Supplies Requirements

1. 10 EA W04080 RED TEE

2. 10 EA W40117 RED TEE 2-1/8 X 1-3/8 X 1-3/8

3. 10 EA W02734 7/8 90 LR ELL

4. 10 EA 7’-5” W02055 1-3/8 90 LR ELL

5. 10 EA W01055 1-3/8 COUP W/STOP

6. 10 EA W01072 2-1/8 COUP W/STOP

7. 20 FT ACR138 1-3/8 OD ACR TUBE PER FT

8. 20 FT ACR78 7/8 OD ACR TUBE PER FT

9. 20 FT ACR218 2-1/8 OD ACR TUBE PER FT

10. 25 EA US5-44 1/4 F FL X 1/4 SOLDER

11. 25 EA US5-66 3/8 F FL X 3/8 SOLDER A15726

12. 10 EA ZR16M3ETWD961 ZR16M3E-TWD-961 COMPRESSOR

13. 750 LB R407C25 R407C 25LB PER LB SUVA9000 UN3340, REFRIGERANT GAS R407C, CLASS 2.2

14. 20 EA HX48 DRIER CORE 48 CU. IN.

15. 20 EA FUR42CF35AF 42CF35AF 40A-3P-120V (61446)

16. 20 EA FUR49ACR6 49ACR6 INTERLOCK (61612)

C. Delivery of Supplies

1. Construction related deliveries which are directly shipped to the institution can be received between the hours of 8:O0 AM - 2:30 PM, Monday - Friday, excluding federal holidays.

File details come from the government source that posted it. Updated .