23Q0006 Proc Notes and NNSY Info and Clauses.pdf
PDF 275 KB Posted
- Attached to
- TELEDYNE HARDWARE COMPONENTS Federal contract opportunity
- Solicitation number
- SPMYM323Q0006
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 23Q0006 Combined Synopsis Solicitation.pdf | ||
| 23Q0006 Full Text Provisions and Clauses.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DLA PROCUREMENT NOTES
C01 Superseded Part Numbered Items (SEP 2016) If an item part number is superseded during the term of this contract, the contractor shall advise the contracting officer immediately upon determination. The notice shall include complete information on the superseding item form, fit, function, configuration, application, or physical nature. The contracting officer will determine whether the item is acceptable to the Government, advise the contractor within seven days, and modify the contract accordingly.
C02 Manufacturing Phase-Out or Discontinuation of Production, Diminishing Sources, and Obsolete Materials or Components (DEC 2016) The contractor shall notify the contracting officer immediately upon determining the unavailability of obsolete materials or components. The contractor may recommend a solution to include the impact on the contract price and delivery. The contractor shall not initiate any item redesign or incur any additional costs without the express, written authorization of the contracting officer.
In the event that manufacturing phase-out or discontinuance of production of such items is contemplated, the contractor is required to notify the contracting officer and publish the discontinuance in the Government-Industry Data Exchange Program (GIDEP), where feasible; and to provide immediate advance notice of production phase-out to DLA DMSMS at dscc.dmsms@dla.mil.
C03 Contractor Retention of Supply Chain Traceability Documentation (JUN 2020)
(1) By submitting a quotation or offer, the contractor, if it is not the manufacturer of the item, is confirming it currently has, or will obtain before delivery, and shall retain documented evidence (supply chain traceability documentation), as described in paragraph (2) of this procurement note, demonstrating the item is from the approved manufacturer and conforms to the technical requirements.
(2) At a minimum, the supply chain traceability documentation for the item shall include: basic item description, part number and/or national stock number, manufacturing source, manufacturing source’s Commercial and Government Entity (CAGE) code, and clear identification of the name and location of all supply chain intermediaries between the manufacturer to the contractor to item(s) acceptance by the Government. The documentation should also include, if available, the manufacturer's batch identification for the item(s), such as date codes, lot codes, or serial numbers. In addition, the contractor will obtain and supply any quality requirements necessary to prove the material meets the technical description. Evidence of quality consist of test results, material certifications, and manufacturing process sheets, identified by the technical data.
(3) Contractors can find examples of acceptable supply chain traceability documentation at the Counterfeit Detection and Avoidance Program (CDAP) website (http://www.dla.mil/LandandMaritime/Business/Selling/Counterfeit-Detection-Avoidance- Program/).
(4) The contractor shall immediately make documentation available to the contracting officer upon request. The contracting officer determines the acceptability and sufficiency of documentation. The contractor shall retain supply chain traceability documentation for six years after final payment under this contract for audit and other valid government purposes. If the contractor fails to retain or provide the documentation, or the contracting officer finds the documentation to be unacceptable, the contracting officer may take corrective action, including, but not limited to, cancellation of undelivered orders or rejection of delivered supplies.
C04 Unused Former Government Surplus Property (SEP 2021) To be considered for award, the offeror must complete and submit the following representation with their offer. Additional supporting documentation to demonstrate the surplus material offered was previously owned by the Government and meets solicitation requirements must be provided within 24 hours of request by the contracting officer.
(1) The material is new, unused, and not of such age or so deteriorated as to impair its usefulness or safety. Yes [__] No [__] The material conforms to the technical requirements cited in the solicitation (e.g., Commercial and Government Entity (CAGE) Code and part number, specification, etc.). Yes [__] No __ The material conforms to the revision letter/number, if any is cited. Yes [__] No [__] Unknown __ If No, the revision does not affect form, fit, function, or interface. Yes__ No __ Unknown __ The material was manufactured by:
(Name): ______________________________________________________________________ (Address): ___________________________________________________________________
(2) The offeror currently possesses the material Yes __ No __ If yes, the offeror purchased the material from a Government selling agency or other source.
Yes __ No __ If yes, complete the following:
Government Selling Agency: ___________________________________________________ Contract Number: ____________________________________________________________ Contract Date: (Month, Year): __________________________________________________ Other Source: ________________________________________________________________ Address: ____________________________________________________________________ Date Acquired: (Month/Year) ___________________________________________________
(3) The material has been altered or modified. Yes __ No __ If Yes, complete the following:
Name of the company that performed the alternation or modification:
mailto:dscc.dmsms@dla.mil
[(Address): __________________________________________________________________ Complete description of the alterations or modifications.
(4) The material has been reconditioned. Yes __ No __ If Yes, complete the following:
(i) The price offered includes the cost of reconditioning /refurbishment. Yes __ No __ (ii) Name of the company that reconditioned the material.
(iii) Description of any work done or to be done, including the components to be replaced and the applicable rebuild standard.
____________________________________________________________________________ The material contains cure-dated components. Yes __ No __ If Yes, complete the following:
(i) The price includes replacement of cure-dated components. Yes __ No __
(ii) Cure date: ____________________
(5) The material has data plates attached. Yes __ No __ If Yes, insert all information contained on the data plate.
(6) The offered material is in its original package. Yes __ No __ If yes, complete the following:
Contract Number ______________________________________________________________
NSN_________________________________________________________________________
CAGE Code__________________________________________________________________ Part Number __________________________________________________________________ Other Markings/Data___________________________________________________________
(7) The offeror has supplied this same material (National Stock Number) to the Government before. Yes __ No __ If Yes, complete the following:
(i) The material being offered is from the same original Government contract number as that provided previously. Yes __ No __
(ii) State below the Government Agency and contract number under which the material was previously provided:
Agency ______________________________________________________________________ Contract Number_______________________________________________________________
(8) The material is manufactured in accordance with a specification or drawing. Yes __ No __ If Yes, complete the following:
(i) The specification/drawing is in the possession of the offeror. Yes __ No __
(ii) The offeror has stated the applicable information below: Yes __ No __ Specification/Drawing Number ___________________________________________________ Revision (if any) _______________________________________________________________ Date__________________________________________________________________________
(9) The material has been inspected for correct part number and for absence of corrosion or any obvious defects. Yes __ No __ If Yes, complete the following:
(i) Material has been re-preserved. Yes __ No __
(ii) Material has been repackaged. Yes __ No __
(iii) Percentage of material that has been inspected is ____%; and/or
(iv) Number of items inspected is _______
(v) A written report was prepared. Yes __ No __ The offeror agrees that in the event of award and notwithstanding the provisions of the solicitation, inspection and acceptance of the surplus material will be performed at source or destination subject to all applicable provisions for source or destination inspection.
The offeror will forward one of the following, within 24 hours of request by the contracting officer, to demonstrate that the material being offered was previously owned by the Government (offeror check which one applies):
___ For national or local sales, conducted by sealed bid, spot bid or auction methods, a solicitation/Invitation For Bid and corresponding DLA Disposition Services Form 1427, Notice of Award, Statement and Release Document.
___ For DLA Disposition Services Commercial Venture (CV) Sales, the shipment receipt/delivery pass document and invoices/receipts used by the original purchaser to resell the material.
___ When the above documents are not available, or if they do not identify the specific NSN being acquired, a copy or facsimile of all original package markings and data, including NSN, commercial and Government entity (CAGE) code and part number, and original contract number. (This information has already been provided in paragraph (6) of this procurement note Yes __ No __) ___ When none of the above are available, other information to demonstrate that the offered material was previously owned by the Government. Describe:
This procurement note only applies to offers of Government surplus material. Offers of commercial surplus, manufacturer’s overruns, residual inventory resulting from terminated Government contracts, and any other material that meets the technical requirements in the solicitation but was not previously owned by the Government will be evaluated in accordance with the DLAD procurement note L04, Offers for Part Numbered Items.
If requested by the contracting officer, the offeror shall furnish sample units, in the number specified, to the contracting officer or to another location specified by the contracting officer, within 10 days after the contracting officer's request. The samples will be furnished at no cost to the Government. All such samples not destroyed in evaluation will be returned at the offeror's expense. The samples will be evaluated for form, fit, and function with subassembly, assembly, or equipment with which the items are to be used.
End items furnished under any contract award to the offeror furnishing the samples can include the returned samples, and all acceptable end items will have a configuration identical to the samples. If specific tests of the samples' performance are made by the Government, the offeror will be furnished the results of such tests prior to a contract being entered into. In addition to any other inspection examinations and tests required by the contract, the performance of the end items will be required to be as good as that of the samples submitted.
In the event of award, the contractor will be responsible for providing material that is in full compliance with all requirements in the contract or order. The surplus material to be furnished must meet the requirements of the current contract or order, whether or not the material met Government requirements in existence at the time the material was initially manufactured or sold to the Government. If higher-level contract quality requirements apply to the material being acquired, those requirements do not apply to surplus material furnished under this contract.
C14 Correction of Nonconforming Packaging or Marking (MAY 2020)
(1) The Government may correct nonconforming packaging or marking for receipts of DLA- owned materiel if the estimated costs of correction are $1,000 or less. The contracting officer will advise the contractor of the discrepancy and that the Government has corrected the packaging or marking. The contracting officer will make a determination concerning appropriate reimbursement by the contractor for the Government’s costs to correct the deficiencies. Upon determining that reimbursement is required, the contracting officer will send a notice to the contractor. Upon receipt of notice from the contracting officer, the contractor shall reimburse the Government for the costs incurred by the Government to correct the deficiencies.
(2) If the estimated costs of correction for receipts of DLA-owned materiel are more than $1,000, the contracting officer will advise the contractor of the discrepancy and have the materiel returned to the contractor for correction/resubmittal; or, if there are urgent requirements, have the Government remediate the discrepancy at the contractor’s expense. If the Government remediates the discrepancy, the contracting officer will make a determination concerning appropriate reimbursement by the contractor for the Government’s costs to correct the deficiencies. Upon determining that reimbursement is required, the contracting officer will send a notice to the contractor. Upon receipt of notice from the contracting officer, the contractor shall reimburse the Government for the costs incurred by the Government to correct the deficiencies.
C20 Vendor Shipment Module (VSM) (NOV 2022)
(1) The DLA Vendor Shipment Module (VSM) is a web-based system for DLA contractors obtain current shipping addresses, two-dimensional bar coded shipping labels in accordance with MIL-STD-129, bills of lading, packing lists, and other shipping documentation.
Contractors using VSM do not need to contact the transportation office prior to shipping items.
Contractors shall use VSM to print labels for f.o.b. destination contracts ; and to print labels and arrange for shipping for f.o.b.
origin contracts. All contractors will use VSM to obtain shipping labels no more than two (2) days prior to shipment to ensure the current destination address is used.
(2) To obtain information for contracts administered by DLA or to register as a VSM user, the contractor shall contact the DLA VSM Helpdesk at (800) 456-5507 or via email to delivery@dla.mil.
(a) Before contacting the Government to advise that material is ready to ship, the contractor shall complete its VSM profile, to include regular business hours and observed holidays. The Government may request reimbursement for occurrences when the Government sends carrier equipment but is unable to pick-up a shipment because the material was unavailable or the contractor facility was closed.
(3) To obtain information for contracts administered by DCMA, the contractor shall contact the DCMA VSM Helpdesk at (314) 331-5573 or vsm.shipments@dcma.mil.
E05 Product Verification Testing (MAY 2020)
(1) Product verification testing (PVT) under this procurement note will only apply when the contracting officer specifically invokes it in writing. The contracting officer may invoke PVT at or after contract award. If the contracting officer invokes PVT at contract award, the contract will explicitly state this testing requirement. If the contracting officer invokes PVT after contract award, the contracting officer shall notify the contractor and the cognizant DCMA ACO. The Government will perform PVT testing at a Government-designated testing laboratory.
(2) The contractor shall not ship or deliver any material until it receives notification of the acceptable PVT results, unless the contracting officer directs it to do so in writing The Government will provide the PVT results to the contractor within 20 business days after receipt at the Government testing facility, unless the Government specifies otherwise in writing.
(3) The contractor shall provide and maintain an inspection system acceptable to the Government in accordance with FAR Clause 52.246-2 or 52.246-3; and maintain and make available all records evidencing those details if requested by the Government.
When the Government finds evidence of risk associated with the contractor’s sampling process, the Government may witness and evaluate the contractors sampling process. The contractor shall randomly select samples from the production lot(s), unless the contracting officer specifies otherwise in writing. The contractor shall ship the selected PVT samples with a copy of the system of record receiving mailto:vsm.shipments@dcma.mil report (i.e., WAWF, DD Form 250, or commercial shipping document) and the contractor’s signed DD Form 1222. The contractor shall prepare the shipping container(s) by marking the external packages in bold letters, “Product Verification Test Samples – Do Not Post to Stock," Contract Number [contractor insert] and Lot/Item Number [contractor insert]” adjacent to the MIL-STD-129 (latest revision) identification markings. The contractor shall use a hard copy of the system of record receiving report as a packing list, in accordance with DFARS Appendix F. The contractor shall mark the exterior of the shipping container in accordance with MIL-STD- 129 (latest revision), paragraph 5.11. The contractor shall send samples by traceable means (e.g., certified or registered mail, United Parcel Service, Federal Express). The contractor shall include the following in the interior package:
(a) Hard copies of the contract;
(b) Material certifications/process operation sheets; and
(c) Drawings used to manufacture the units and return shipping information.
(4) The Government will return samples that pass testing and are not destroyed during evaluation to the contractor at the Government's expense for the contractor to include as part of the total contract quantity to be delivered under the contract. The contractor and Government may agree to dispose of samples not destroyed when the cost of the item does not justify the shipping expense. If the Government does not return approved samples that pass testing to the contractor, the Government will consider those samples as part of the contract quantity for payment and delivery.
(5) If samples fail testing, the Government may reject the entire contract lot from which the contractor took the samples. The Government may, at its discretion, retain samples that fail testing without obligation to the contractor.
H10 Awardee Requires No Access to DLA Controlled Technical Data or Information for Contract Performance (FEB 2020) Awardee has confirmed it will not require access to DLA controlled technical data or information for contract performance, and it will provide items that conform to the current revision of applicable technical data.
L04 Offers for Part Numbered Items (SEP 2016)
(a) For part numbered items, identified in the item description only by the name of an approved source (CAGE code), a part number, and a brief description.
Exact product – applies to contract line-item(s) (CLIN(s)): _____ CAGE code __________ part number ________ Alternate product – applies to CLIN(s): CAGE code __________ part number ________ Superseding part number – applies to CLIN(s): CAGE code __________ part number ________ Identify reason for superseding part number:
Administrative P/N change only: Yes____ No____ Minor change/No change in configuration: Yes____ No____ Previously-approved product – applies to CLIN(s): _____ Contract or Solicitation Number: ____________________ CAGE code __________ part number ________ Correction to CAGE/Part Number – applies to CLIN(s) _____ CAGE code in error/same corporation, different division Yes ___ No___ CAGE code in error/sold to different corporation Yes ___ No___ Part number not recognized Yes ___ No___ Obsolete part number Yes ___ No___ Other Yes ___ No___
(b) Exact product means a product described by the name of an approved source and its corresponding part number cited in the item description; and manufactured by, or under the direction of, that approved source. An offeror of an exact product must meet one of the descriptions below.
(1) An approved source offering its part number cited in the item description;
(2) A dealer/distributor offering the product of an approved source and part number cited in the item description;
(3) A manufacturer who produces the offered item under the direction of an approved source; and has authorization from that approved source to manufacture the item, identify it as that approved source’s name and part number, and sell the item directly to the Government.
(4) A dealer/distributor offering the product of a manufacturer that meets the description in subparagraph (3) above. (c) Alternate product.
(1) The offeror must indicate that an alternate product is being offered if the offeror is any one of the following:
(i) An offeror who manufactures the item for an approved source cited in the item description, but does not have authorization from the approved source to identify it as the approved source part number, and sell the item directly to the Government;
(ii) A dealer/distributor offering the product of a manufacturer that meets the description in (i) above;
(iii) An offeror of a reverse-engineered product that is not cited in the item description; or (iv) An offeror whose product does not meet the criteria of exact product, superseding product or previously approved product.
(2) An offer of an alternate product is an alternate offer.
(d) The offeror must indicate that a superseding part number is being offered if the offered item otherwise qualifies as an exact product, except that the part number cited in the item description has been superseded due to an administrative part number change with no change in configuration of the item. (e) The offeror must indicate that a previously-approved product is being offered if the product offered has previously been delivered to the Government or otherwise previously evaluated and approved.
(f) Correction to CAGE/Part Number Cited in the Item Description Submitted by offeror to notify the Government if there is a CAGE code error: same corporation/different division; sold to different corporation; part number not recognized; obsolete part number; other.
(g) Traceability documentation.
(1) The contracting officer may request evidence of the technical acceptability of the product offered. The evidence must be submitted within 2 days, or as otherwise specified, or the offer will not be considered.
(2) For offers of exact product, offerors other than the approved manufacturing source must retain evidence and provide the traceability evidence of the identity of the item and its manufacturing source when requested by the contracting officer.
(i) If offered item(s) are not in stock or not yet manufactured a copy of an original quotation from the approved source to the offeror identifying exact item cited in item description and a quantity sufficient to satisfy the solicitation requirement.
(ii) If offered item(s) are shipped or in stock, a copy of invoice on approved source's letterhead; or a copy of packing slip which accompanied shipment from approved source to offeror. The invoices and packing slips must identify exact item cited in item description and a quantity sufficient to satisfy the solicitation requirement.
(iii) If the offeror is an authorized dealer/distributor, or manufactures the item for an approved source, a copy of the contractual agreement with, or the express written authority of, the approved source to buy, stock, repackage, sell, or distribute the part.
The agreement must specifically identify the exact item, or otherwise ensure that the offeror is authorized by the approved source to manufacture or distribute the exact item being acquired. If the agreement covers a general product line or is otherwise not productspecific, the offeror must furnish additional documentation to address the exact item being acquired.
(iv) Other verifiable information.
(3) For superseding part number, the offeror may be requested to furnish evidence to establish that there are no changes in the configuration of the part.
(4) For previously approved products, upon request of the contracting officer, the offeror must furnish the contract, solicitation, source approval request (SAR) package, or letter of approval under which the product was previously furnished or approved. (h) Alternate offer data.
(1) The contracting officer may request drawings, specifications, or other data necessary to clearly describe the characteristics and features of an alternate offer. Data submitted shall cover design, materials, performance, function, interchangeability, inspection or testing criteria, and other characteristics of the offered product. The contracting officer may also request drawings and other data covering the design, materials, etc., of the exact product cited in the item description if the Agency does not possess data sufficient to evaluate the alternate product. The data must be submitted within 10 days, or as otherwise specified, or the offer will not be considered.
(2) If the alternate product is a reverse-engineered product, the offeror shall provide: technical documentation to establish that the offered item represents the exact item specified in the item description (i.e., invoice from an approved source or submission of samples having markings of an approved source); number of samples that were examined; the process/logic used; raw data (measurements, lab reports, test results) used to prepare drawings or specifications for the offered item; any additional evidence that indicates the reverse-engineered item will function properly in the end item; and any evidence that life cycle/reliability considerations have been analyzed.
(j) Evaluation of Alternate Offers.
If the solicitation does not provide for evaluation of alternate offers for the current procurement, the offeror may submit a request for evaluation of the alternate product’s technical acceptability for future procurements of the same item. The request for evaluation shall cite the national stock number (NSN) of the exact product and include the applicable level of technical data. The level of technical data that the Government has available for use to evaluate the acceptability of an alternate product offered, and the corresponding level of technical data that must be furnished with an offer of alternate product, will be identified in the item description and/or via correspondence with the appropriate location below.
(1) For solicitation numbers beginning with SPE7:
DLA Land and Maritime Directorate of Procurement Alternate Offer Monitor, BPP Post Office (P.O.) Box 3990 Columbus, Ohio 43218-3990
(2) For solicitation numbers beginning with SPE4:
DLA Aviation Office of the Competition Advocate Attention: BPC 8000 Jefferson Davis Highway Richmond, Virginia 23297-5100
(3) For solicitation numbers beginning with SPE1, SPE2, SPE3, SPE5, or SPE8:
DLA Troop Support Attention: (see note below)
700 Robbins Avenue Philadelphia, Pennsylvania 19111-5096
Note: The address (attention line) will change based on the 4th digit of the PIIN as follows: SPE1 = Clothing and Textile (C&T) SPE2 = Medical SPE3 = Subsistence SPE5 = Industrial Hardware (formerly Aviation or L&M detachments) SPE8 = Construction and Equipment (C&E)
(4) For solicitation numbers beginning with SPRRA1 and SPRRA2:
Defense Logistics Agency – DLA Aviation Office of the Competition Advocate Building 5201 Redstone Arsenal, Alabama 35898
(5) For solicitation numbers beginning with SPRPA1:
DLA Philadelphia Competition Advocate Office
700 Robbins Avenue Building 1 Philadelphia, Pennsylvania 19111-5098
(6) For Tank-Automotive and Armaments Command (TACOM) Depot Level Repairable (DLR) - DLA Land and Maritime solicitations beginning with SPRDL1:
Defense Logistics Agency DLR Procurement Operations - ZG 6501 East Eleven Mile Road Warren, Michigan 48397-5000
(7) For Communications-Electronics Command (CECOM) DLR-DLA Land and Maritime solicitations beginning with SPRBL1:
Defense Logistics Agency DLR Procurement Operations - ZL 6001 Combat Dr., Rm. C1-301
Aberdeen Proving Ground, MD 21005-1846 *****
L06 Agency Protests (DEC 2016) Interested parties may file an agency level protest with the contracting officer or may request an independent review by the chief of the contracting office (CCO). Independent review by the CCO is an alternative to consideration by the contracting officer and is not available as an appellate review of a contracting officer decision on a protest previously filed with the contracting officer. Absent a clear indication of the intent to file an agency level protest with the CCO for independent review, protests will be presumed to be protests to the contracting officer.
L08 Use of Supplier Performance Risk System (SPRS) in Past Performance Evaluations (JUN 2020)
(1) The Government will use the Supplier Performance Risk System (SPRS) (https://www.sprs.csd.disa.mil/) (formerly Past Performance Information Retrieval System – Statistical Reporting (PPIRS-SR)) to evaluate suppliers’ past performance.
(2) SPRS collects quality and delivery data on previously awarded contracts and orders from existing Department of Defense reporting systems to classify each supplier’s performance history by Federal supply class (FSC) and product or service code (PSC).
The SPRS application provides the contracting officer quantifiable past performance information regarding a supplier's quality and delivery performance for the FSC and PSC of the supplies the Government is purchasing.
(3) The contracting officer will use the quality and delivery classifications identified for a supplier in SPRS to evaluate a supplier’s past performance in conjunction with the supplier’s references (if requested). The Government will use this past performance information in accordance with the basis for award stated in the solicitation.
(4) SPRS generates classifications daily for each contractor. The SPRS Software User's Guide for
Awardees/Contractors (https://www.sprs.csd.disa.mil/pdf/SPRS_Awardee.pdf) and the SPRS Government User Guide (https://www.sprs.csd.disa.mil/pdf/SPRS_Government.pdf) provide instructions for accessing SPRS classifications. Contractors have access to SPRS for their own classifications only. Suppliers are encouraged to review their own classifications; the SPRS reporting procedures and classification methodology detailed in the SPRS Software User's Guide for Awardees/Contractors (https://www.sprs.csd.disa.mil/pdf/SPRS_Awardee.pdf); and the SPRS Evaluation Criteria (https://www.sprs.csd.disa.mil/pdf/SPRS_DataEvaluationCriteria.pdf). The SPRS Software User's Guide for Awardees/Contractors (https://www.sprs.csd.disa.mil/pdf/SPRS_Awardee.pdf) provides the method to challenge a rating generated by SPRS.
L31 Additive Manufacturing (JUN 2018)
(1) Additive manufacturing (AM) is a process of joining materials to make objects from three- dimensional (3D) model data, usually layer upon layer, as opposed to subtractive manufacturing methodologies, which remove material from areas where it is not desired, or other traditional manufacturing technologies, such as molding or stamping.
(2) Unless AM is specifically authorized in the solicitation/contract, quotes/offers may not include parts or supplies made using the additive manufacturing process. The Government will not evaluate offers that include an item or items produced using AM, and such offers are not eligible for award for the current procurement. A quoter/offeror proposing to supply an AM- produced item may submit a request to the contracting officer for approval of the item for evaluation by the Engineering Support Activity (ESA) for acceptability for future procurements of the same items.
(3) If an item produced using AM is presented to the Government for inspection and acceptance that was not authorized in the solicitation/contract, the Government may reject the item as nonconforming.
M05 Evaluation Factor for Unused Former Government Surplus Property (SEP 2016)
(1) All offers for unused former Government surplus property shall have a $200 evaluation factor.
(2) All offers for CSI require evaluation by the ESA(s). An evaluation factor of $600 shall be applied for coordination with each
ESA.
(3) If the contracting officer cannot determine acceptability and coordinates with the ESA(s) on other than CSI, an evaluation factor of $600 shall be applied for each ESA.
M06 Evaluation of Offers of Alternate Product for Part Numbered Items (SEP 2016) Offers of alternate product will not be evaluated for the contract action if:
(1) The solicitation is automated;
(2) It does not meet the dollar threshold for savings, after an evaluation factor of $600 is applied for coordination with each
ESA; or
(3) When the time proposed for award does not permit evaluation and delay of award would adversely affect the Government.
NNSY LOCAL CLAUSES
HAZARDOUS CHEMICAL EXPOSURE
Contractors are informed that their employees present on property under Norfolk Naval Shipyard cognizance may be exposed to hazardous chemicals as a result of shipyard operations. Information on the materials may be obtained from the Shipyard Safety and Health Office, Code 106.1, phone number (757) 396-3702 or 396-7912.
Ref. NAVSHIPYDNORINST PS100.56 VOL VI CHAPTER II PARA. 7-J(3)
Communications
(a) Except as specified in paragraph (b) below, no order, statement, or conduct of Government personnel who visit the Contractor's facilities or in any other manner communicate with Contractor personnel during the performance of this contract shall constitute a change under the "Changes" clause of this contract.
(b) The Contractor shall not comply with any order, direction or request of Government personnel unless it is issued in writing and signed by the Contracting Officer, or is pursuant to specific authority otherwise included as a part of this contract.
(c) The Contracting Officer is the only person authorized to approve changes in any of the requirements of this contract and notwithstanding provisions contained elsewhere in this contract, the said authority remains solely with the Contracting Officer. In the event the Contractor effects any change at the direction of any person other than the Contracting Officer, the change will be considered to have been made without authority and no adjustment will be made in the contract price to cover any increase in charges incurred as a result thereof
Requirements for Access to the Norfolk Naval Shipyard
1. Requests for Base Access
1.1. Defense Biometric Identification System (DBIDS):
1.1.1. Any new contractor, vendor or supplier requesting base access AFTER 31 May 2017 will be required to obtain a
DBIDS credential. NCACS credentials will no longer be issued.
1.1.2. Only DBIDS credentials will be issued to ALL contractors, vendors and suppliers seeking base access AFTER 14
August 2017.
1.1.3. Defense Biometric Identification System (DBIDS) increases installation security and communications by receiving frequent database updates on changes to personnel/credential status, law enforcement warrants, lost/stolen cards, and force protection conditions. The system provides a continuous vetting anytime the DBIDS card is scanned at an installation entry point.
1.2. NCACS Card Holders
1.2.1. If you currently have a Navy Commercial Access Control System (NCACS) card, the following is required to get a
DBIDS credential:
1.2.1.1. Present your NCACS Card and a completed copy of the SECNAV FORM 5512/1 to the base Visitor Control
Center representative.
1.2.1.2. The VCC will pull up your information in the computer, ensuring all information is current and correct.
1.2.1.3. Once your information is validated, a temporary DBIDS credential is provided.
1.2.1.4. Your temporary credential will have an expiration date, prior to which you will need to obtain your permanent
DBIDS credential (~ 90 days).
1.2.1.5. For each additional U.S. Navy installation to which you need access, the first time you visit you only need to bring your DBIDS credential and statement of purpose for base access when arriving at the Visitor Control Center.
1.2.1.6. The representative will enter base access authorization and then you may proceed to work.
1.3. Non-NCACS Card Holders
1.3.1. If you do NOT have an NCACS Card, the following is required to obtain a DBIDS credential:
1.3.1.1. Present a letter or official document from my government sponsoring organization that provides the purpose for your access.
1.3.1.2. Present valid identification, such as a passport or Real ID Act-compliant state driver's license.
1.3.1.3. Present a completed copy of the SECNAV 5512/1 form to obtain your background check.
1.3.1.4. Upon completion of the background check, the Visitor Control Center representative will complete the DBIDS enrollment process, which includes your photo, finger prints, base restrictions, and several other assessments;
after all this is done, you will be provided with your new DBIDS credential.
1.3.1.5. You may now proceed to work.
1.4. Non-Participants
1.4.1. One-Day Passes: Participation in the DBIDS is not mandatory, and if the Contractor chooses to not participate, the
Contractor's personnel will have to obtain daily passes, be subject to daily mandatory vehicle inspection, and will have limited access to the installation. The Government will not be responsible for any cost or lost time associated with obtaining daily passes or added vehicle inspections incurred by non-participants in the DBIDS.
1.5. FOR ADDITIONAL QUESTIONS ABOUT OBTAINING A DBIDS CARD, CONTACT YOUR LOCAL BASE VISITOR CONTROL CENTER. INFORMATION IS ALSO PROVIDED AT: www.cnic.navy.mil/om/dbids.html
(a) By acceptance of this contract/order and delivery of supplies under this contract/order, the Contractor is verifying that the supplies do not contain metallic mercury or mercury compounds and are free from mercury contamination.
Note: Materials which may contain mercury as a trace impurity are not subject to the provisions of this clause.
(b) Any test conducted by the Contractor will be at his expense. However, no test data need be submitted unless specifically requested. If the inclusion of metallic mercury or mercury compounds is required as a functional part of the material furnished under this contract/order, the Contractor shall obtain written approval from Norfolk Naval Shipyard before proceeding with manufacture.
The Contractor’s request shall explain in detail the requirements for mercury; identify specifically the parts to contain mercury; and explain the method of protection against mercury escape. Upon approval by Norfolk Naval Shipyard, the Contractor will provide a “warning plate” as prescribed by Norfolk Naval Shipyard which will include a statement that mercury is a functional part of the item and will include name and location of that part.
(c) Functional mercury is mercury or mercury compound required for proper operation of supplies, or if not present would cause supplies to malfunction. The requirements of this clause shall be included in all subcontracts hereunder. Technical questions pertaining to the requirements of this clause shall be referred to the Contracting Officer via the government inspector or representative.
(d) If this contract/order calls for work to be performed by the Contractor in a submarine or in the engineering spaces of a nuclear powered surface ship, the contractor, shall not bring into or utilize in the submarine or in the engineering spaces of nuclear powered surface ships any equipment, instrument, or device that has not been approved by the purchase officer.
(end of text)
(a) OFFERORS SHALL IDENTIFY PRODUCT(S) QUOTED AS FOLLOWS: (mark with an “X” if applicable)
____________ (1) Quoting manufacturer/brand name and product/part number exactly as specified.
____________ (2) Identify Manufacturer ____________________________________
____________ (3) Quoting alternate material as follows:
ITEM NBR. MANUFACTURER/BRAND NAME PRODUCT/PART NBR.
____________ (4) Material not as specified. The following exceptions are taken to specification or purchase description:
(b) If offeror has marked (3) or (4) above, he/she shall submit adequate descriptive literature with the offer/ quotation to enable NNSY Personnel to technically evaluate the material offered.
http://www.cnic.navy.mil/om/dbids.html
(a) The offeror’s past performance shall be evaluated in accordance with FAR 13.106-2 or 15.305(a)(2), as applicable. This procurement is subject to Past Performance Information Retrieval System – Statistical Reporting (PPIRS-SR), authorized by the Department of Defense for use by participating activities during the acquisition of supplies and services.
(b) The purpose of the PPIRS-SR is to provide contracting personnel with quantifiable past performance information regarding delivery and quality, as collected from existing DoD reporting systems. PPIRS-SR uses the past performance data collected to classify each supplier’s performance by Federal Supply Class(es) or Service Code(s).
(c) Quality: The method used in PPIRS-SR to classify the quality of a supplier’s past performance is a comparison of quality records among all suppliers who have provided goods or services to the Federal Government which are categorized in the same Federal Supply Class or Service Class (FSC). Based on the comparison among suppliers in a specific FSC group, suppliers are classified by PPIRS-SR into a color rating that represents the supplier’s overall quality performance for that specific Federal Supply Class or Service Class. The following is a summarization of the PPIRS-SR classification colors:
(1) Dark Blue: Top 5% of suppliers in FSC group*
(2) Purple: Next 10% of suppliers in FSC group*
(3) Green: Next 70% of suppliers in FSC group*
(4) Yellow: Next 10% of suppliers in FSC group*
(5) Red: Bottom 5% of suppliers in FSC group*
* If all supplier performance ratings for an entire FSC group are equal, all suppliers in that group will be classified Green.
(d) Delivery: Supplier delivery past performance is classified in PPIRS-SR by the supplier’s percentage of on time deliveries. On time deliveries are calculated using the number of line items delivered and a weighting factor which reflects the length of time a delivery was overdue. (e) PPIRS-SR classifications are established monthly for each supplier and can be reviewed at http://www.ppirs.gov/.
Suppliers are granted access to PPIRS-SR for their own classifications. Offerors are encouraged to review their own classifications as well as the PPIRS-SR reporting procedures and methodology detailed in the PPIRS-SR Procedures Manual and the PPIRS-SR User Guide available at http://www.ppirs.gov. The method to challenge a rating is also found on the identified website.
(f) Suppliers with no history in PPIRS-SR will be considered to have a neutral PPIRS-SR rating.
PALLETIZATION AND SHIPPING INSTRUCTIONS
PALLET REQUIREMENT
Contractors (drivers) delivering material to the Norfolk Naval Shipyard must come with two forms of Identification, one being a driver license or picture ID card issued by a State. The other form required is a SSN card, birth certificate issued by a state, Native American document or US citizen card. Driver(s) will not be escorted unless they have to go into the CIA.
All items/boxes over 40 lbs under this solicitation and/or contract is required to be palletized. Delivery will not be accepted to any material that IS NOT palletized. The shipment will not be offloaded and will be returned.
Material sourced or otherwise procured from NUFLO, Inc. (Cage Code: 3BZG7) and/or Synergy Flow Systems (Cage Code: 4GP29) are prohibited to be offered, sold, exchanged, or delivered to Norfolk Naval Shipyard.
Contract Number MUST be noticeable on the outside of the package and on the packing documents. All shipments must have the Contact Number or the Lead JML number labeled on the outside of all boxes. If not labeled the Warehouse may at the time of delivery turn the material away at the company's cost for not being able to identify the material.
SHIPPING LABEL INSTRUCTIONS
All shipments must have a label on the outside of each box, clearly providing the following information, in addition to packing slips inside the box:
Lead Document Number: N42158 3026-5750 Contract or Purchasing Number: SPMYM3-23-P-XXXX Government Purchasing Agent’s Name and Phone Number: BUYER’S NAME and PHONE
NUMBER
If a label cannot be generated, the info must be clearly marked on the outside of each container.
Address all questions or concerns regarding the labeling or shipping documents with the government purchasing agent before confirming acceptance of the order.
| C01 Superseded Part Numbered Items (SEP 2016) |
| L04 Offers for Part Numbered Items (SEP 2016) |
| M06 Evaluation of Offers of Alternate Product for Part Numbered Items (SEP 2016) |
File details come from the government source that posted it. Updated .