21Q0060 Released.pdf
PDF 614 KB Posted
- Attached to
- Welders and Accessories Federal contract opportunity
- Solicitation number
- W911KF-21-Q-0060
About this file
This solicitation requests welding power supplies, wire feeders, welding guns, carts, and accessories. The Army Materiel Command Contracting Command Detroit Arsenal is seeking these items for various cost centers at Anniston Army Depot in Alabama.
Ninety-three welding power supplies, fifty-nine wire feeders, forty-one welding guns, sixty-six carts, and various drive rolls, guides, kits, and other accessories are required. All items must meet specific performance and capability requirements outlined in the statement of work. Delivery is to Building 212 at Anniston Army Depot.
The solicitation includes terms for acceptance, warranty service, equipment location and delivery hours. Questions are due by July 25, 2021 and the offer due date is August 15, 2021. The acquisition is set aside for small business and identifies NAICS codes and business size standards.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 21-Q-0060 Amendment 02.pdf | ||
| 21Q0060 Amendment 01.pdf | ||
| Attachment 1_Evidence of Authority To Sign Offers.pdf | ||
| Attachment 2_DD Form 1423 - CDRL (Welding Procurement).pdf | ||
| Attachment 4_Request for Technical Literature.docx | DOCX document | |
| Attachment 5_Past Performance Questionnaire.doc | DOC document | |
| Attachment 3_DD Form 1664 (Welding Procurement).pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W911KF21Q0060 15-Jul-2021
b. TELEPHONE NUMBER
256 235-6231
8. OFFER DUE DATE/LOCAL TIME
10:00 AM 15 Aug 2021
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W911KF9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
AMBER E. BURDETT
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
SEE SCHEDULE
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESSX
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
ACC-ANAD
AMBER E. BURDETT
7 FRANKFORD AVE
ANNISTON AL 36201
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE W31G1Y 16. ADMINISTERED BY
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
ANNISTON ARMY DEPOT (DPE)
7 FRANKFORD AVENUE BLDG 31
ANNISTON AL 36201
TEL: 256-235-6084 FAX:
256-235-6535FAX:
TEL: 256-240-3002 SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
1,250
NAICS:
333992
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF66
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
W911KF21Q0060
Section SF 1449 - CONTINUATION SHEET
LOCAL NARRATIVES
Local Narratives
Narrative 1: ATTACHMENTS.
The following documents are incorporated as a part of this solicitation:
1. Evidence of Authority
2. DD1423 – Equipment Manuals
3. DD1664 – Equipment Manuals
4. Request for Technical Literature
5. Past Performance Questionnaire
Narrative 2: ADDENDUM TO FAR CLAUSE 52.212-1 INSTRUCTIONS TO OFFERORS –
COMMERCIAL ITEMS (DEVIATION 2018-O0018) (OCT 2018).
The offeror agrees to hold the prices in its offer firm for 90 calendar days from the date specified for receipt of offers
Narrative 3: ELECTRONIC SUBMISSION OF OFFERORS.
All responses to this solicitation must be submitted in digitized/electronic format. Paper copy responses will not be accepted. All solicitation responses must be submitted by email to: amber.e.burdett.civ@mail.mil.
Offers submitted using any other means will not be accepted, unless stated otherwise in the solicitation.
Beta.SAM provides industry with a single point of access to all U.S. Army contracting opportunities. The Contracting Opportunities Search feature allows vendors to easily locate opportunities. Vendors must be registered before being able to respond to a solicitation. Before registering, a Data Universal Numbering System (DUNS) Number is required and registration in the SAMS System (www.sam.gov) is required. Offeror must insure its offer, in its entirety, reaches the Army Contracting Command-Warren, Anniston Army Depot (ANAD), before the time set for opening or closing of the solicitation.
Any clauses or provisions of this solicitation which mention writing, returning, or submission of offer will mean electronic submission as stated in the paragraph above.
Electronic offers must identify the solicitation and the opening/closing date, and include, as a minimum, the following:
a. The SF1449 filled out and signed.
b. All applicable fill-in provisions from the solicitation must be completed.
c. Any other information required by the solicitation.
It is your responsibility to furnish all information requested. We will not confirm information by telephone. If you do not fully respond (such as price, delivery date) to the Request for Quotation, you will be determined non-responsive.
If you choose to password-protect access to your offer, you must provide the password to ANAD before the opening or closing date. Contact the buyer identified on the cover page of this solicitation to arrange a means of providing the password. Passwords used only for the purpose of write protecting files need not be provided.
Offerors shall make every effort to ensure that their offer is virus-free. Offers (or portions thereof) submitted which DO reflect the presence of a virus, or which are otherwise rendered unreadable by damage in either physical or electronic transit, shall be treated as “unreadable.” See Federal Acquisition Regulation 14.406 or 15.207(c) for a description of the steps the Government shall take with regard to unreadable offers.
Any bid bond required by this solicitation must be submitted with the offer. Also, the properly completed original bid bond must be furnished to the Army Contracting Command-Warren, Anniston Army Depot (ANAD), 7 Frankford Ave, Anniston, AL 36201-4199, prior to the opening or closing of the solicitation.
Narrative 4: SYSTEM FOR AWARD MANAGEMENT (SAM).
Contractors must be registered in the System for Award Management (SAM) database before an award will be issued and shall complete the electronic annual representations and certifications within SAM. After award, companies must ensure that their SAM registration remains valid and current to avoid problems with invoicing and payment. For SAM access and navigation issues, follow the instructions provided at “User Guides and Helpful Hints” on SAM Home page.
Narrative 5: PAYMENT.
Contractor must accept provide their electronic funds transfer address. Contractors must be registered in the System for Award Management (SAM) database before an award will be issued. Companies should verify their SAM registration to ensure it is valid and current. COMPLETE THE FOLLOWING INFORMATION AND
INCLUDE WITH ANY OFFER.
EFT address: _____________________________
Federal Tax Identification Number: _____________________ Dun & Bradstreet Number (DUNS): _____________________ CAGE Code: _____________________ System for Award Management (SAM) Registration: Yes____ No____ Expiration Date:______ Vendor Contact Information: POC: __________________________ Telephone: _____________________
FAX: __________________________
Email: _________________________
Narrative 6: WAWF PROCEDURES.
Your order WILL BE PAID BY DFAS (not by credit card) and contains DFARS Clause 252.232-7003, Electronic Submission of Payment Requests, you must submit your invoice through Wide Area Workflow (WAWF). This clause requires invoices for supplies and services purchased by the DoD be submitted via electronic means. The Wide Area Workflow system satisfies this mandatory requirement. WAWF can be accessed on the internet at https://wawf.eb.mil/
Ensure the Electronic Business POCs listed in the System for Award Management (SAM) for your company are the same individuals that will submit invoices through WAWF before using WAWF. SAM is accessible at www.sam.gov. For SAM access and navigation issues, follow the instructions provided at “User Guides and Helpful Hints” on SAM Home page.
If your Electronic Business (EB) POCs are correct, contact the WAWF helpdesk at 1-866-618- 5988 or by e-mail at cscassig@ogden.disa.mil and ask them to establish a group for your CAGE code. The group administrator will also have to call the WAWF helpdesk to request account activation. Once the group is established and the account is activated, you will be able to create a Combination Invoice/Receiving report (SUPPLIES/MATERIALS) or a 2 in 1 Invoice (SERVICES/EQUIPMENT) using the codes below and instructions available from our contract administrator/buyer.
Questions concerning payment should be directed to the responsible Defense Finance Accounting Services (DFAS). Please have the order number and invoice number ready when calling about payment status.
The accounts payable mailing address can be located in Block 18a of your order. You can easily access payment information using the DFAS web site at http://www.dfas.mil. Your purchase order/contract number or invoice will be required to inquire status of your payment. Go to DFAS on the web at: www/dfas.mil/money/vendor. THE
FOLLOWING CODES WILL BE REQUIRED TO ROUTE YOUR INVOICES AND ADDITIONAL EMAILS
CORRECTLY THROUGH WAWF:
WAWF
Data/CODES needed for
Invoice
SUPPLIES/
MATERIALS
(PRs that start with W31G1Y)
SERVICES/
EQUIPMENT
SUPPLIES/
MATERIALS
(PRs DO NOT that start with W31G1Y)
CONSTRUCTION
CAGE CODE
SAM Cage code listed in
Contractor/ Offeror field of contract
SAM Cage code listed in
Contractor/ Offeror field of contract
SAM Cage code listed in Contractor/
Offeror field of contract
SAM Cage code listed in Contractor/Offeror field of contract
ISSUE/ADMIN BY
DODAAC
W911KF W911KF W911KF W911KF
INSPECT BY
DODAAC (If needed)
W31G1Y (Must have inspector code)
W911KF
W911KF
(Unless Inspected by DCMA)
W911KF
SHIP TO
(Supplies/Material s Only)
W911KF NOT AVAILABLE W911KF W911KF
ACCEPTOR
(Services/Equipment Only)
NOT AVAILABLE W911KF NOT AVAILABLE NOT AVAILABLE
Type of Invoice COMBO 2 IN 1 COMBO CONSTRUCTION
Pay DODAAC HQ0303 HQ0303 HQ0303 HQ0303
CONTRACT NUMBER:
DELIVERY ORDER NUMBER (IF APPLICABLE):
EMAIL POINT OF CONTACT LISTING: (Please insert following email addresses for additional email distribution)
CONTRACT:
ADMINISTRATOR: Amber Burdett, amber.e.burdett.civ@mail.mil
CONTRACTING OFFICER: T. Morey Gaddy,troy.m.gaddy2.civ@mail.mil
USER AND/OR INSPECTOR:
Narrative 7: TECHNICAL LITERATURE--SUPPORTIVE DOCUMENTATION
(a) Technical literature must be furnished with the proposal. The literature must be identified to show the item in the offer to which it pertains. The technical literature is required to establish, for the purposes of proposal evaluation and award, details of the products the offeror proposes to furnish.
Technical literature on the items proposed must explain in detail the functional capabilities, logical operation, exact speed and capacities, limits, configuration rules, features, and interfaces.
(b) Failure of the technical literature to show that the products offered conform to the specifications and other requirements of this Request for Proposal may cause rejection of the offer.
Narrative 8: AUTOMATED INSTALLATION ENTRY (AIE) BADGE.
Contractors accessing Anniston Army Depot will be required to obtain an AIE badge. To do so, contractors must submit a completed SIOAN 380-2 (sent to contractor at time of award) to the Contract Specialist with all required signatures to the badge office. A background check will be completed and approved/disapproved within 7-10 days.
Once approved, the contractor can schedule an appointment for an AIE badge to be issued.
Narrative 9: DISCLOSURE OF UNIT PRICE INFORMATION.
This constitutes notification pursuant to Executive Order 12600, Pre-Disclosure Notification Procedures for Confidential Commercial Information (June 23, 1987), of our intention to release unit prices in response to any request under the Freedom of Information Act, 5 USC 552. Unit price is defined as the contract price per unit or item purchased. We consider any objection to be waived unless the contracting officer is notified of your objection to such posting prior to submission of initial proposals.
Narrative 10: TIME OF DELIVERY.
Please provide the time of delivery in calendar days: _____________.
Narrative 11: It is the Government’s intent to award ONLY one contract from this solicitation.
Narrative 12: PAST PERFORMANCE PROPOSAL AND EVALUATION INFORMATION.
The government will conduct a performance risk assessment and the assessment will be used to assist in determining responsibility in accordance with (IAW) FAR 9.104.1 based upon the past performance of offerors and proposed subcontractors as it relates to probability of successfully performing the solicitation requirements. Offeror shall submit completed past performance questionnaires (Attachment No. 2 Past Performance Questionnaire) for
RELEVANT PAST PERFORMANCE ON THREE (3) CONTRACTS performed within the past three (3) years prior to closing of this solicitation. For services, contractor shall have performed under each contract for a minimum of one (1) year within the past three (3) years. Each contract cited may be ongoing or complete provided it meets the one year performance criteria. For equipment or supplies, contractor shall have completed each contract within the past three (3) years. If offeror proposes use of major subcontractor(s) in performance of resultant contract, provide a description of the work to be performed (supplies or services) by each major subcontractor and the information specified above for each subcontractor identified as relevant to the work to be performed by the subcontractor. A significant or major subcontractor is that subcontractor expected to provide over 20 percent of the work effort or critical hardware, software, or services.
"Relevant past performance" is defined as performance similar in nature and in scope to work required by this acquisition. The government will screen contract information provided by offeror and will remove from consideration those contract references that are clearly unrelated to the type of effort sought. The government will consider this information in its evaluation of performance risk for offeror and proposed the government will make a reasonable effort to consider information on the contracts cited for offeror and for each major subcontractor.
a. The government reserves the right to evaluate fewer than three (3) contracts for any contractor should we be unsuccessful in obtaining required information from sources cited. In that case, contractor (or subcontractor) will be evaluated on the information available.
b. Should the government receive information on more than three (3) contracts, selection of those to be considered in evaluation will be based on the criteria stated previously. The government reserves the right to consider information from other sources in its evaluation.
c. The Government may utilize Federal awardee Performance and Integrity Information System (FAPIIS) and System for Award Management (SAM) to determine responsibility.
Narrative 13: COVID-19
COVID-19 is an infectious disease that has caused sickness and death around the world and in the United States of America. This disease is in the form of a virus and is primarily spread by person-to person transmission. This narrative mandates actions to reduce the risk of spreading this virus.
Contract employees must comply with Federal (Center for Disease Control (CDC)) and State (Alabama Department of Public Health (ADPH)) guidelines related to, but not limited to, protective measure, reporting for duty, quarantine, and returning to work.
Social distancing and covering the face, specifically, the mouth and nose to prevent the spread of viral aerosols, are avenues to limit the spread of the virus. In order to mitigate the spread of COVID-19 and to protect all personnel, ANAD has directed that all contractor personnel comply with the practices that have been recommended by the CDC, including, but not limited to washing your hands, not touching your face, and social distancing.
Personnel who are at least two weeks beyond a completed series of vaccine are no longer required to wear a mask or face coverings on depot. Personnel who are not fully vaccinated should continue to follow applicable DoD mask guidance.
If a contract employee is infected by COVID-19 and has performed work or delivered supplies to ANAD, the contractor shall notify the Contracting Officer immediately. Infected contractor employees may not return to ANAD until they are cleared to return to work by medical personnel in accordance with (IAW) ANAD COVID-19 Pandemic policy regarding the return to work of infected individuals.
Contractors must continue to remain informed and comply with all current and future Commander directives and policies related to COVID-19 to ensure the safest, effective, and efficient workforce conditions.
LOCAL RULES AND REGULATIONS
(a) Identification Badges and Vehicle Decals: The following requirements apply to all contractors working inside the Controlled Area of Anniston Army Depot.
(1) Contractors are required to secure, and wear at all times, employee identification badges for all employees who must enter the Anniston Army Depot (ANAD) to engage in contract work. Badges must be secured before an employee will be allowed entry onto the depot. Contractors that are non-US citizens must be escorted by depot personnel with the proper security clearance. Emergency badges will be issued on a case-by-case basis. Vehicle decals must be obtained for all Contractor vehicles entering ANAD. These badges and decals may be obtained from the Badge and Vehicle Registration Office (BVRO), Building 367, located at the main entrance to ANAD. No charge is made for badges if they are returned. Contractors will be charged twenty-five dollars ($25.00) for each badge issued to replace lost badges or badges damaged through carelessness, negligence, or misuse. All persons to be badged shall present a PHOTO identification from one of the following sources:
a. - State driver's license
b. - State identification card
c. - Federal, municipal, or school identification card bearing a seal and the following information: photo, name, social security number, date of birth, and physical description
NOTE: A social security card is not a photo identification and will not be accepted as proper identification.
Employee identification cards issued by the Contractor will not be accepted. The Directorate of Emergency Services (DES) will reject any identification presented which is altered, not issued by one of the above identified agencies, or otherwise questioned regarding validity.
(2) Contractors shall submit the name of a point of contact responsible for security requirements through the Contracting Officer to the Installation Security Management Office upon notification of contract award.
(3) Ten working days prior to the date Contractor employee will begin work in the controlled area of ANAD (within the gates), a Personal Data Questionnaire/Privacy Act Statement (SIOAN Form 380-2) must be completed and signed for each employee. The form authorizes ANAD to conduct a local background check for any criminal record or questionable reliability. No contractors or employees will be issued a badge without a favorable local background check. SIOAN Forms 380-2 may only be submitted for persons who are current employees of the Contractor or who hold a letter of intent to hire issued by the Contractor. Forms will be submitted to the Badge and Vehicle Registration Office (BVRO), Building 367, located at the main entrance to ANAD. NO PRE-
EMPLOYMENT LOCAL BACKGROUND CHECKS WILL BE CONDUCTED BY ANNISTON ARMY DEPOT.
The prime contractor is responsible for checking with the Badge and Vehicle Registration Office (BVRO), Building 367, phone number 256 235-6820, to ensure that employees have been cleared for entrance to ANAD.
(4) Also, at least ten working days before the Contractor expects to begin work on the installation, prime Contractor shall submit, on company letterhead, the name, social security number, date/place of birth, and citizenship of all persons entering ANAD to perform contract work for the prime and any subcontractors. Letter shall be submitted through the Contracting Officer to the Badge and Vehicle Registration Office (BVRO).
(5) Violation of any security or safety requirements will be grounds for immediate suspension of the individual's badge. DES will notify the Contracting Officer when suspension actions are taken. The Contractor can appeal the suspension to DES, who is the final adjudication authority of the individual's reinstatement or revocation of badge privileges.
(b) Hours of Work:
WORK
HOURS
RECEIVING HOURS DAY(S) OF WEEK
7:00 AM – 4:30 PM
7:00 AM – 12:00 PM
MONDAY - THURSDAY
12:40 PM – 3:30 PM
7:00 AM – 3:30 PM
7:00 AM – 12:00 PM
FRIDAY
12:40 PM – 2:30 PM
CLOSED CLOSED
SATURDAY | SUNDAY |
FEDERAL HOLIDAYS (*)
(1) Federal Holidays. Federal holidays may cause the Depot to be closed for one or more of the work days identified. The contract performance period has taken this possibility into consideration.
(2) Shutdown Periods. The Government may choose to shutdown for a week or portions of a week as stated below. During this shutdown, and unless otherwise stated, only those Government personnel essential for equipment/facility maintenance will be permitted work.
4th of July Holiday Safety Stand-Down Day* Christmas Holiday Employee Appreciation Day*
*Safety Stand-Down Day and Employee Appreciation Day generally occur on a Friday (8-hour day). Safety Stand- Down Day consists of either two half-days occurring at six-month intervals or one full workday per year. Employee Appreciation Day generally occurs on a Friday (half of an 8-hour day) and is usually held in the afternoon. The Contractor’s services may not be required during these periods. In such cases, the Contractor will be notified in writing by the Government. These interruptions will be at no cost to the Government.
(3) Schedule Changes. When situations warrant, the Government may change the hours of operation to adjust for certain conditions, i.e., weather conditions (extreme heat or cold). For example, during summer production, shops may begin work at 6:00 am and leave work at 3:30 pm to avoid the afternoon heat. The Contractor shall be provided as much advance written notice as possible when these situations occur and will be expected to support any schedule change provided by the Contracting Officer.
(c) Traffic: The Contractor will be required to conform to Depot regulations concerning:
(1) Designated routes
(2) Parking regulations
(3) Insurance--See clause entitled "Insurance Requirements." The Contractor will also insure that all POVs brought on the installation are fully insured for minimum amount of personal injury and personal damage liability required by Federal Acquisition Regulation 28.307-2.
(d) Highway Barricades, Warning Signs, and Parking: The Contractor shall comply with Depot Regulation ANADR 190-5 and Manual on Uniform Traffic Control Devices, ANSI D6.1, Part VI, Latest Edition. Contractors are permitted to drive their vehicles inside buildings to load and unload supplies and equipment. However, when finished loading and unloading, the Contractor should move the vehicle outside to a designated parking space.
(e) Temporary Structures: The Contractor shall comply with Corps of Engineers Manual (EM) 385-1-1.
(f) Fire Prevention and Protection: The Contractor shall comply with all fire prevention measures prescribed in the installation fire prevention and protection regulation, a copy of which is on file in the office of the Contracting Officer. A written hot work permit shall be obtained from the installation fire department for use of any heat producing devices such as blowtorches, portable furnaces, tar kettles, or gas and electric welding and cutting equipment. The Contractor shall be liable for any fire loss to Government property attributable to negligence on the part of the Contractor, including failure to comply with fire prevention measures prescribed by the terms of this contract.
(h) Utilities: Government-owned and operated utilities are adequate for the needs and use of the Contractor as well as the Government. All reasonably required amounts of water and electricity are available to the Contractor without charge.
(i) Vehicle Searches: All vehicles entering, moving throughout, and exiting ANAD are subject to random searches as directed by the Depot Commander.
(j) Land Use Control: Contractors who will be required to “disturb soil” in the performance of this contract shall review shall request a dig permit that will identify, at a minimum, the purpose and nature of the excavation, the type of equipment to be used, the duration of the activity, and the points of contact. A copy of the approved dig permit will be required to be onsite at all times during the excavation. This is in accordance with the Standard Operating Procedure for Land Use Control Implementation. The SOP is available in the Directorate of Risk Management, Building 199, for review by Contractors.
(k) Use of any cellular telephone camera is prohibited on this installation. If a cellular telephone is illegally used on this installation, that cellular telephone is subject to confiscation, and any violation may be punishable by fine or imprisonment or both. Use of cameras without ANAD-issued permit is strictly prohibited. Non-permitted cameras are subject to confiscation.
(l) Air Emissions: The contractor is responsible for early coordination with the Directorate of Risk Management on any action that might result in air emissions (dust, volatile substances, etc.). ANAD's Title V Air Permit requires the installation to obtain construction permits for new or modified air sources. The Alabama Department of Environmental Management (ADEM) must issue a construction permit before ANAD purchases and installs any equipment which will produce air emissions. Installation and/or start-up of this equipment without the proper permit and coordination with ADEM is a violation of State and federal environmental law. The violation could result in a possible civil penalty or fine of $32,500 per day per violation from the Federal Environmental Protection Agency.
Contractors considering a new process or device, or a modification to an existing unit, must first coordinate with the Environmental Compliance and Restoration Division, Directorate of Risk Management.
(m) ENVIRONMENTAL MANAGEMENT SYSTEM, ISO 14001:2015: The contractor and its subcontractors shall conform to Anniston Army Depot's Environmental Management System (EMS) including all policies and procedures required by the EMS. All activities conducted within the installation are subject to the EMS and any plans, goals, objectives, targets, etc. established through the EMS. It is the contractor's responsibility to ensure that any work performed under this contract is accomplished in accordance with the Anniston Army Depot's Environmental Policy (Commander's Policy #19). All contractors associated with the project must have a briefing annually on EMS and environmental policies on Anniston Army Depot. This briefing is to take place prior to or during the first day of work on this project. The scheduling of this briefing and information about the EMS program can be obtained from the Directorate of Risk Management by calling (256) 235-7746.
(n) Compliance with Environmental Laws and Regulations: Contractor shall comply with all applicable federal, state, and local environmental laws, statutes, regulations, executive orders, permits, Army regulations (with supplements), as well as Major Subordinate Command (MSC) and installation regulation, policy, Host Tenant Agreement, Interagency Service Support Agreement, or Status-of-Forces Agreement. Contractor shall immediately report any conflicts between applicable federal, state, local environmental laws, statutes, executive orders, and provisions of Army Regulation 200-1, and any specifications within this contract.
The contractor or subcontractors shall be responsible for stopping work (or stopping the work of subcontractors) and reporting any operation or condition on ANAD that could adversely affect the environment or the health and safety of employees or the public. In such situations, the contractor should immediately advise the COR or an appropriate authority. Emergencies should be reported by dialing "911" from any Anniston Army Depot base telephone.
(o) Safety and Accident Prevention: SAFETY AND HEALTH REQUIREMENTS:
Contractors shall adhere to all safety rules and regulation of corrective actions, which will be taken into consideration:
General:
Applicable Publication: The publications listed below form a part of this specification to extent referenced. The publications are referred to in the text by basic designation only.
Code of Federal Regulation (CFR): OSHA General Industry Safety and Health Standards (29 CFR 1910), Publication V2206; OSHA Construction Industry Standards (29 CFR 1926). One source of these regulations is OSHA Publication 2207, which includes a combination of both parts 1910 and 1926 as they relate to construction safety and health. It is for sale by the Superintendent of Documents, U.S. Government Printing Office, Washington, DC 20402. National Emission Standards for Hazardous Air Pollutants (40 CFR, Part 61).
Title 29 of the Code of Federal Regulations, Subtitle B, Part 1926 provides the safety and health regulations for construction. Under the general provisions, it gives each contractor responsibility to “…initiate and maintain such programs as may be necessary to comply with this part (29CFR1926).” The general company safety plan should address the how the company will comply with the basic requirements of the standard.
For 29 CFR 1926 and other OSHA standards and interpretations plus other resources are available from the Occupational Safety and Health web site, www.osha.gov.
In addition to contract clause entitled "ACCIDENT PREVENTION," FAR 52.236-13, the contractor shall comply with all regulations, publications and manuals current at the time the Task Order is being performed to include but are not limited to Army Material Command (AMC) Regulation 385-100, Safety and Occupational Health Regulation ANADR 385-1, Engineering Manual (EM) 385-1-1, 29 Code of Federal Regulations (CFR) 1926/1910, other related Department of Transportation (DOT) Regulations (49 CFR), Federal Standard (Fed Std): 313A Material Safety Data Sheets, ANSI BHMA A156, National Electric Safety Code ANSI C2, NFPA Codes and Standards, National Electric Code Handbook, UFGS (Unified Facilities Guide Specification) and all local policies.
Definition of Hazardous Materials: Refer to hazardous and toxic materials/substances included in Subparts H and Z of 29 CFR 1910 and to others as additionally defined in Fed. Std 313. Those most commonly encountered include asbestos, polychlorinated biphenyl’s (PCB’s) explosives and radioactive material, but may include others. The most likely products to contain asbestos are sprayed-on fireproofing, insulation, boiler lagging and pipe covering.
Engineering Manual 385-1-1 outlines safety requirements for construction. A copy of it is available for review in the Anniston Army Depot safety office, or from the Army Corp of Engineers web site, www.usace.mil/publications.
The Contractor shall assume full responsibility and liability for compliance with all applicable regulations pertaining to the health and safety of personnel during the execution of work, and shall hold the Government harmless for any action on his/her part or that of his/her employees or subcontractors, which results in illness, injury, or death.
Contractors prior year OSHA logs (form 300A) and a site specific safety plan for work to be performed on Anniston Army Depot must be provided for approval by the Anniston Army Depot Safety Office no more than 10 days after award of contract. Contractor shall maintain an accurate record of accidents resulting in traumatic injury or death and accidents resulting in damage to Government property, supplies, and equipment. The Contractor shall report incidents causing disruption of contract services, or any accidents in connection with performance of this contract, to the Contracting Officer Representative within two (2) hours of occurrence. Contractor will notify ANAD Safety Office immediately of Reports of Inspections and/or Notices of Violation or other enforcement actions (including warning letters) received from/by local, State, and Federal Regulators in which the violation or alleged violation is attributed to the action of the contractor or its subcontractors. Contractor will provide ANAD with a copy of the Inspection Report, Notice of Violation or other enforcement action, and all supporting documentation.
Contractor shall safeguard and maintain all Government property, as well as, provide for the safety and well-being of personnel employed in the administration of this contract. Local PPE requirements are at minimum long pants, long sleeved shirts, protective footwear, protective eyewear and hearing protection shall be used and provided by contractor.
The Government reserves the right to conduct unannounced safety inspection at any time, all OSHA required records to include OSHA form 300 and 300A will be made available to COR or ANAD Safety Office Staff upon request or during unannounced safety inspections. OSHA logs must be produced for review within 3 working days of initial request. Contractor will notify ANAD Safety Office immediately of Reports of Inspections and/or Notices of Violation or other enforcement actions (including warning letters) received from/ by local, State, and Federal Regulators in which the violation is attributed to the action of the contractor or its subcontractors. Contractor will provide ANAD with a copy of the Inspection Report, Notice of Violation or other enforcement action, and all supporting documentation within 1 day of receipt of documentation.
If a contractor employee is observed performing an activity in a manner inconsistent with any of the above cited regulations or is engaged in any activity that is dangerous to life, limb, or government property, the ANAD Safety Representative shall have the authority to notify the employee and/or the contractor’s on-site supervisor of the hazardous activity and require correction of the hazardous activity. If necessary, the ANAD Safety Representative shall have the authority on behalf of the Contracting Officer to require the contractor and/or its employee to stop the hazardous activity until corrective action is taken to eliminate a hazardous condition or safety violation. Said action shall not be considered to be the basis of a claim against the government and shall be at no cost to the Government.
The contractor must have a Drug Free Workplace plan that includes post-accident testing. This shall be part of their Safety Plan.
General:
Applicable Publication: The publications listed below form a part of this specification to extent referenced. The publications are referred to in the text by basic designation only.
Code of Federal Regulation (CFR): OSHA General Industry Safety and Health Standards (29 CFR 1910), Publication V2206; OSHA Construction Industry Standards (29 CFR 1926). One source of these regulations is OSHA Publication 2207, which includes a combination of both parts 1910 and 1926 as they relate to construction safety and health. It is for sale by the Superintendent of Documents, U.S. Government Printing Office, Washington, DC 20402. National Emission Standards for Hazardous Air Pollutants (40 CFR, Part 61).
Title 29 of the Code of Federal Regulations, Subtitle B, Part 1926 provides the safety and health regulations for construction. Under the general provisions, it gives each contractor responsibility to “…initiate and maintain such programs as may be necessary to comply with this part (29CFR1926).” The general company safety plan should address the how the company will comply with the basic requirements of the standard.
For 29 CFR 1926 and other OSHA standards and interpretations plus other resources are available from the Occupational Safety and Health web site, www.osha.gov.
In addition to contract clause entitled "ACCIDENT PREVENTION," FAR 52.236-13, the contractor shall comply with all regulations, publications and manuals current at the time the Task Order is being performed to include but are not limited to Army Material Command (AMC) Regulation 385-100, Safety and Occupational Health Regulation ANADR 385-1, Engineering Manual (EM) 385-1-1, 29 Code of Federal Regulations (CFR) 1926/1910, other related Department of Transportation (DOT) Regulations (49 CFR), Federal Standard (Fed Std): 313A Material Safety Data Sheets, ANSI BHMA A156, National Electric Safety Code ANSI C2, NFPA Codes and Standards, National Electric Code Handbook, UFGS (Unified Facilities Guide Specification) and all local policies. Definition of Hazardous Materials: Refer to hazardous and toxic materials/substances included in Subparts H and Z of 29 CFR 1910 and to others as additionally defined in Fed. Std 313. Those most commonly encountered include asbestos, polychlorinated biphenyl’s (PCB’s) explosives and radioactive material, but may include others. The most likely products to contain asbestos are sprayed-on fireproofing, insulation, boiler lagging and pipe covering. Engineering Manual 385-1-1 outlines safety requirements for construction. A copy of it is available for review in the Anniston Army Depot safety office, or from the Army Corp of Engineers web site, www.usace.mil/publications.
The Contractor shall assume full responsibility and liability for compliance with all applicable regulations pertaining to the health and safety of personnel during the execution of work, and shall hold the Government harmless for any action on his/her part or that of his/her employees or subcontractors, which results in illness, injury, or death.
Contractors prior year OSHA logs (form 300A) and a site specific safety plan for work to be performed on Anniston Army Depot must be provided for approval by the Anniston Army Depot Safety Office no more than 10 days after award of contract. Contractor shall maintain an accurate record of accidents resulting in traumatic injury or death and accidents resulting in damage to Government property, supplies, and equipment. The Contractor shall report incidents causing disruption of contract services, or any accidents in connection with performance of this contract, to the Contracting Officer Representative within two (2) hours of occurrence. Contractor will notify ANAD Safety Office immediately of Reports of Inspections and/or Notices of Violation or other enforcement actions (including warning letters) received from/by local, State, and Federal Regulators in which the violation or alleged violation is attributed to the action of the contractor or its subcontractors. Contractor will provide ANAD with a copy of the Inspection Report, Notice of Violation or other enforcement action, and all supporting documentation.
Contractor shall safeguard and maintain all Government property, as well as, provide for the safety and well-being of personnel employed in the administration of this contract. Local PPE requirements are at minimum long pants, long sleeved shirts, protective footwear, protective eyewear and hearing protection shall be used and provided by contractor.
The Government reserves the right to conduct unannounced safety inspection at any time, all OSHA required records to include OSHA form 300 and 300A will be made available to COR or ANAD Safety Office Staff upon request or during unannounced safety inspections. OSHA logs must be produced for review within 3 working days of initial request. Contractor will notify ANAD Safety Office immediately of Reports of Inspections and/or Notices of Violation or other enforcement actions (including warning letters) received from/ by local, State, and Federal Regulators in which the violation is attributed to the action of the contractor or its subcontractors. Contractor will provide ANAD with a copy of the Inspection Report, Notice of Violation or other enforcement action, and all supporting documentation within 1 day of receipt of documentation.
If a contractor employee is observed performing an activity in a manner inconsistent with any of the above cited regulations or is engaged in any activity that is dangerous to life, limb, or government property, the ANAD Safety Representative shall have the authority to notify the employee and/or the contractor’s on-site supervisor of the hazardous activity and require correction of the hazardous activity. If necessary, the ANAD Safety Representative shall have the authority on behalf of the Contracting Officer to require the contractor and/or its employee to stop the hazardous activity until corrective action is taken to eliminate a hazardous condition or safety violation. Said action shall not be considered to be the basis of a claim against the government and shall be at no cost to the Government.
The contractor must have a Drug Free Workplace plan that includes post-accident testing. This shall be part of their Safety Plan.
(p) NOTICE TO CONTRACTORS WORKING ON ANNISTON ARMY DEPOT PREMISES Sexual Assault and Harassment in the Workplace Contractor employees working in areas with Federal employees must be aware of the workplace rules and requirements prohibiting and responding to sexual harassment and sexual assault incidents and claims. Sexual assault is an involuntary sexual act in which a person is threatened, coerced, or forced to engage against their will, or any sexual touching of a person who has not consented. Sexual assault and sexual harassment are strictly forbidden and the Depot Commander has mandated that everyone on the premises of ANAD has a responsibility to prevent assault and harassment and report it if discovered. The COR will provide a Fact Sheet defining sexual harassment to be distributed to contractor employees working in government facilities.
As with any workforce, there is opportunity for inappropriate behavior between Contractor and Government employees. Prevention and prompt reporting and resolution of any such incidents are Top Priorities at Anniston Army Depot. Offending employees are subject to barment from ANAD. Contract performance requirements will not be adjusted for reasons related to an incident involving an offense by contractor employees.
In order to prevent problems from arising, Contractor supervisors must provide the following information to each employee working on ANAD premises:
If you believe you are a victim of sexual harassment:
It is important that you take action. Ignoring sexual harassment seldom makes it stop; in most cases, sexual harassment continues or becomes worse when it is tolerated. While removing yourself from the uncomfortable situation may seem to be a solution, it is probably not in your best interest or the interests of other potential victims around you.
Tell the harasser that the behavior is unwelcome and must stop. Any way of telling them to stop is acceptable, including directly telling him or her, calling, e-mailing or sending a memo.
Tell someone; do not keep it to yourself. There are things that other people can do to help you
Document the incident. Write down dates, places, names of witnesses and what happened. Keep e-mails, text messages, instant messages, voice mails, and all history of the incidents.
Report sexual harassment to your supervisor, director, EEO staff, Victim Advocate (VA) or union representative.
Follow whatever complaint procedures apply with your employer If you witness sexual harassment or it is reported to you: Report it to your supervisor Report sexual assault to DES, Sexual Assault Response Coordinators (SARCs), Mrs. Wendy Suttles-Walker Mr.
Alfonso Lewis, or VA Boyd Scoggins Cooperate with any investigative agencies
(q) Contractor Owned Property:
When contractors bring in equipment onto Anniston Army Depot for use in performing contracted work to repair, replace or install, all contractor-owned equipment must have ‘company name’ stenciled, laser marked, or marked in some other permanent way on the equipment.
(r) Contractors Transport of Government Owned Property:
If contractors are picking up or returning Government Furnished Property, Government Furnished Material, or Government Furnished Equipment, contractors must have proper government-issued documents in possession such as DD Form 1149 Requisition and Invoice/ Shipping Document, DD250 Material Inspection and Receiving Report, DD1348-1A Issue Release/Receipt Document, OF7 Property pass, or some other document or memorandum indicating Government ownership.
(s) COVERAGE OF OPEN DELIVERY TRUCKS All open delivery trucks or other delivery vehicles shall be covered with a tarp or other means to preclude paper or other materials from blowing out along the roadways.
Statement of Work Welding Equipments and Accessories for Directorate of Production
1.0 Scope. This specification establishes the requirements for the procurement of welding power supplies and ancillary equipment (wire feeders, welding guns and carts) for the following cost centers which include (52BA0, 52BN0, 52C30, 52EA0, 52EC0, 52EJ0, 52K40, 52KA0, 52KB0, 52LA0, 52LC0, 52LD0, 52LE0, 52W50), located at Anniston Army Depot, Anniston, Alabama (ANAD). The welding power supplies and ancillary equipment shall be delivered to ANAD by the Contractor with all the functions, capabilities and equipment as described herein. The Contractor shall provide all resources necessary to deliver, demonstrate functional operation and provide warranty service for the welding power supplies and ancillary equipment.
2.0 Responsibilities.
2.1 Contractor. The Contractor shall be responsible for:
Delivering the welding power supplies and ancillary equipment Providing warranty service for welding power supplies and ancillary equipment in accordance with the term of the warranty
2.2 Government. The Government will be responsible for:
Minor assembly and setup of equipment after delivery Providing employee(s) with a demonstration of functional operation of the welding power supplies and ancillary equipment Accepting the functioning equipment in accordance with the terms of the contract Supplying new 60 AMP, 4-pole, 4-wire Appleton Clamping Ring (Red Tag) power supply plugs, (Part Number ACP6034BC) for the required buildings as needed.
3.0 Requirements.
3.1 Quantity Requirements.
Ninety-three (93) XMT® 450 MPa 230/460 V, Aux Power (Miller part number 907479001) or equal
Forty-one (41) COOLMATE 3 "WATER COOLER" (Miller part number 43007) or equal
Fifty-nine (59) D74 MPA "WITH BERNARD Q400 GUN FOR STEEL WELDING INCLUDED" (Miller part number 951292) or equal
Forty-one (41) XR‐Pistol Plus 25 ft. Water cooled push pull gun (Miller part number 300757) or equal
Sixty‐six (66) Inverter MIG Runner/TRAVEL SYSTEM (Miller part number 195445) or equal
One hundred and one (101) Kit, 60/70 Series, .045 VK‐GR 4 Rolls (Miller part number 151053) or equal
Forty-one (41) KIT, DRIVE ROLL POLISHED .047 U‐GRV 4 ROLL AL (Miller part number 265256) or equal
Eighty (80) KIT, DRIVE ROLL POLISHED 1/16 U‐GRV 4 ROLL AL (Miller part number 265257) or equal
Forty-one (41) GUIDE, WIRE INLET NYLON .023 ‐ .052 (Miller part number 221912) or equal
Forty-one (41) GUIDE, WIRE INTERMEDIATE 3/64 AL (NYLON) (Miller part number 205936) or equal
Eighty‐two (82) Industrial MIG 4/0 Kit, Lug Connections (Miller part number 300390) or equal
Twenty (20) Binzel air‐cooled guns (Miller part number AT415T‐45MT) or equal
Twenty‐four (24) S‐74 MPa Plus (Single) (Miller part number 951291) or equal
Ten (10) Kit, 60/70 Series, .035 V‐GR 4 Rolls (Miller part number 151026) or equal
Twenty (20) Binzel water cooled guns (Miller part number MB515‐5S35‐MRB) or equal
Twenty (20) Dynasty 400 (Miller part number 951694) or equal
Nineteen (19) Hyperthermia Powermax 125 Plasma Cutter (Miller part number 059536) or equal
One hundred and thirty (130) Appleton ACP6034BC Clamping Ring Plug, 60 Amp, 4‐Pole, 3‐Wire (Miller part number ACP6034BC) or equal
Ten (10) D‐74 MPa Plus Control Box (Dual) (Miller part number 300739) or equal
3.2 Performance Requirements.
Salient Features and Minimum Requirements:
3.2.1 Welding Power Supply
Miller Electric XMT 450 MPa with auxiliary power (Miller part number 907479001) or equal o Capable of GMAW, Gas Metal Arc Welding-Pulse (GMAW-P), Shielded Metal
Arc Welding (SMAW), Gas Tungsten Arc Welding (GTAW), Flux Cored Arc Welding (FCAW) and Air Carbon Arc Gouging (CAC-A) o Rated output: Minimum 450 amps (A) at 38 volts (V) DC 100% duty cycle; 600 A maximum current o 115 V AC auxiliary power o 230/460 V AC, 3 phase input power o Built-in GMAW-P programs o Compatible with Miller Electric…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .