PCV331_SOW.docx
DOCX document 319 KB Posted
- Attached to
- Drywall and Bathroom Remodel for Housing Unit Federal contract opportunity
- Solicitation number
- 2116306PCV331
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FAQ.doc | DOC document | |
| Clauses.docx | DOCX document | |
| Wage_Rates_Port_Clinton_OH.txt | TXT text file |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
21-16-306PCV331 Request for Proposal/Quote Department of Homeland Security United States Coast Guard Base Cleveland Housing Division
Scope of Work (SOW) Housing Site Port Clinton Housing For Bathroom Remodels & Drywall
Point of Contact (POC) DC2 Vernon Horst (216)406-2276
DCC Steven Thompson (216)902-6335
Site Address 1008 Grant Street Port Clinton, OH 43452
Scope of Work
Remodel Bathrooms and Finish Walls and Ceiling of Home located at 1008 Grant Street, Port Clinton, OH 43452
1.1 Completely remodel master bathroom and half bathroom
1.11 Install Tile Flooring in Bathrooms
1.12 Install New Sink/Shower/Tub and Fixtures
1.13 Install New Toilets
| 1.14 | Install Towel Racks/Toilet Paper Racks |
| 1.15 | Install Mirror/Vanity |
| 1.16 | Install Vent Fan/Covers |
| 1.17 | Install/Upgrade Electrical Fixtures/Lighting to include GFCI’s (Where Needed) |
| 1.18 | Install Baseboard |
| 1.19 | Caulk/Seal All Seams |
1.2 Finish all walls and ceilings
| 1.21 | Hang new drywall completely throughout home |
| 1.22 | Mud and Tape Drywall completely throughout home |
| 1.23 | Prime and Paint all interior walls/ceilings |
Material/ Part Information
2.1 Contractor will furnish all equipment needed to complete work. No U.S. Coast Guard equipment will be utilized.
References
3.1 All work to be completed shall comply with Federal, State and Local Laws, Codes and Regulations.
Liabilities
4.1 The contractor will be financially responsible for any and all damages incurred while working on Government property.
Coordination
| 5.1 | All communications will go through the POC listed. No work can be modified or changed without their permission. |
| 5.2 | Work to be completed should have minimal impact on the unit’s operation. In the event any of the utilities need to be secured, these items should be well planned out. |
5.3 Normal work hours for the unit is 8:00 AM to 4:00 PM, Monday-Friday, excluding all Federal Holidays. Any work outside these times need to be worked out and approved by the POC ahead of time.
Project Completion
6.1 All work completed shall be approved by the POC. The site is to be at a minimum as clean of a condition as it was found in. All trash, debris, materials removed, etc. should be properly disposed by the contractor.