21-B-0001.docx

DOCX document 159 KB Posted

Attached to
Breech ring forging per drawing #12529579 Rev L Federal contract opportunity
Solicitation number
W911PT21B0001
Issued by
Department of the Army Materiel Command Contracting Command Detroit Arsenal

About this file

This solicitation is for the procurement of 78 breech ring forgings per drawing number 12529579 Rev L, with an option for an additional 78 forgings. Delivery is required within 150 days of contract award for the first article, with subsequent production deliveries of 20 forgings per month until complete. If first article is waived, production is to begin within 150 days of award at a rate of 20 forgings per month. The forgings are to be delivered FOB destination to Watervliet Arsenal. Offerors must have an active DD Form 2345 and valid export control certification to receive the associated technical data package from SAM.gov. The solicitation will be issued electronically on SAM.gov under the Army Contracting Command ACC-WVA.

View the file

Other files for this federal contract opportunity

Other files attached to Breech ring forging per drawing #12529579 Rev L, newest first.
File Type Posted
21-B-0001 amendment 0001.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W911PT21B0001

Section A - Solicitation/Contract Form

NOTICE TO OFFERORS

NOTICE

THE GOVERNMENT INTENDS TO MAKE ONLY ONE AWARD FOR A TOTAL QUANTITY OF 78 EACH OF THIS ITEM EITHER WITH THE FIRST ARTICLE REQUIREMENT (CLIN 0001) OR WITHOUT THE FIRST ARTICLE REQUIREMENT (CLIN 0002).

CLIN 0003 IS FOR AN OPTION OF UP TO 78 EACH. THE OFFEROR IS TO COMPLETE THE STEPLADDER PRICING IN ACCORDANCE WITH THE DIFFERENT RANGES LOCATED AT THE TOP OF PAGE 5 OF THE SOLICITATION. ***DO NOT FILL OUT ONE PRICE FOR CLIN #0003 NEAR THE MIDDLE OF PAGE #4, PLEASE LEAVE THAT BLANK***.

THE GOVERNMENT WILL HAVE THE UNILATERAL RIGHT TO EXERCISE THE OPTION QUANTITY. WE MAY EXERCISE THE ENTIRE QUANTITY AT ONE TIME OR MULTIPLE QUANTITIES AT DIFFERENT TIMES UP TO THE MAXIMUM QUANTITY OF 100 EACH (SEE CLAUSE 52.217-7, OPTION FOR INCREASED QUANTITY FOR MORE INFORMATION).

IN ACCORDANCE WITH CLAUSE 252.219-7003 – SMALL BUSINESS SUBCONTRACTING PLAND (DOD CONTRACTS), OFFERORS CLASSIFIED AS LARGE BUSINESS UNDER NAICS 332111 ARE REQUIRED TO SUBMIT AN INDIVIDUAL SMALL BUSINESS SUBCONTRACTING PLAN AT THE TIME OF BID SUBMISSION.

LOCAL NARRATIVES A

DISTRIBUTION AND DESTRUCTION OF EXPORT CONTROL TECHNICAL DATA PACKAGE

(a) This solicitation and resulting contract contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et. seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C, App. 2401 et. seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25. This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.

(b) To be eligible to gain access to this export controlled TDP (via FedBizOpps) an offeror must have a current DD 2345, “Militarily Critical Technical Data Agreement” certification on file with the Defense Logistics Information Service (DLIS). To obtain certification, go to http://www.dlis.dla.mil/jcp/, click on documents, and follow instructions provided. Processing time is estimated at six (6) to ten (10) weeks after receipt. FBO will allow access to export controlled TDPs once certification is confirmed. Upon receipt of certification, an offeror may request the TDP in accordance with the instructions stated in the solicitation's Section C.

(c) Upon completion of the purposes for which Government Technical Data has been provided, the offeror, and all subcontractors, vendors, and sub-vendors of the offeror, are required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed.

(d) Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.

Disclosure of Unit Price Information

This constitutes notification pursuant to Executive Order 12600, Pre-Disclosure Notification Procedures for Confidential Commercial Information (June 23, 1987), of our intention to release unit prices of the awardee in response to any request under the Freedom of Information Act, 5 USC 552. Unit price is defined as the contract price per unit or item purchased. We consider any objection to be waived unless the contracting officer is notified of your objection to such release prior to submission of initial proposals.

Section B - Supplies or Services and Prices

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
78
Each

FSC: 9999 Name: BREECH RING FO Part Number: 12529579

FFP

FIRST ARTICLE APPROVAL REQUIRED:

Breech Ring Forging per Drawing Number 12529579 Rev. L.

FOR: 120mm M256 Cannon.

To include contract data prepared and delivered in accordance with Contract Data Requirements List (DD Form 1423) which is attached hereto as Exhibit A; along with general data drawings, Attachment A.

MID: WBS EH20UWV439EHM7

FOB: Destination

NSN: 12529579:19206

MILSTRIP: W16H1F024401K7

PURCHASE REQUEST NUMBER: W16H1F024401K7

PSC CD: 1015

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
78
Each

FSC: 9999 Name: BREECH RING FO Part Number: 12529579

FFP

FIRST ARTICLE REQUIREMENT WAIVED::

Breech Ring Forging per Drawing Number 12529579 Rev. L.

FOR: 120mm M256 Cannon.

To include contract data prepared and delivered in accordance with Contract Data Requirements List (DD Form 1423) which is attached hereto as Exhibit A; along with general data drawings, Attachment A.

MID: WBS EH20UWV439EHM7

FOB: Destination

NSN: 12529579:19206

MILSTRIP: W16H1F024401K7

PSC CD: 1010

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
78
Each
OPTION
FSC: 9999 Name: BREECH RING FO Part Number: 12529579

FFP

Breech Ring Forging per Drawing Number 12529579 Rev. L.

FOR: 120mm M256 Cannon.

To include contract data prepared and delivered in accordance with Contract Data Requirements List (DD Form 1423) which is attached hereto as Exhibit A; along with general data drawings, Attachment A.

MID: WBS TBD

FOB: Destination

NSN: 12529579:19206

MILSTRIP: W16H1F024401K7

PSC CD: 9999

NET AMT

STEPLADDER PRICING

STEPLADDER NAME
ITEM NO
FROM QUANTITY
TO QUANTITY
UNIT PRICE
Stepladder Pricing
0003
7.00
19.00
20.00
39.00
40.00
59.00
60.00
78.00

LOCAL NARRATIVES B

NOTICE OF WATERVLIET ARSENAL INFORMATION/REQUIREMENTS

(a) IMPORTANT DELIVERY/QUALITY REQUIREMENTS:

(1) ALL OFFERORS MUST CAREFULLY REVIEW THE DELIVERY REQUIREMENT IN THE REQUEST FOR QUOTE OR SOLICITATION. WHEN SUBMITTING AN OFFER/BID, PLEASE ENSURE THAT YOU CAN MEET THE DELIVERY SCHEDULE.

(2) ON TIME DELIVERY IS VERY CRITICAL. THEREFORE, YOU MUST ADHERE TO THE DELIVERY REQUIREMENTS INDICATED IN ANY RESULTANT AWARD. FAILURE TO COMPLY WITH THE CONTRACTUAL DELIVERY SCHEDULE, MAY RESULT IN TERMINATION OF THE ORDER OR REQUIRE CONSIDERATION IF THE GOVERNMENT ELECTS TO EXTEND DELIVERY. (NOTE: Non-availability of raw materials, subcontractor issues, scheduling conflicts, should be considered at the time you are submitting your offer/bid. They are not acceptable excuses for failing to meet the delivery after award).

(3) PROVIDING QUALITY PRODUCTS THAT CONFORM TO THE CONTRACT ARE JUST AS IMPORTANT AS MEETING THE REQUIRED DELIVERY. DELIVERY OF NON-CONFORMING PRODUCTS RESULTS IN DELIVERY DELAYS AND INCREASED COSTS TO THE ARSENAL.

(4) PAST PERFORMANCE FOR QUALITY AND DELIVERY MAY BE A MAJOR CONSIDERATION IN MAKING DETERMINATIONS FOR FUTURE CONTRACT AWARDS.

NOTICE: Throughout this document we may use the terms “we” and “you”, the term “we” means the government of the United States of America, and the term “you” means the contractor.

(b) WATERVLIET ARSENAL INFORMATION FOR CONTRACTORS:

“Watervliet Arsenal Information for Contractors” document is incorporated by reference in all solicitations and contracts. The full text version of the instructions is available at Internet address: http://www.wva.army.mil/Documents/Contracting/WAIC.pdf Upon request, the contracting officer will make its full text available.”

POC - CONTRACT SPECIALIST/BUYER: Peter J. Haschytz II

TELEPHONE NUMBER: 518-266-3933

E-MAIL ADDRESS: peter.j.haschytz.civ@mail.mil

CONTRACTOR DUNS NUMBER/CAGE CODE/FAX NUMBER:

Please provide the following information for your company.

VENDOR NAME: _________________________

VENDOR POC: __________________________

POC PHONE: ____________________________

E-MAIL ADDRESS (see note below): __________________________

DUNS NUMBER ______________________

CAGE CODE (if known) __________________

TAX ID NUMBER ________________________

VENDOR FAX NUMBER ________________

NOTE: Your e-mail address is required so that in the event you receive the resultant award, we can e-mail it to you. If we experience difficulties with e-mail, it will be data faxed.

(c) AWCF BULK FUND ____ DOES _X_ DOES NOT APPLY

(d) POSTERS:

(1) Contracts for Material, Supplies, Articles and Equipment Exceeding $15,000/Service Contract Labor Standards. Orders subject to these Acts require contractors to post WH Publication 1313, “Employee Rights on Government Contracts”.

(2) Construction Orders. Orders for construction require contractors to post WH Publication 1321, “Employee Rights under the Davis Bacon” and the Office of Federal Contract Compliance poster on “Equal Employment Opportunity is the Law.”

(3) These posters can be accessed electronically at http://www.dol.gov .

(4) Hard copies of the posters will be made available upon request to the contracting officer.

(e) PAYMENTS:

Any vendor that receives an award (except those paid by credit card or accommodation check) can view invoice payments made by DFAS at https://wawf.eb.mil/ using the “my invoice” system. You will be required to register in order to view payments. Payment information is maintained for 120 days from invoice payment. Vendors can find out when invoices have been paid by Electronic Funds Transfer (EFT), etc. This website can save valuable time and frustration over billing questions and it is a free service.

(f) RELEASE OF INFORMATION:

The contractor shall not release or authorize release of DoD specifications; acceptance test results; information involving critical military technology; or any other information in which the DoD maintains proprietary rights, or is otherwise confidential or classified. This restriction includes any endorsement by the Department of Army of a contractor. Release of information under the circumstances referenced above requires the prior written approval of the Contracting Officer responsible for this contract. It is the contractor’s responsibility to be familiar with, and comply with the requirements of Chapter 5, page 22, paragraph 5-48, of AR 360-1 may be found at http://www.usapa.army.mil/pdffiles/r360_1.pdf

Section C - Descriptions and Specifications

EXHIBIT A

CONTRACT DATA REQUIREMENT LIST – DD Form 1423 Form Approval OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.: 0001or 0002 and 0003

B. EXHIBIT A

C. CATEGORY

D. SYSTEM/ITEM

E. CONTRACT/PR NO.:

F. CONTRACTOR

1. DATA ITEM NO: A001

2. TITLE OF DATA ITEM: Certification/Data Report

3. SUBTITLE: Certified Test Report (CTR), Minor Forgings/Castings & Material (CN2)

4. AUTHORITY: DI-MISC-80678

5. CONTRACT REFERENCE: QAP-APPX-WVA and applicable drawing or material specification

6. REQUIRING OFFICE: TAWV-ODQ-M

7. DD250 REQUIRED: No

8. APP CODE:

9. DISTRIBUTION STATEMENT REQUIRED: B Test and Evaluation

10. FREQUENCY: With Each Submission

11. AS OF DATE:

12. DATE OF FIRST SUBMISSION: With Each Shipment

13. DATE OF SUBSEQUENT SUBMISSIONS: With Each Shipment

14. DISTRIBUTION:

A. ADDRESSEES: DEPARTMENT OF THE ARMY, Attn: TAWV-ODQ-M Bldg. 35-E, Watervliet Arsenal, 1 Buffington Street, Watervliet NY 12189-4000

B. COPIES:

DRAFT: 0

FINAL: 1

15. TOTAL: 1

16. REMARKS: Delete paragraph 10.3, 10.4 of referenced DID (Block 4). Submit a CTR showing the results of all chemical and mechanical tests required by the drawing and/or specification. See QAP-APPX-WVA paragraph 4.6 for the requirement. Data Item Description (DID) referenced in block 4 can be accessed at: http//assist.daps.mil.

17. PRICE GROUP:

18. ESTIMATED TOTAL PRICE:

19. CCTA-HDW, FAX NUMBER: 518-266-5602

G. PREPARED BY:

H. DATE:

I. APPROVED BY: William Potter, TAWV-ODQ-M J. DATE: 9 May 2013

CONTRACT DATA REQUIREMENT LIST – DD Form 1423 Form Approval OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.: 0001

B. EXHIBIT A

C. CATEGORY

D. SYSTEM/ITEM

E. CONTRACT/PR NO.:

F. CONTRACTOR

1. DATA ITEM NO: A002

2. TITLE OF DATA ITEM: Test/Inspection Report

3. SUBTITLE: Inspection Records – First Article Sample (CN 3)

4. AUTHORITY: DI-NDTI-80809B

5. CONTRACT REFERENCE: First Article Clause

6. REQUIRING OFFICE: TAWV-ODQ-M

7. DD250 REQUIRED: *See Block 16

8. APP CODE:

9. DISTRIBUTION STATEMENT REQUIRED: N/A

10. FREQUENCY: ONE/P

11. AS OF DATE:

12. DATE OF FIRST SUBMISSION: With First Article

13. DATE OF SUBSEQUENT SUBMISSIONS: With First Article

14. DISTRIBUTION:

A. ADDRESSEES: As specified in contract or purchase order

B. COPIES:

DRAFT: 0

FINAL: 1

15. TOTAL: 1

16. REMARKS: Delete paragraph 10.2 of referenced DID (Block 4). Submit SMCWV Form 2005 showing results of inspections. Also submit DD Form 1222. Computerized versions of these forms may be used with prior approval of the procuring office. See QAP-APPX-WVA paragraph 10 for requirements. * Inspection/acceptance requirements specified in the contract. Data Item Description (DID) referenced in block 4 can be accessed at: http//assist.daps.mil. Instructions and general guidance on documentation of CDRL and General Quality Assurance Provisions can be found at Watervliet Arsenal’s home page on the web at: http://www.wva.army.mil under “Doing Business with Watervliet Arsenal”.

17. PRICE GROUP:

18. ESTIMATED TOTAL PRICE:

19. CCTA-HDW, FAX NUMBER: 518-266-5602

G. PREPARED BY:

H. DATE:

Public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.: 0001 or 0002 and 0003

B. EXHIBIT A

C. CATEGORY

D. SYSTEM/ITEM

E. CONTRACT/PR NO.:

F. CONTRACTOR

1. DATA ITEM NO: A003

2. TITLE OF DATA ITEM: Certification/Data Report

3. SUBTITLE: Certificate of Conformance (COC), NDT Applications (CN 9)

4. AUTHORITY: DI-MISC-80678

5. CONTRACT REFERENCE: QAP-APPX-WVA and applicable drawing or material specification

6. REQUIRING OFFICE: TAWV-ODQ-M

7. DD250 REQUIRED: No

8. APP CODE:

9. DISTRIBUTION STATEMENT REQUIRED: N/A

10. FREQUENCY: With Each Submission

11. AS OF DATE:

12. DATE OF FIRST SUBMISSION: With First Shipment

13. DATE OF SUBSEQUENT SUBMISSIONS: With Each Shipment

14. DISTRIBUTION:

A. ADDRESSEES: DEPARTMENT OF THE ARMY, Attn: TAWV-ODQ-M Bldg. 35-E, Watervliet Arsenal, 1 Buffington Street, Watervliet NY 12189-4000

B. COPIES:

DRAFT: 0

FINAL: 1

15. TOTAL: 1

16. REMARKS: Delete paragraph 10.3, 10.4 of referenced DID (Block 4). See QAP-APPX-WVA paragraph 4.6 and 9 for the general requirements. The COC will also contain specific references to a specification or drawing for the acceptance standards, procedure and personnel qualifications. Data Item Description (DID) referenced in block 4 can be accessed at: http//assist.daps.mil. Instructions and general guidance on documentation of CDRL and General Quality Assurance Provisions can be found at Watervliet Arsenal’s home page on the web at: http://www.wva.army.mil under “Doing Business with Watervliet Arsenal”.

17. PRICE GROUP:

18. ESTIMATED TOTAL PRICE:

19. CCTA-HDW, FAX NUMBER: 518-266-5602

G. PREPARED BY:

H. DATE:

Public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.: 0001 or 0002 and 0003

B. EXHIBIT A

C. CATEGORY

D. SYSTEM/ITEM

E. CONTRACT/PR NO.:

F. CONTRACTOR

1. DATA ITEM NO: A004

2. TITLE OF DATA ITEM: Test/Inspection Report

3. SUBTITLE: Inspection Records, Production Components (CN12)

4. AUTHORITY: DI-NDTI-80809B

5. CONTRACT REFERENCE: QAP-APPX-WVA

6. REQUIRING OFFICE: TAWV-ODQ-M

7. DD250 REQUIRED: No

8. APP CODE:

9. DISTRIBUTION STATEMENT REQUIRED: N/A

10. FREQUENCY: With Each Submission

11. AS OF DATE:

12. DATE OF FIRST SUBMISSION: With First Shipment

13. DATE OF SUBSEQUENT SUBMISSIONS: With Each Shipment

14. DISTRIBUTION:

A. ADDRESSEES: DEPARTMENT OF THE ARMY, Attn: TAWV-ODQ-M Bldg. 35-E, Watervliet Arsenal, 1 Buffington Street, Watervliet NY 12189-4000

B. COPIES:

DRAFT: 0

FINAL: 1

15. TOTAL: 1

16. REMARKS: Delete paragraph 10.2 through 10.2.8 of referenced DID (Block 4).

Submit all records for production components. See QAP-APPX-WVA paragraph 4.2 and 4.5 for the requirement.

Data Item Description (DID) referenced in block 4 can be accessed at: http//assist.daps.mil. Instructions and general guidance on documentation of CDRL and General Quality Assurance Provisions can be found at Watervliet Arsenal’s home page on the web at: http://www.wva.army.mil under “Doing Business with Watervliet Arsenal”.

17. PRICE GROUP:

18. ESTIMATED TOTAL PRICE:

19. CCTA-HDW, FAX NUMBER: 518-266-5602

G. PREPARED BY:

H. DATE:

Public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.: 0001 or 0002 and 0003

B. EXHIBIT A

C. CATEGORY

D. SYSTEM/ITEM

E. CONTRACT/PR NO.:

F. CONTRACTOR

1. DATA ITEM NO: A005

2. TITLE OF DATA ITEM: Test Procedure

3. SUBTITLE: Magnetic Particle Inspection Procedures (CN 23)

4. AUTHORITY: DI-NDTI-80603

5. CONTRACT REFERENCE: QAP-APPX-WVA and ASTM-E1444

6. REQUIRING OFFICE: TAWV-ODQ-M

7. DD250 REQUIRED: No

8. APP CODE: A

9. DISTRIBUTION STATEMENT REQUIRED: N/A

10. FREQUENCY: ONE/R

11. AS OF DATE:

12. DATE OF FIRST SUBMISSION: *See Block 16

13. DATE OF SUBSEQUENT SUBMISSIONS: With Each Revision

14. DISTRIBUTION:

A. ADDRESSEES: DEPARTMENT OF THE ARMY, Attn: TAWV-ODQ-M Bldg. 35-E, Watervliet Arsenal, 1 Buffington Street, Watervliet NY 12189-4000

B. COPIES:

DRAFT: 0

FINAL: 1

15. TOTAL: 1

16. REMARKS: Delete paragraph 10.2 through 10.2.2.8 of referenced DID (Block 4). Submit written procedures for review and approval by the procuring office. The minimum elements of the procedure are detailed in paragraphs 5.3 thru 5.3.1.15 of ASTM-E1444. Specific heat treatment requirements will be per QAP-APPX-WVA paragraph 9.1. *With First Article or no later than 30 days prior to first production shipment when First Article is not required. Government requires 15 days to review/approve. Data Item Description (DID) referenced in block 4 can be accessed at: http//assist.daps.mil. Instructions and general guidance on documentation of CDRL and General Quality Assurance Provisions can be found at Watervliet Arsenal’s home page on the web at: http://www.wva.army.mil under “Doing Business with Watervliet Arsenal”.

17. PRICE GROUP:

18. ESTIMATED TOTAL PRICE:

19. CCTA-HDW, FAX NUMBER: 518-266-5602

G. PREPARED BY:

H. DATE:

I. APPROVED BY: William Potter, TAWV-ODQ-M J. DATE: 9 May 2013

CONTRACT DATA REQUIREMENT LIST – DD Form 1423 Form Approval OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.: 0001 or 0002 and 0003

B. EXHIBIT A

C. CATEGORY

D. SYSTEM/ITEM

E. CONTRACT/PR NO.:

F. CONTRACTOR

1. DATA ITEM NO: A006

2. TITLE OF DATA ITEM: Chemical and Physical Properties for Forging or Casting Analysis Report

3. SUBTITLE: Major Forging/Casting with Value Difference (CN 27)

4. AUTHORITY: DI-FORG-81196

5. CONTRACT REFERENCE: Applicable drawing or material specification

6. REQUIRING OFFICE: TAWV-ODQ-M

7. DD250 REQUIRED: No

8. APP CODE:

9. DISTRIBUTION STATEMENT REQUIRED: N/A

10. FREQUENCY: ASREQ

11. AS OF DATE:

12. DATE OF FIRST SUBMISSION: With First Shipment

13. DATE OF SUBSEQUENT SUBMISSIONS: With Each Shipment

14. DISTRIBUTION:

A. ADDRESSEES: DEPARTMENT OF THE ARMY, Attn: TAWV-ODQ-M, Bldg. 35-E, Watervliet Arsenal, 1 Buffington Street, Watervliet NY 12189-4000

B. COPIES:

DRAFT: 0

FINAL: 1

15. TOTAL: 1

16. REMARKS: Determine the Value Difference and report on the Record of Treatment and Test, SMCWV Form 1155. Redetermine Value Difference when a material and/or process change is made. Data Item Description (DID) referenced in block 4 can be accessed at: http//assist.daps.mil. Instructions and general guidance on documentation of CDRL and General Quality Assurance Provisions can be found at Watervliet Arsenal’s home page on the web at: http://www.wva.army.mil under “Doing Business with Watervliet Arsenal”.

17. PRICE GROUP:

18. ESTIMATED TOTAL PRICE:

19. CCTA-HDW, FAX NUMBER: 518-266-5602

G. PREPARED BY:

H. DATE:

ATTACHMENT A

GENERAL DATA/GENERAL DRAWINGS

THIS TDP DOES NOT CONTAIN A SPECIFICATION OR STANDARD REQUIRING THE USE OF A CLASS I COC OR A CONTRACTUAL REQUIREMENT THAT CAN BE MET ONLY THROUGH USE OF SUCH A SUBSTANCE.

DRAWING #
REV
DATE
TITLE
12529579
L
181208
Breech Ring Forging (Rough Machined) 3 SHEETS

QAP12529579

QAP-APP-BL

AA
181208

010731 QAP for: Breech Ring Forging 12529579 (Rough Machined) General Requirements for Quality Assurance Provision

ADDITIONAL DRAWINGS/DOCUMENTS

DRAWING #
REV
DATE
TITLE
7309991 SHT1
H
661005
Magnetic Particle Inspection Criteria for Breech Rings
7309991 SHT2
New
600923
Magnetic Particle Inspection Criteria for Breech Rings

7309991 SHT3

12521199 (SHT1-3)

A A 630929 930528 Magnetic Particle Inspection Criteria for Breech Rings General Data Governing Special Inspection Equipment

MILITARY/FEDERAL SPECIFICATIONS/STANDARDS

NUMBER
REV
AMD
NOT
DATE
TITLE
MIL-DTL-13931
J
2
141106
Cannon: General Specification for

MIL-S-46172

MIL-HDBK-204

MIL-STD-130

A A

N

131008 200630

190826 Steel Forgings

DESIGN OF INSPECTION EQUIPMENT FOR DIMENSIONAL CHARACTERISTICS

Identification Marking of U.S. Military Property

INDUSTRY STANDARDS

SOCIETY/NUMBER

ASME Y14.100

ASME 14.5

ASTM E10

ASTM E23

ASTM D3951

YEAR

TITLE

Engineering Drawing Practices Dimensioning and Tolerancing Standard Test Method for Brinell Hardness of Metallic Materials Standard Test Methods for Notched Bar Impact Testing of Metallic Materials Standard Practice for Commercial Packaging

ASTM E8/E8M

AIA/NAS NAS410

ASTME1444/E1444M

NCSL Z540.3

SAE AS9102B

16(E2020) 06(R2013)

Standard Test Method for Tension Testing of Metallic Materials NAS Certification & Qualification of Nondestructive Test Personnel - REV 4 Standard Practice for Magnetic Particle Testing Requirements for the Calibration of Measuring and Test Equipment

(R) Aerospace First Article Inspection Requirement

LOCAL NARRATIVES C

TECHNICAL DATA PACKAGE INFORMATION

The following “X”d item applies to this solicitation:

[ ] 1. There is no Technical Data Package (TDP) included with this solicitation.

[X ] 2. The TDP for this solicitation resides within System for Award Management (SAM) (sam.gov), associated with this solicitation number, and can be accessed via this URL:

Link is at solicitation page in SAM website.

To access the data through SAM :

a. Log on to the SAM web site.

b. Enter Marketing Partner Identification Number (MPIN).

c. Search for the solicitation number.

d. If solicitation is Export Controlled, select “Verify MPIN.”

(1) TDPs that have an Export Control Warning Notice are subject to the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et.seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C, App. 2401 et. seq..

(2) Further dissemination must be in accordance with provisions of DoD Directive 5230.25. This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.

(3) To obtain these TDPs, vendors and contractors must have a current DD 2345, Militarily Critical Technical Data Agreement on file with Defense Logistics Information Service (DLIS). Currently certified contractors should enter the MPIN which will be verified before proceeding to the next step. To obtain certification, go to http://www.dlis.dla.mil/jcp/

Click on documents and follow instructions provided. Processing time is estimated at six (6) to ten (10) weeks after receipt. SAM will allow access to export controlled TDPs once certification is confirmed.

(4) Upon completion of the purposes for which Government Technical Data has been provided, the Contractor is required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed by the Contractor. Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.

e. If technical data is otherwise restricted, select “Request Explicit Access.” This will generate an email to the SAM system administrator at Army Contract Command - Warren (DTA) with all the information needed to grant a contractor access. SAM will subsequently automatically generate an email stating when the requesting contractor has permission to view or download TDP items. Allow two (2) to three (3) working days to complete this SAM -TDP access/approval process through the SAM system.

f. If multiple individuals in the contractor’s organization need access to the Technical Data Package (TDP) for a solicitation and an explicit access request is required, each individual MUST submit an explicit access request to be granted approval to view the TDP. Those same individuals MUST be registered in Federal Business Opportunities (SAM ). Any individuals no longer with the company should be deleted. Questions related to registration in SAM should be directed to https://www.SAM .gov/index The SAM helpdesk phone number is (866) 606-8220. Vendors are responsible for placing correct information in SAM .

g. It is strongly suggested that contractors submit the explicit access request and provide the buyer with the completed “Use and Non-Disclosure Agreement” at the same time if the solicitation requires both to gain access to view the TDP.

h. A user guide for SAM can be found at https://www.SAM .gov - on the right is User Guides - click on “Vendor”.

ACCESS AND GENERAL PROTECTION/SECURITY POLICY AND PROCEDURES

(a) The contractor and all associated subcontractors’ employees shall comply with applicable installation, facility, and area commander installation and facility access and local security policies and procedures (provided by the Government representative). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the installation Provost Marshal Office, Director of Emergency Services, or Security Office. The contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9 “Personal Identity Verification of Contractor Personnel”) as directed by DoD, HQDA, and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.

(b) For contractors requiring Common Access Card (CAC). Before CAC issuance, the contractor employee requires, at a minimum, a favorably adjudicated National Agency Check with Inquiries (NACI) or an equivalent or higher investigation in accordance with Army Directive 2014-05, The contractor employee will be issued a CAC only if duties involve one of the following: (1) Both physical access to a DoD facility and access, via logon, to DoD networks on-site or remotely; (2) Remote access, via logon, to a DoD network using DoD-approved remote access procedures; or (3) Physical access to multiple DoD facilities or multiple non-DoD federally controlled facilities on behalf of the DoD on a recurring basis for a period of six (6) months or more. At the discretion of the sponsoring activity, an initial CAC may be issued on a favorable review of the FBI fingerprint check and a successfully scheduled NACI at the Office of Personal Management.

(c) For contractors that do not require CAC, but require access to a DoD facility or installation. Contractor and all associated sub-contractors employees shall comply with adjudication standards, and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures elsewhere in Section C; Non-disclosure Statement; for OCONUS locations, refer to the Status of Forces Agreement and other theater regulations.

SCOPE OF WORK/IDENTIFICATION OF CASTING/FORGING MANUFACTURER

If the offeror intends to subcontract the manufacture of a casting/forging required by this solicitation, he must indicate herein who will furnish the basic casting/forging. After award of a contract, any change of this subcontractor will not be made without prior approval of the contracting officer.

Section E - Inspection and Acceptance

INSPECTION ACCEPTANCE CRITERIA

PLACE OF INSPECTION AND ACCEPTANCE

Government inspection/acceptance will be made by the authorized Government Representative located at:

InspectionAcceptance
[ ] Watervliet Arsenal[ ] Watervliet Arsenal
[ X ] Contractor’s Plant[ X ] Contractor’s Plant

GENERAL REQUIREMENTS FOR QUALITY ASSURANCE (DEC 2001) (ACC-WRN(WVA))

Contractor requirements and inspection provisions are required in accordance with QAP-APPENDIX-BL and item QAP(s), if applicable.

(END OF CLAUSE)

CHEMISTRY (Apr 1998) (ACC-WRN(WVA))

Offeror shall list in the spaces provided below, the chemistry of the steel which he proposes to use for producing the forgings herein. Chemistry will not be changed during production without prior approval of the Contracting Officer.

LATENT MATERIAL DEFECT (Oct 1993) (ACC-WRN(WVA))

When the contractor certifies that the material delivered under this order conforms to the material specified herein, the Government may within a reasonable time from receipt of material, and notwithstanding previous acceptance, perform a physical/chemical analysis of the material to assure conformance to specification requirement. Failure of the material to meet the physical/chemical requirements will be a cause for rejection as a Latent Material Defect and will necessitate replacement of the material at the contractor’s expense when so directed by the Contracting Officer.

52.246-11 HIGHER LEVEL CONTRACT QUALITY REQUIREMENTS (Dec 2014)

(a) The contractor shall comply with the higher-level quality standard selected below.

TITLE NUMBER DATE TAILORING

[ ] Model for Quality AssuranceANSI/ISO/In effect on date of______________
in design, development,ASQC-Q9001contract

production, installation and servicing

[ ] Model Quality AssuranceISO-9001In effect on date of ______________
in production, installation(ANSI/ISO/contract
and servicingASQC-Q9001)

[ ] Equivalent Quality System Program

(b) The Contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts, in—

(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or

(2) When the technical requirements of a subcontract require--

(i) Control of such things as design, work operations, in-process control, testing, and inspection; or

(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.

(End of clause)

52.0209-003 I FIRST ARTICLE APPROVAL- CONTRACTOR TESTING (Sept 1989) – ALT I (Jan 1997)

Two BREECH RING FORGING (ROUGH MACHINED), 12529579, shall be furnished for 100% inspection of all requirements, to assure compliance with QAP(s), specification(s) and drawing(s). One BREECH RING FORGING (ROUGH MACHINED), 12529579, shall be destructively tested for mechanical properties. Additional test samples per NOTE 2 of drawing for First Article are also required. as specified in this contract. At least 15 calendar days before the beginning of first article tests, the contractor shall notify the contracting officer, in writing, of the time and location of the testing so that the government may witness the tests.

(b) The contractor shall submit the first article test report within __15__ calendar days from the date of this contract to:

WATERVLIET ARSENAL

VENDOR QUALITY & GAGE CALIBRATION WORK GROUP

BLDG #35E, ATTN: TAWV-OD(Q)

WATERVLIET, NY 12189-4050

Marked “FIRST ARTICLE TEST REPORT: Contract No. ______________ Lot/Item No. __________.”

Within __30__ calendar days after the Government receives the test report, the contracting officer shall notify the contractor, in writing, of the conditional approval, approval or disapproval of the first article. The notice of conditional approval or approval shall not relieve the contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the contractor. A notice of disapproval shall cite reasons for the disapproval.

(c) If the first article is disapproved, the Contractor, upon Government request, shall repeat any or all first article tests. After each request for additional tests, the Contractor shall make any necessary changes, modifications, or repairs to the first article or select another first article for testing. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following a disapproval. The Contractor shall then conduct the tests and deliver another report to the Government under the terms and conditions and within the time specified by the Government. The Government shall take action on this report within the time specified in paragraph (b) of this subsection. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule, or for any additional costs to the Government related to these tests.

(d) If the Contractor fails to deliver any first article report on time, or the Contracting Officer disapproves any first article, the Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.

(e) Unless otherwise provided in the contract, and if the approved first article is not consumed or destroyed in testing, the Contractor may deliver the approved first article as part of the contract quantity if it meets all contract requirements for acceptance.

(f) If the Government does not act within the time specified in paragraph (b) or (c) of this subsection, the Contracting Officer shall, upon timely written request from the Contractor, equitably adjust under the changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay.

(g) Before first article approval, the acquisition of materials or components for, or the commencement of production of, the balance of the contract quantity is at the sole risk of the Contractor. Before first article approval, the costs thereof shall not be allocable to this contract for (1) progress payments, or (2) termination settlements if the contract is terminated for the convenience of the Government.

(h) The Government may waive the requirement for first article approval test where supplies identical or similar to those called for in the schedule have been previously furnished by the offeror/contractor and have been accepted by the Government. The offeror/contractor may request a waiver.

(i) The Contractor shall produce both the first article and the production quantity at the same facility.

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN
INSPECT AT
INSPECT BY
ACCEPT AT
ACCEPT BY
0001
Origin
Government
Origin
Government
0002
Origin
Government
Origin
Government
0003
Origin
Government
Origin
Government

CLAUSES INCORPORATED BY REFERENCE

52.246-2
Inspection Of Supplies--Fixed Price
AUG 1996
52.246-16
Responsibility For Supplies
APR 1984

Section F - Deliveries or Performance

LOCAL NARRATIVE F

DELIVERY INFORMATION

(a) NOTICE: NORMAL DELIVERY HOURS FOR RECEIPT OF SUPPLIES AT WATERVLIET ARSENAL ARE AS FOLLOWS:

Monday through Thursday Business Hours: 6:30 A.M. EST to 3:30 P.M. EST

Friday Business Hours: Every other Friday from 6:30 A.M. EST to 2:00 P.M. EST

Fridays will be staggered with every other Friday being a closed business day. The first Friday of 2021 to be closed is January 4, 2021.

BASED ON THE ABOVE, CONTRACTORS SHOULD CALL THE CONTRACT/PURCHASE ORDER ADMINISTRATOR IN ADVANCE IF DELIVERY IS SCHEDULED FOR A FRIDAY TO FIND OUT IF THE ARSENAL WILL BE OPEN FOR BUSINESS.

Also, when a federal holiday is normally observed on a Friday, the arsenal may be closed on the preceding Thursday. In these instances, please contact the contract/purchase order administrator in advance of delivery if Thursday delivery is anticipated to determine if the arsenal will be open for business.

THE ABOVE INFORMATION SHOULD BE NOTED WHEN SCHEDULING DELIVERIES AS WATERVLIET ARSENAL WILL NOT BE LIABLE FOR ANY STORAGE, DEMURRAGE OR SHIPPER LABOR COSTS INCURRED AS A RESULT OF CONTRACTOR ATTEMPTED DELIVERIES ARRIVING DURING NON-BUSINESS HOURS.

(b) ITEM DESCRIPTION:

The material delivered hereon must be tagged or otherwise identified by placing the purchase order/contract number on the packing slip or it will be returned at the contractor’s expense. If more than one item is involved, material must be segregated by item and must be tagged or otherwise identified by item number. National stock number, when applicable, must be shown on all vendor’s documents, such as Bill of Lading, Notice of Shipment, delivery or packing slip, etc.

52.211-17
Delivery of Excess Quantities
SEP 1989
52.242-17
Government Delay Of Work
APR 1984
52.247-34
F.O.B. Destination
NOV 1991

CLAUSES INCORPORATED BY FULL TEXT

52.211-8 TIME OF DELIVERY (JUN 1997)

(a) The Government requires delivery to be made according to the following schedule:

REQUIRED DELIVERY SCHEDULE

TEM QUANTITY DELIVERY

0001AS STATEDFIRST ARTICLE – WITHIN 150 DAYS AFTER DATE OF
CONTRACT.

PRODUCTION QUANTITY – WITHIN 60 DAYS OF FIRST

ARTICLE APPROVAL AT THE RATE OF 20 PER MONTH

MINIMUM UNTIL COMPLETE.

OR

0002 AS STATED PRODUCTION QUANTITY – WITHIN 150 DAYS AFTER DATE

OF CONTRACT AT THE RATE OF 20 PER MONTH MINIMUM

UNTIL COMPLETE.

000378 EACH MAXWITHIN 120 DAYS OF EACH EXERCISED MODIFICATION FOR
OPTION QUANTITY AT THE RATE OF 20 PER MONTH
MINIMUM UNTIL COMPLETE.

SHIP TO ADDRESS:

ITEM ADDRESS

0001W16H1F
FIRST ARTICLEWATERVLIET ARSENAL

VENDOR QUALITY & GAGE CALIBRATION WORKING GROUP

BLDG. #35E, ATTN: TAWV-OD(Q)

WATERVLIET, NY 12189-4000

0001 OR 0002 (PRODUCTIONW16H1F
QUANTITY)TRANSPORTATION OFFICER
& 0003 (OPTION QUANTITY)WATERVLIET ARSENAL

TAWV-IML-S/BLDG. 35

SHIPPING AND RECEIVING

WATERVLIET, NY 12189-4000

518-266-5769

(b) Attention is directed to the Contract Award provision of the solicitation that provides that a written award or acceptance of offer mailed, or otherwise furnished to the successful offeror, results in a binding contract. The Government will mail or otherwise furnish to the offeror an award or notice of award not later than the day award is dated. Therefore, the offeror should compute the time available for performance beginning with the actual date of award, rather than the date the written notice of award is received from the Contracting Officer through the ordinary mails. However, the Government will evaluate an offer that proposes delivery based on the Contractor's date of receipt of the contract or notice of award by adding (1) five calendar days for delivery of the award through the ordinary mails, or (2) one working day if the solicitation states that the contract or notice of award will be transmitted electronically. (The term "working day" excludes weekends and U.S. Federal holidays.) If, as so computed, the offered delivery date is later than the required delivery date, the offer will be considered nonresponsive and rejected.

Section G - Contract Administration Data

252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)

(a) Definitions. As used in this clause—

“Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.

“Document type” means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.

“Payment request” and “receiving report” are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall—

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.

(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:

(1) Document type. The Contractor shall submit payment requests using the following document type(s):

(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.

(ii) For fixed price line items—

(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.

INVOICE AND RECEIVING REPORT (COMBO)

(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.

N/A

(iii) For customary progress payments based on costs incurred, submit a progress payment request.

(iv) For performance based payments, submit a performance based payment request.

(v) For commercial item financing, submit a commercial item financing request.

(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table*

Field Name in WAWF
Data to be entered in WAWF
Pay Official DoDAAC
TBD
Issue By DoDAAC
W911PT
Admin DoDAAC**
W911PT and/or TBD
Inspect By DoDAAC
TBD
Ship To Code
W16H1F
Ship From Code
Not applicable
Mark For Code
Not applicable
Service Approver (DoDAAC)
Not applicable
Service Acceptor (DoDAAC)
Not applicable
Accept at Other DoDAAC
TBD
LPO DoDAAC
Not applicable
DCAA Auditor DoDAAC
Not applicable
Other DoDAAC(s)
Not applicable

(*Contracting Officer: Insert applicable DoDAAC information. If multiple ship to/acceptance locations apply, insert “See Schedule” or “Not applicable.”) (**Contracting Officer: If the contract provides for progress payments or performance-based payments, insert the DoDAAC for the contract administration office assigned the functions under FAR 42.302(a)(13).)

(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.

(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.

(g) WAWF point of contact.

(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s WAWF point of contact.

Peter J. Haschytz II, Contract Specialist, 518-266-3933 (Contracting Officer: Insert applicable information or “Not applicable.”)

(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.

Section H - Special Contract Requirements

LOCAL NARRATIVES H

CRITICAL MILITARY TECHNOLOGY (APR 1988) ((ACC-WRN(WVA))

The documents, drawings (microfilms) listed herein contain critical military technology that is owned by the United States Government, Watervliet Arsenal. These documents, drawings (microfilm) are not to be used for any purpose other than the purpose for which they are furnished, nor shall they be distributed or reproduced for any purpose, nor any part of their contents revealed in any manner, to persons other than the individuals or organizations specified to receive it, or their employees, without written consent of the Watervliet Arsenal.

LIST OF DOCUMENTS/DRAWING NO.

12529579

DISCLOSURE OF WATERVLIET ARSENAL TECHNOLOGY (APR 2005) (ACC-WRN(WVA))

In accordance with, Title 10 of the U.S. Code Section 4542, no Cannon Production Technology as defined herein, may be furnished to any foreign source or representative thereof. Therefore, solicitations and subsequent contracts for this requirement will be confined only to United States, Puerto Rico, and Canada which are considered part of the United States Industrial Base.

Cannon Production Technology (as defined below) or other technology on any defense item being manufactured or developed at Watervliet Arsenal, will not be released outside the offeror’s/contractor’s firm and/or the United States of America (the latter prohibition includes, but is not limited to, disclosure to the offeror’s/contractor’s foreign subsidiaries, affiliates, etc.) nor will such technology be used to manufacture cannon (as defined below) or other defense items being manufactured or developed at Watervliet Arsenal, in response to requests from anyone other than Watervliet Arsenal, without prior written approval of Watervliet Arsenal (WVA).

The…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .