20Q0045 Solicitation.pdf

PDF 1 MB Posted

Attached to
Helicopter Support Services Federal contract opportunity
Solicitation number
M67399-20-Q-0045
Issued by
United States Marine Corps

View the file

Other files for this federal contract opportunity

Other files attached to Helicopter Support Services, newest first.
File Type Posted
20Q0045 0001 QAs-Time Ext.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUM

(No Collect Calls)

M6739920Q0045 12-Aug-2020

b. TELEPHONE NUMBER

760.830.5125

8. OFFER DUE DATE/LOCAL TIME

09:00 AM 14 Sep 2020

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

M673999. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

APRIL MCNELLIE

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

SEE SCHEDULE

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED ORX

SMALL BUSINESS

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

REGIONAL CONTRACTING OFFICE

P. O. BOX 788153, BLDG 1102

MCAGCC

TWENTYNINE PALMS CA 92278-8153

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE M35002 16. ADMINISTERED BY

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

X SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

M35002

JESSE FINNICUM

MAGTFTC/MCAGCC

TWENTYNINE PALMS CA 92278

TEL: 760-830-4039 FAX:

760-830-6353FAX:

TEL: SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

1,500 Employees

NAICS:

481211

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF66

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

M6739920Q0045

Section SF 1449 - CONTINUATION SHEET

ITEM NO SUPPLIES/SERVICES MAX

QUANTITY

UNIT UNIT PRICE MAX AMOUNT

0001 UNDEFINED

Light Lift Helicopter Services

FFP

The Contractor shall provide aircrew, ground personnel, supplies, ancillary support services and equipment to perform dedicated and/or ad hoc Federal

Aviation Regulation 135 airlift operations in accordance with the Performance

Work Statement (PWS).

MAX

NET AMT

UNIT UNIT PRICE MAX AMOUNT

0001AA 61 Days Light Lift Helicopter Daily Operations

FFP

Daily operations may include the movement of passengers and cargo (or combination thereof), sling-load cargo operations and/or other related services.

Daily operations rate shall include required personnel, equipment, supplies and three blade hours that the helicopters is mobilized in support of the requirement as detailed in the PWS.

FOB: Destination

MILSTRIP: M9545019PR96994

PURCHASE REQUEST NUMBER: M9545019PR96994

PSC CD: V121

UNIT UNIT PRICE MAX AMOUNT

0001AB 450 Tenth

Hours

Light Helicopter Additional Blade Hours

FFP

Additional light lift helicopter blade hours in excess of the daily minimum of three hours included in line item 0001AA. Blade hours are to be rounded to the nearest tenth of hour when invoicing.

FOB: Destination

MILSTRIP: M9545019PR96994

UNIT UNIT PRICE MAX AMOUNT

0001AC 2 Each Light Lift Moblization/Demobilization

FFP

Transportation of all personnel, equipment, and supplies to and from

MCAGCC/project staging area and return trip in support of the requirement as detailed in the PWS.

The Contractor shall mobilize light lift rotary wing on 11/30/2020 and demobilize it on 02/12/2020. Dates are subject to change.

FOB: Destination

MILSTRIP: M9545019PR96994

UNIT UNIT PRICE MAX AMOUNT

0002 UNDEFINED

Medium Lift Helicopter Services

FFP

The Contractor shall provide aircrew, ground personnel, supplies, ancillary support services and equipment to perform dedicated and/or ad hoc Federal

Aviation Regulation 135 airlift operations in accordance with PWS.

UNIT UNIT PRICE MAX AMOUNT

0002AA 6 Days Medium Lift Helicopter Daily Operations

FFP

Daily operations shall include the movement of cargo, sling-load cargo operations and/or other related services.

detailed in the PWS.

FOB: Destination

MILSTRIP: M9545019PR96994

UNIT UNIT PRICE MAX AMOUNT

0002AB 140 Tenth

Medium Helicopter Additional Blade Hours

Additional medium lift helicopter blade hours in excess of the daily minimum of three hours included in line item 0002AA. Blade hours are to be rounded to the nearest tenth of hour when invoicing.

FOB: Destination

MILSTRIP: M9545019PR96994

UNIT UNIT PRICE MAX AMOUNT

0002AC 4 Each Medium Lift Mobilization/Demobilization

FFP

Transportation of all personnel, equipment, and supplies to and from

The Contractor shall mobilize medium lift rotary wing on 11/30/2020 and demobilize it on 12/04/2020. The medium lift rotary wing shall be mobilized again on 01/19/2021 and demobilized on 01/23/2021. Dates are subject to change.

FOB: Destination

MILSTRIP: M9545019PR96994

UNIT UNIT PRICE MAX AMOUNT

0003 UNDEFINED

Heavy Lift Helicopter Services

FFP

The Contractor shall provide aircrew, ground personnel, supplies, ancillary support services and equipment to perform dedicated and/or ad hoc Federal

Aviation Regulation 135 airlift operations in accordance with PWS.

UNIT UNIT PRICE MAX AMOUNT

0003AA 6 Days Heavy Lift Helicopter Daily Operations

FFP

Daily operations shall include the movement of cargo, sling-load cargo operations and an/or other like services.

detailed in the Performance Work Statement (PWS).

FOB: Destination

MILSTRIP: M9545019PR96994

UNIT UNIT PRICE MAX AMOUNT

0003AB 240 Tenth

Heavy Helicopter Additional Blade Hours

Additional heavy lift helicopter blade hours in excess of the daily minimum of three hours included in line item 0003AA. Blade hours are to be rounded to the nearest tenth of hour when invoicing.

FOB: Destination

MILSTRIP: M9545019PR96994

UNIT UNIT PRICE MAX AMOUNT

0003AC 2 Each Heavy Lift Mobilization/Demobilization

FFP

Transportation of all personnel, equipment, and supplies to and from

The Contractor shall mobilize heavy lift rotary wing on 12/17/2020 and demobilize it on 12/24/2020. Dates are subject to change.

FOB: Destination

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 N/A N/A N/A N/A

0001AA Destination Government Destination Government

0001AB Destination Government Destination Government

0001AC Destination Government Destination Government

0002 N/A N/A N/A N/A

0002AA Destination Government Destination Government

0002AB Destination Government Destination Government

0002AC Destination Government Destination Government

0003 N/A N/A N/A N/A

0003AA Destination Government Destination Government

0003AB Destination Government Destination Government

0003AC Destination Government Destination Government

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 N/A N/A N/A N/A

0001AA POP 30-NOV-2020 TO

12-FEB-2021

N/A M35002

JESSE FINNICUM

MAGTFTC/MCAGCC

TWENTYNINE PALMS CA 92278

760-830-4039

FOB: Destination

M35002

0001AB POP 30-NOV-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

0001AC POP 30-NOV-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

0002 N/A N/A N/A N/A

0002AA POP 30-NOV-2020 TO

N/A M35002

JESSE FINNICUM

MAGTFTC/MCAGCC

TWENTYNINE PALMS CA 92278

760-830-4039

0002AB POP 30-NOV-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

0002AC POP 30-NOV-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

0003 N/A N/A N/A N/A

0003AA POP 30-NOV-2020 TO

N/A M35002

JESSE FINNICUM

MAGTFTC/MCAGCC

TWENTYNINE PALMS CA 92278

760-830-4039

0003AB POP 30-NOV-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

0003AC POP 30-NOV-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

CONTRACT MINIMUM/MAXIMUM QUANTITY AND CONTRACT VALUE

The minimum quantity and contract value for all orders issued against this contract shall not be less than the minimum quantity and contract value stated in the following table. The maximum quantity and contract value for all orders issued against this contract shall not exceed the maximum quantity and contract value stated in the following table.

MINIMUM

MINIMUM

AMOUNT

MAXIMUM

QUANTITY

MAXIMUM

AMOUNT

1.00 911.00

DELIVERY/TASK ORDER MINIMUM/MAXIMUM QUANTITY AND ORDER VALUE

The minimum quantity and order value for each Delivery/Task Order issued shall not be less than the minimum quantity and order value stated in the following table. The maximum quantity and order value for each

Delivery/Task Order issued shall not exceed the maximum quantity and order value stated in the following table.

MINIMUM

AMOUNT

MAXIMUM

QUANTITY

MAXIMUM

1.00 911.00

CLIN MINIMUM/MAXIMUM QUANTITY AND CLIN VALUE

The minimum quantity(s) and CLIN value(s) for all orders issued against the CLIN(s) on this contract shall not be less than the minimum quantity(s) and CLIN value(s) stated in the following table. The maximum quantity(s) and

CLIN value(s) for all orders issued against the CLIN(s) on this contract shall not exceed the maximum quantity(s) and CLIN value(s) stated in the following table.

CLIN

QUANTITY

MINIMUM

AMOUNT

MAXIMUM

QUANTITY

MAXIMUM

AMOUNT

0001AA 1.00 61.00

0001AB 0.00 450.00

0001AC 1.00 2.00

0002AA 1.00 6.00

0002AB 0.00 140.00

0002AC 1.00 4.00

0003AA 1.00 6.00

0003AB 0.00 240.00

0003AC 1.00 2.00

CLIN DELIVERY/TASK ORDER MINIMUM/MAXIMUM QUANTITY AND CLIN ORDER VALUE

The minimum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not be less than the minimum quantity and order value stated in the following table. The maximum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not exceed the maximum quantity and order value stated in the following table.

CLIN

QUANTITY

MINIMUM

AMOUNT

MAXIMUM

QUANTITY

MAXIMUM

0001AA 1.00

61.00

0001AB

450.00

0001AC 1.00

2.00

0002AA 1.00

6.00

0002AB

140.00

0002AC 1.00

4.00

0003AA 1.00

6.00

0003AB

240.00

0003AC 1.00

2.00

PWS

Marine Corps Air Ground Combat Center (MCAGCC) Johnson Valley Project Helicopter Support Services

Performance Work Statement (PWS)

1. GENERAL REQUIREMENTS.

1.1. Description of Services.

1.1.1 Scope. Naval Surface Warfare Center (NSWC), Corona Division has been asked by Marine Corps

Installations Command (MCICOM) to install telemetry, radio, and microwave equipment and shelters in Johnson

Valley aboard MCAGCC, Twentynine Palms, CA. NSWC has coordinated with the Assistant Chief of Staff G-6

(AC/S G-6), Ground Electronic Branch (GEMB) for logistical and planning assistance. Radio repeaters, telemetry equipment, and microwave equipment are located at strategic mountain-top relay communication sites. The relay sites are positioned at altitudes ranging from 2200 to 4600 feet, and most of the relay sites are inaccessible by ground vehicles due to steep mountainous and desert terrain within the boundaries of MCAGCC. Rotary wing transportation and operational services are required to transport maintenance personnel, parts, equipment and shelters to the remote relay communication sites. The planned staging area for this project is currently located at grid coordinates 3680 2214.

Contractor shall provide aircrew, ground personnel, supplies, ancillary support services and equipment to perform dedicated and/or ad hoc Federal Aviation Regulation 135 airlift operations (at both military and commercial airports/airfields/landing zones). Operations include the movement of passengers and cargo (or combination thereof), sling-load cargo operations and/or related services. All phases of this project are anticipated to take 63 working days to complete (11/30/2020 – 02/12/2021), 74 calendar days.

1.1.2 Aircraft Capability.

The Contractor shall have the capability to provide the following aircraft to support this requirement.

Table 1. Aircraft Specifications/Requirements.

Aircraft

Type Quantity

Estimated

Days

Estimated

Maximum

Working Hours

Description (include service type, e.g. slingload, etc)

Light

Lift

Rotary

Wing

1 61 days 228 hrs

- Ability to carry no less than 4 passengers

(PAX) (depending on cargo load)

- 300 nautical miles (NM) unrefueled range

- Maximum lift requirement of up to 1,200 lbs. (PAX and/or internal or external slingload cargo)

- Configurable compartment (ability to add/remove seats for more PAX or cargo)

Medium

Lift

Rotary

Wing

1 6 days 32 hrs

- 300 NM unrefueled range

- Maximum lift requirement of up to 7,000 lbs. (slingload transport of material/equipment such as skid steers, air compressors, and batteries)

Heavy

Lift

1 6 days 42 hrs

- 300 NM unrefueled range

- Maximum slingload lift requirement of up to

15,000 lbs. (transport material/equipment

Rotary

Wing such as pre-cast concrete footings and ISO-containers)

1.1.3 Location Specific Scope. The Contractor shall base their aircraft at the location of their choosing within a reasonable distance from the project site as approved by the Contracting Officer (KO). The staging area for this project and its phases is located at grid coordinates 3680 2214. The Government will not provide storage and/or maintenance facilities for aircraft and equipment at the staging area or any other location.

1.1.4 Air Carrier Information. All aircraft utilized must be licensed, operated, and maintained in accordance with all applicable rules, regulations, and standards of the Federal Aviation Administration (FAA), Federal Aviation

Regulations, Department of Transportation (DOT), and Department of Defense (DoD), giving particular attention to the responsibility of the air carrier to perform air transportation with the highest degree of safety. The carrier shall have a current FAA authorization certificate to operate over routes and into the airfields specified under Instrument

Flight Rules (IFR) and/or Visual Flight Rules (VFR) conditions.

1.2 Personnel Requirements.

1.2.1. Operations Contact. The Contractor shall designate principal point(s) of contact (POC) to interface with the

KO and the Contracting Officer’s Representative (COR). The Contractor is responsible for ensuring the POC information remains current throughout the life of the contract. The POC information shall be provided in writing to the KO and COR within five business days after contract award. At a minimum, the Contractor shall provide a 24-hour contact number, email address, business address, and hours of operation for the POC. The Contractor shall also identify Emergency POC(s), if different than primary POC(s), by name, email address, and mobile number to be available 24-hours a day, 7-days a week, to resolve all maters in performance of this requirement.

1.2.3 Contractor Personnel Termination/Replacement. The Contractor shall notify the KO and COR within 24 hours of the employment or termination of any on-site Contractor personnel by providing an updated list of personnel which includes, at a minimum, the following information: name (last, first, middle initial), primary position title, and date of on-site employment or termination.

1.2.4 Removal from Worksite. If the KO or COR notifies the Contractor that the employment or the continued employment of any contract employee is prejudicial to the interests or endangers the security of the United States of

America, that person shall be removed, barred from the worksite and replaced at Contractor expense. The

Contractor shall make any changes necessary in the appointments.

1.2.5 Aircrew. The Contractor shall provide at least one aircrew (including one pilot, aircraft loadmaster and rigger) for each primary aircraft assigned. Aircraft loadmaster and rigger can be one individual who possesses the appropriate qualifications and certifications for both dueies. The Contractor’s aircrew members shall be trained, qualified,maintain proficiency and comply with duty day requirements in accordance with the applicable Federal

Aviation Regulation (FAR) Part 135 (14 Code of Federal Regulations (CFR) Part 135).

1.2.6 Aircraft Maintenance Personnel. Contractor’s aircraft maintenance personnel shall be trained, qualified, and maintain proficiency in accordance with Federal Aviation Regulation Part 135 (14 CFR Part 135), and 32 CFR Part

861 (“Department of Defense Commercial Air Transportation Quality and Safety Review Program”).

1.3 DoD Approval and Additional Standards. In accordance with Department of Defense Instruction (DoDI)

4500.53, the Contractor operating the aircraft must be an approved DoD air carrier, as determined by the

Commercial Airlift Review Board (CARB), and must maintain this approval throughout the performance of this contract. The Contractor shall comply with all Federal Aviation Administration (FAA) requirements, and with all

DoD additional standards including those established by DoD Commercial Airlift Division (i.e., the Air Mobility

Command (AMC)/A3B) as published on the following website: https://www.amc.af.mil/Home/AMC-Commercial-

Services/ .

1.4 Aircraft Condition. Every aircraft shall be certified as airworthy by trained and certified mechanics for that specific airframe. Airworthiness certificates shall be made available to the Government upon request. The https://www.amc.af.mil/Home/AMC-Commercial-Services/ https://www.amc.af.mil/Home/AMC-Commercial-Services/

Government is entitled to perform an independent assessment of the condition of any contract aircraft at any time.

The Government may also request that an independent assessment of any aircraft used in performance on this contract be conducted at contractor expense. The Contractor will make available, at the KO’s request, a copy of each aircraft’s maintenance history. The Government reserves the right to inspect aircraft, maintenance records, and employee records at any time.

1.4.1 Alternate/Spare Aircraft. Alternate aircraft are not required under this contract nor is the Government under any obligation to accept performance by alternate aircraft. The KO has sole discretion in permitting the contractor to change/add alternate aircraft.

1.4.2 Aircraft Replacement or Addition. Throughout the period of performance, a Contractor may request approval from the KO to replace an aircraft with an aircraft of similar capability. Replacement aircraft shall be DoD approved prior to operation. Contractor shall submit a written notification to the KO detailing the reason for the change or addition.

1.4.3 Maintenance. The Contractor shall perform both scheduled and unscheduled maintenance. Maintenance may occur on US Military installations with prior coordination and the express permission of the Government. The

Contractor will provide all parts, tools and equipment, labor, and expertise necessary to complete required maintenance tasks. Maintenance downtime will be coordinated between the Contractor and the COR. The

Contractor shall provide a timetable for scheduled maintenance and an estimated completion time for unscheduled maintenance. Preventive maintenance service schedules for aircraft shall conform to manufacturers recommended servicing intervals. All maintenance shall comply with the air carriers Federal Aviation Administration approved

Continuous Airworthiness Maintenance Program (CAMP).

1.4.4 Aircraft Safety Equipment. All aircraft will maintain serviceable first aid kits, fire extinguishers, and all aviation life support equipment required to be maintained in accordance with applicable FAA and DoD standards.

The aforementioned items shall be inspected for serviceability in accordance with manufacturer’s inspection/serviceability instructions. Documentation of the inspection shall be provided to the COR or designated

Government representative within 10 calendar days of the inspection. Aircraft must be configured with Ultra High

Frequency (UHF) and Very High Frequency (VHF) radio, and Global Positioning System (GPS). A Blue Force

Tracker or similar real-time satellite device and Emergency Locator Transmitter (ELT) are required on each aircraft compatible with the users search and rescue capabilities. All aircraft must have two-way satellite or long-range communication capabilities while in-flight. It is the operator’s responsibility to provide additional survival equipment appropriate for the environment and mission they are operating in that meets or exceeds Federal Aviation

Regulation Part 135.

1.4.5 Intransit Visibility and Communication. Contractor will be required to provide to the local Air Operations

Center (AOC), or Command Post (CP), departure and arrival notifications at all locations via phone, radio

(UHF/VHF), or satellite phone. Two-way inflight communication with the local AOC or contractor in-country operations throughout the assigned AOR is highly desirable. If communication is not available, contractor will provide information to local AOC either in flight or upon return to home station. When operating missions, the contractor’s operations center will be required to maintain voice communications with the local AOC.

1.4.6 Safety Barriers. All passenger and cargo doors used for loading and unloading of passengers, baggage, and cargo aboard contract aircraft shall be equipped with a safety barrier at chest or waist level. The safety barrier shall be in place when the cabin or cargo door is open except when actually on-loading or off-loading passengers/cargo or when loading stairs are positioned.

1.4.7 Aircraft Markings. Authorized marking on all aircraft will be the Contractor’s name on each side as well as required markings such as tail numbers. Other identifying marking, such as “UN”, “ISAF”, “NATO” or “SFOR” are not allowed and shall be removed. It is in the best interest of all parties that aircraft not be painted in a color that is close to military colors and paint schemes. Any color other than white should be reviewed and approved by the

Government prior to deployment.

1.5 Mission Requirements. The Contractor shall coordinate all airlift movements with the Government prior to any mission. Missions will be scheduled at least twenty-four (24) hours in advance, unless otherwise agreed to by the

Contractor and the Government. Once this schedule has been established the Contractor should remain flexible to accept changing timelines and routes, within normal crew duty day limitations, in order to meet mission requirements. Weather and aircraft maintenance will be considered when scheduling missions.

Projected schedule for Light Lift Rotary Wing:

PROJECT PHASE START to END DATES TOTAL WORKING DAYS

Mobilization Date: 11/30/2020 to 11/30/2020 1

Site Development Phase: 12/01/2020 to 02/ 11/2021 61

Demobilization Date: 02/12/2020 1

Projected schedule for Medium Lift Rotary Wing:

Mobilization Date: 11/30/2020 to 11/30/2020 1

Site Prep Phase: 12/01/2020 to 12/03/2020 3

Demobilization Date: 12/04/2020 1

Mobilization Date: 01/19/2021 to 01/19/2021 1

Tower Installation Phase: 01/20/2021 to 01/22/2021 3

Demobilization Date: 01/23/2021 1

Projected schedule for Heavy Lift Rotary Wing:

Mobilization Date: 12/17/2020 to 12/17/2020 1

Container Installation Phase: 12/18/2020 to 12/23/2020 6

Demobilization Date: 12/24/2020 1

Notes: 1. All dates provided are estimates.

2. Mobilization/Demobilization dates can shift with the period of performance, 30 November 2020-12 February

2021. Project is not expected to run past 12 February 2021.

1.5.1 The Contractor, project manager, or aircrew shall assess the current situation (weather, terrain, crew and experience) prior to launch to make an accurate risk assessment before performing a mission. Pilots shall make all flight related decisions and are responsible for flight safety. The Contractor may refuse any mission for safety reasons. However, the mission must be rescheduled and flown as agreed to by the Government and Contractor.

1.5.2 Aircrew shall remain on flight plan filed unless re-tasked or deviation for safety of flight is required.

1.5.3 Aircraft may be required to land and operate at austere airports/airfields/landing zones with minimal Air

Traffic Control (ATC), security and/or night lighting. The Contractor shall provide its own security for equipment at these location types. The Government does not provide any security for equipment at these types of locations.

1.5.4 Flying in Controlled Airspace. All contract flights shall fly over established airways, domestic, and in controlled airspace. Exceptions may be made to this requirement where it is impractical to follow airways or fly in controlled airspace, provided airways are intersected at the first practical point and departed at the last practical navigational fix near destination, or when area controller established airways do not exist within a flight information region. Economic considerations will not justify deviation from this procedure.

1.6 Airfield Suitability and Restrictions/Certifications Airfields.

1.6.1 Contractors are reminded that airfield restrictions exist at certain military and commercial airfields worldwide.

An Air Mobility Command (AMC) publication, entitled “Airfield Suitability and Restrictions Report” identifies airfield restrictions specifically for AMC aircrews. This publication also lists “certification airfields”, which are the equivalent to FAA-designated “special airfields.” These fields have unique airfield hazards and operating procedures requiring increased awareness and familiarity by aircrews. Contractors can obtain the current edition of this publication, at no cost, by contacting the following office:

HQ AMC/A3AS TELEPHONE: (618) 229-3112

402 Scott Drive Unit 3A1 FAX: (618) 256-2019

Scott AB IL 62225-5302

1.6.1.1 This publication is prepared for use by AMC aircrews and is made available to contractors for advisory purposes only.

1.7 Aircrew Mission Capable. Contractors shall ensure air crews are adequately briefed on all restrictions at applicable airfields, including certification airfields, and properly trained before performing any DoD contract missions into these airfields.

1.8 Landing at Military Installations.

1.8.1 Extended Parking at Military Airfields. All parking must be coordinated in advance of projected arrival with air field personnel. Any request for extended parking will be reviewed on an individual basis by airfield personnel.

Extended parking may be granted for the following (but not limited to) reasons:

1.8.1.1 Positioning of aircraft in advance of time stipulated in the contract in order to prevent delays due to weather, crew limitations, or other reasons.

1.8.1.2 Back-to-back scheduling of aircraft for a follow-on Government contracted missions.

1.8.1.3 Other programmed mission requirements.

NOTE: Aircraft programmed or scheduled for subsequent commercial operation on termination of a military mission at a military station will not be granted extended parking privileges.

1.8.2 Contractor shall comply with Maximum on Ground (MOG) restrictions and safety considerations, unless deviation is approved by the Government or controlling airfield authority.

1.8.3 Operating Hour Restrictions. Carriers shall adhere to, and/or obtain their own waivers to all operating hour restrictions.

1.9 Weather Factors. The Contractor should return to the point of origin (hub) or nearest safe location, until the weather improves. Missions not completed due to poor weather will be rescheduled at the satisfaction of the

Government. For the Contractor to refuse to fly a transport mission due to marginal weather conditions, the weather must be such that the ceiling is below 700 feet and visibility less than two nautical miles. Ceiling restrictions are subject to change as dictated by threat analysis. Contractor shall comply with all weather considerations herein.

1.10 Authority to Leave Unsafe Aircraft. According to Section 2640, Chapter 157, 10 US Code (10 U.SC.

§2640), the following determinations shall apply with regard to the authority to leave unsafe aircraft:

1.10.1 Determinations to Leave Unsafe Aircraft. In accordance with DoDI 4500.53, the senior military officer on board a chartered commercial aircraft may order members of the Military Services to leave the aircraft when, in the absence of a representative of the contracting agency, that officer determines a condition exists on the aircraft that may endanger the safety of the members. Should this occur, the COR will immediately alert the next higher headquarters with a copy to the Contracting Office. In cases where such deficiencies exist, only the FAA representative and the Contractor have the authority to ground the commercial aircraft in question.

1.11 Recovery. The Contractor is responsible for recovering disabled, damaged, or destroyed aircraft under its control. The US Government may, at its discretion, assist if resources and time are available. Any recoverable cargo will be returned to the Government.

1.12 Payload Variations. Variations in payload on a mission-by-mission basis may be required due to changes in altitude and weather.

1.13 Operational Readiness (OR), Reliability, Cost Calculations, and Support.

1.13.1. Maintenance. The Contractor shall perform both scheduled and unscheduled maintenance. Maintenance may occur on US Military installations with prior coordination and the express permission of the Government. The

Contractor will provide all parts, tools and equipment, labor, and expertise necessary to complete required maintenance tasks. Maintenance downtime will be coordinated between the Contractor and the customer or COR.

The Contractor shall provide a timetable for scheduled maintenance and an estimated completion time for unscheduled maintenance.

1.13.2 Mission Capable. The aircraft shall be full mission capable (FMC) for the full duration of the period of performance. Non-mission capable (NMC) is defined as any day the aircraft cannot fly due to carrier-controlled reasons (e.g. maintenance, operations, and crew availability). If any aircraft is not available for an entire day, no daily service rate for that aircraft will be paid. Any day an aircraft is NMC for carrier-controlled reasons, including lack of available aircrew, no daily service payment will be made for that day. If an aircraft is reported as FMC and launches on a tasked sortie but returns to base for carrier-controlled reasons without completing a mission leg, and without completing any legs for that day, then the aircraft will be considered NMC for that entire day. An airframe is not to be considered available unless both the airframe is FMC and the aircrew is available at the same location as the aircraft. The aircrew must be listed on the daily Sortie Report, co-located (same hub) with the aircraft, and be in stand-by status (i.e. immediately available) for the entire flight time within any 24 hour period under 14 CFR

135.267, for the airframe to be considered FMC. If there are extenuating circumstances, the KO can waive NMC days on a case-by-case basis.

In the event a cargo hook becomes inoperable, the aircraft will be listed as NMC on the daily Situation Report

(SITREP) and detail cargo hook inoperability as the reason. Each day the cargo hook is inoperable, no daily service rate for that aircraft will be paid. If a cargo hook becomes FMC after 0800 local time, no deduction from the daily service rate will be made as long as the Government is able to safely utilize the cargo hook on that aircraft before all flying/missions are completed for the day.

1.13.2.1 Non-Mission Capable (NMC) Repair Plan. In the event an aircraft becomes NMC, the Contractor is required to submit a repair plan (timeline) outlining the extent of the repairs and when the aircraft will become

FMC. This plan should be submitted to the Contracting Office and the COR within 48 hours after the aircraft becomes NMC. Extensions to the 48 hours can be granted on a case-by-case basis.

1.13.3 Schedule Reliability Requirements. Contractor-controllable delays exceeding 3 hours will be counted as one

(1) delay. A contractor-controllable delay of one hour or less will not be counted in the schedule reliability.

1.14 Reporting. Unless otherwise stated, all reports shall be submitted to the Contracting Office.

1.14.1 Aircraft Identification Report. The Aircraft Identification Report shall be provided in writing to the KO and

COR within five business days after contract award. At a minimum, the Contractor shall provide the following:

Aircraft make and model

Number of engines

Tail number

IFR capability

If applicable, number of PAX

Maximum cargo weight allowance

Internal Payload: Maximum Payload and Range

If applicable, External Slingload: Maximum Payload and Range

1.14.2 Accident Reporting and Safety.

1.14.2.1 Notice of Accidents or Incidents – All Carrier Operations (both Commercial and Government customers):

When a Contractor’s aircraft is involved in any accident, DoD or otherwise, the Contractor shall transmit the information in paragraph #1-8 below to Headquarters AMC, via HQ AMC/A3B, Scott AFB IL (618) 229-4801/DSN

779-4801 or the HQ AMC/A3B Safety Manager at 618-229-2106/DSN 779-2106 and to the KO and the COR.

Accident and incident information shall be provided to HQ AMC, the KO and the COR by the most expeditious means available. Accidents and incidents are defined in 49 CFR Part 830.

1. Contractor and trip number

2. Aircraft type and number

3. Date and time of the accident or incident

4. Last point of departure and point of intended landing of the aircraft, as applicable

5. Nature of the accident or incident and extent of known damage to the aircraft, if any

6. Total number of crewmembers and passengers on board

7. Number of injured and fatalities aboard the aircraft

8. Condition of baggage or Government-owned material and/or cargo, if any, on board

1.14.3 Aircraft Medical Incidents. Report all aircraft medical incidents in flight, or while passengers are under the control of the pilot in command, to the first available COR, at the next enroute station for in flight incidents, or the station where the incident occurs. On the next business day, notification shall also be made to the KO, via telephone or email.

1.14.3.1 An event involving death, near death or major permanent loss of function requires immediate notification to

Contracting Office.

1.14.4 Hazard Reporting. The Contractor shall report any condition involving cargo that constitutes a hazard to operations, the Contractor, and airport/airfield/landing zone safety personnel. This report should contain the following information: location; date and Greenwich Mean Time (GMT); nomenclature of cargo (proper shipping name of hazardous cargo); shipper’s organization/unit and name of cargo representative; destination of cargo;

Transportation Control Number (TCN) or bumper/increment number; facts and circumstances. Report this information to the COR.

1.14.5 FAA Violation Reporting. The Contractor shall report to the KO within 24 hours of receiving any notification from the FAA regarding a violation, assessment of a penalty, or of any enforcement action against the company, management or its pilots.

1.15 Contractor Acquired Insurance. In accordance with FAR 52.228-5, Insurance on a Government Installation, the Contractor, at its own expense, shall acquire and thereafter maintain the following kinds of insurance with respect to performance under this contract:

(a) Workmen’s Compensation Insurance, or equivalent workmen’s compensation coverage, as required or prescribed by law, with minimum employer liability of $100,000 for accidental bodily injury or death, or for occupational disease.

(b) Comprehensive General Liability with minimum limits of $500,000 per occurrence for bodily injury.

(c) Comprehensive Automobile Liability with minimum limits of $200,000 per person and $500,000 per accident or occurrence for bodily injury, and $20,000 per occurrence for property damage.

(d) Liability for bodily injury or death of aircraft passengers: Coverage shall be at least $200,000 per person and $500,000 per occurrence for bodily injury, other than passenger liability, and $200,000 per occurrence for property damage. Coverage for passenger liability body injury shall be at least $200,000 multiplied by the number of seats or passengers, whichever is greater.

The Contractor shall maintain a copy of all proofs of required insurance and shall make copies available to the

Contracting Officer upon request.

2. PERFORMANCE REQUIREMENT SUMMARY

Performance Objective PWS Paragraph Performance Threshold

Operational Readiness 1.14 and its subparagraphs No more than one aircraft determined NMC for a 24-hour period during the performance window.

Sling load Readiness 1.14.2 No more than one cargo hook determined NMC for a 24-hour period during the performance window.

Contractor shall maintain Passenger

Manifest until Mission is Complete.

Contractor shall not allow personnel who are not manifested, or unauthorized cargo on board.

4.2.1 98% of Missions Daily

Maintain accurate reports 1.15 and its subparagraphs

4.6

98% Accurate, Complete and

On-time

3. GOVERNMENT FURNISHED PROPERTY (GFP) AND SERVICES (GFS).

3.1 Intelligence and Weather Reports. Contractor will provide weather reports and Government will provide relevant events occurring at training ranges that might impact flight patterns to hilltops of interest.

3.2 Base Transportation. Base transportation (bus or shuttle) will not be available at any locations. The

Contractor may provide its own flight line (ATV or Gator-like) vehicles upon approval and will obey all published regulations, licensing and dispatching requirements regarding vehicle operations.

3.2.1 The Contractor is required to register all vehicles per the relevant MCAGCC policy and regulation. The

Contractor shall provide insurance, maintenance, and all costs associated with vehicle use for contractor furnished vehicles.

3.3 Loading and Unloading. The Government may provide, at its discretion, loading and unloading assistance at all locations. The Contractor shall be prepared to furnish all personnel, slings, and nets to sling external loads under helicopter.

3.4 Range Safety and Survival. The Contractor shall identify to the COR all contractor personnel who will work aboard MCAGCC, to include pilots, and, if applicable, the contractor’s subcontractor personnel. The COR shall arrange for these personnel to attend a MCAGCC range safety and survival brief presented by the MCAGCC Range

Management office.

3.5 Radios. As required by the mission, the COR shall provide three (3) government-owned and government-operated handheld repeated radios to the contractor’s fuel truck operator for use while the contractor is operating aboard MCAGCC. The radios shall remain under the permanent control/custody of the Government.

3.6 Expenses.

3.6.1 The Contractor’s crew is required to remain overnight within 75 miles of the staging area during periods of mobilization. Per diem and travel expenses shall not be separately priced or reimbursed by the Government. Food and lodging arrangements are the Contractor’s responsibility.

3.6.2 Fuel. All fuel costs shall be not be separately priced or reimbursed by the Government. The Government will not supply fuel and will not supply fuel systems or equipment to support contract rotary wing operations. Fuel consumed as a result of the Contractor determining to replace, swap out aircraft or aircrew shall not be reimbursed by the Government.

4. CATALOG OF AIRLIFT SERVICES.

4.1 Rotary Wing Services. All aircraft will be operated by a fully qualified crew rated in the type, design, and series for the aircraft being flown.

4.1.1 The Contractor shall provide aircraft that are rotary wing and fully instrumented/equipped to fly under

Instrument Flight Rules and/or Visual Flight Rules. Aircraft must be listed, maintained and operated in accordance with the air carrier’s Federal Aviation Regulation (FAR) 135 certificate.

4.1.2 Payment Calculations:

4.1.2.1 Blade Hours. Blade hours are calculated to the tenth of an hour from the moment the aircraft moves under its own power for intended flight at the hub until the aircraft is powered off for any reason, and blade hour time resumes when the aircraft moves under its own power for intended flight until the aircraft power down at the hub at completion of a mission. Blade hour calculations include taxi time and time spent loading aircraft while engine(s) are running. Aircraft start-up and spool-down time; flight time to/from the tie down area; anytime the engines are shut down and maintenance flights are not included in blade hour calculations. Aircraft that return to base for contractor-controlled reasons will only be paid for completed mission legs where the government was able to move cargo or passengers. Contractor flights not directed by the Government are non-billable (e.g., flights to an off-site maintenance location, other carrier-internal missions). When entering hours or tenths of hours on forms and reports, a digit is to be entered on either side of the decimal even it if is a zero. (e.g. 2.0 when entering two full hours of flight time, or 0.7 when entering 38 minutes of flight time.)

4.4.2.1.1 Fractional Blade Hours. Fractional blade hours shall be determined using the following table.

Minutes Parts of hour

0 0.0

1-6 0.1

7-12 0.2

13-18 0.3

19-24 0.4

25-30 0.5

31-36 0.6

37-42 0.7

43-48 0.8

49-54 0.9

55-60 1.0

4.2 Passenger Service. Transportation authorized for passengers with baggage.

4.2.1 Passenger Manifests. The Government will provide the carrier with a list of passenger names and actual weights, if scales are available. The Carrier shall accept only those passengers whose names appear on the passenger list and those designated by the KO or Contracting Officer’s Representative (COR) to perform enroute surveillance or observation checks on the flight. Number of passengers will be determined by cargo, distance, altitude, and temperature at the desired location. A copy of the passenger manifest will be left with the appropriate ground personnel at the departure point. The Contractor will maintain passenger manifest until mission is complete.

Inspectors’ (Contract Administrators (CA)) names and weights shall be included on the manifest.

4.2.2 Planning Weight. When available, the Contractor shall use DoD provided weights for planning purposes. In the absence of DoD provided planning weights, the Contractor shall use 300 pounds (175 pounds per passenger plus

125 pounds PAX equipment) for planning purposes. The Contractor is ultimately responsible to determine passenger weight and cargo weight. The Pilot in Command is responsible for determining the safe loading limits and cargo/passenger combinations.

4.2.3 Locations without Calibrated Scales. Calibrated scales are not available, the Government will provide the carrier with a passenger manifest which includes the interrogated weight of each passenger in conjunction with the following additives to determine the total weight of each individual: PAX equipment: 20 pounds (unless determined, through interrogation, that the carry-on exceeds 20 pounds, then an upward adjustment must be made to accommodate the extra weight). All items transported in the cargo compartment of a contractor aircraft shall be weighed.

4.2.5 Passenger Safety. All aircraft will utilize appropriate aviation restraining devices in order to ensure the safety transport of passengers. Contractor is not authorized to perform seats-out operations, except for emergency situations for immediate evacuations where loss of life, limb, or eyesight missions dictate. Contractor is required to provide all aviation life support equipment necessary to transport all passengers.

4.3 Cargo Service. Transportation of authorized cargo.

4.3.1 Cargo Service. The Contractor will deliver cargo from origin to destination. The Contractor will be notified by the Government prior to loading of any cargo of a hazardous, flammable, or explosive nature and any such cargo shall be properly documented and certified as per applicable military transport standards.

4.3.2 The Contractor will prohibit cargo that has not been properly manifested from flying on the aircraft.

4.4 Passenger and Cargo Combination (COMBI) Service. Services include the transportation of authorized passengers, baggage and cargo on same aircraft.

4.4.1 Combination services shall be provided in accordance with Passenger and Cargo requirements identified in section 4.2 and through 4.3 above.

4.4.2 The Contractor shall have FAA approval to operate in a combination mode.

4.4.3 Comply with applicable FAA requirements including cargo nets and placement of passengers.

4.5 Sling load. Cargo will be prepared for sling load delivery per the pre-approved Concept of Operations

(CONOP). The Contractor is responsible for meeting all sling load requirements IAW Federal Aviation Regulation

133 and ensuring the external load is safe for transport.

4.6 Daily SORTIE Report. The Sortie Report will be in a Microsoft Excel format and include, at a minimum, a row entry for each calendar day (one row entry per aircraft), aircraft type, registration number, aircraft status, aircrew names and location, starting hub, ending location, total passengers carried, cargo carried (in pounds), mail carried (in pounds), flight hours flown, a comment block, fuel added (in gallons), total legs flown, sling loads (if applicable), and all intermediate locations flown. Each row will include all of this information per day whether the aircraft flew or not. The comment block will be used to annotate reasons for not flying or mission abort, (e.g.

maintenance, weather, no tasking, etc.). The report will also include cumulative totals, as well as filterable totals by selected date range and additional selectable column filters. The contractor shall provide these records to the CO and COR via email at the end of the mission day.

5. SECURITY. (Physical, Personnel, Information, Antiterrorism/Force Protection (AT/FP) and Industrial)

5.1 General Security Information. The daily work associated with this PWS is at the unclassified level.

5.2 MCAGCC Access/Security Requirements-Contractor and Contractor-Employee Access Conditions.

5.2.1 Access Procedures Are Mandatory: The Contractor shall comply with all current access procedures throughout all performance periods under this contract. Changes to these procedures shall not constitute grounds for

Contractor claims or request for equitable adjustment. All contractor employees are required to obtain business access or permanent business access. Daily access procedures must not be used to circumvent background check requirements outlined below. Attempts to improperly use daily access procedures may result in denial of access to the involved employees.

5.2.2 Business Access: Required for contractor employees requiring access for periods from one day to one year.

Submit the following:

A valid form of Federal or state government I.D (Driver licenses and identification cards marked not valid for federal purposes, federal limits may apply, or any other similar language will not be accepted by DoD). With “federal limits apply” type DL/ID, must have secondary form of US government issued, photo identification.

Enhanced driver licenses (EDL) are state-issued driver licenses issued in accordance with reference (b) that denotes identity and U.S. citizenship. EDL can be used as proof of identity for access of DoD installations and facilities. EDL’s are marked as an Enhanced Driver License and bear a small red, white and blue U.S. flag logo on the front of the card

If driving a motor vehicle, a valid driver's license, vehicle registration and proof of insurance in the drivers name must be presented.

Any notarized documents must be originals. Copies will not be accepted.

Proof of employment on a valid Government contract (e.g., a letter from the prime contractor including contract number and term).

Proof of an employee background check conducted within the past year covering the previous two years. Contractor employee background checks are conducted at contractor expense. The background check:

(a) must establish the employee's citizenship or legal alien status. Acceptable documents include birth certificate, Immigration and Naturalization Service (INS) forms and passports.

(b) must include proof of a criminal records check from the county or state where the employee resided for the previous two years (or length of legal residence for foreign nationals in the

U.S. for less than two years).

(c) will be subject to Government verification via the FBI National Crime Information Center

(NCIC) Interstate Identification Index (III). If the background check is selected for verification, the employee will be required to submit fingerprint records to the FBI

Automated Fingerprint Identification System (AFIS) database.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .