2. Brand Name Justification W50S6V21Q0017.pdf

PDF 1 MB Posted

Attached to
Airfield Lighting Regulators Federal contract opportunity
Solicitation number
W50S6V21Q0017
Issued by
Department of the Army Colorado Army National Guard

View the file

Other files for this federal contract opportunity

Other files attached to Airfield Lighting Regulators, newest first.
File Type Posted
Combo Synopsis-Solicitation W50S6V21Q0017.pdf PDF
1. Salient Characteristics W50S6V21Q0017.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Single Source Justification (Simplified Acquisition)

Section A: General Contract Information

Contracting Activity:

Requesting Activity:

Purchase Request/

Identification Number:

Project/Program Name: Estimated Contract Cost

(including Options):

Section B: Description of the Supplies/Services Required

Provide a brief non-technical description of the supplies/services to be acquired.

Section C: Justification for Soliciting from a Single Source

Provide a clear/concise statement of the facts justifying the award of a single source or brand name contract. For example:

Section D: Efforts to Obtain Competition

Document efforts to obtain competition. For example, did market research identify any other company(s) that can provide your required product or service or was a sources sought synopsis issued by contracting to try to find another source?

Section E: Steps to Preclude Future Single Source Awards

Provide a statement of actions to be taken by the requiring activity to preclude the necessity for future sole source acquisition of the same supplies/services (e.g., conducting a market survey to determine potential future sources).

Section F: Request ing Act iv i ty Acknowledgment

As evidenced by their signature on the Single Source Justification Document, the technical and/or requirements personnel have certified that any supporting data contained herein, which is their responsibility, is both accurate and complete to the best of their knowledge.

Date Typed Name, Rank/Grade of Requesting Activity Commander Signature of Requesting Activity Commander

Section G: Contracting Officer's Determination

I have determined, in accordance with FAR 13.106-1(b)(1), that the circumstances of this contract action deem only a single source is reasonably available.

Date Typed Name and Rank/Grade of Contracting Officer Signature of Contracting Officer

Purchase Request Identification Number: F6G3CE1145AW01
ProjectProgram Name: Replace Airfield Regulators
Estimated Contract Cost including Options:
Provide a brief nontechnical description of the suppliesservices to be acquired: ADB Safegate Airfield Lighting Regulators - Model CHF2070-5300 - 2 each.
Document efforts to obtain competition For example did market research identify any other companys that can provide your required product or service or was a sources sought synopsis issued by contracting to try to find another source: A review of FAA Advisory Circular 150/5346-53d list confirms ADB Safegate is the only FAA Approved 70KW Constant Current Regulator
Provide a statement of actions to be taken by the requiring activity to preclude the necessity for future sole source acquisition of the same suppliesservices eg conducting a market survey to determine potential future sources: Future purchases will review the latest FAA approval listing. If there are multiple contractor's in the future, requirement will be competed between those contractors that provide approved equipment.
Date: 5/21/21
Typed Name and RankGrade of Contracting Officer: William N. T. Smith, Lt Col/O-5
Signature of Contracting Officer:
Date_2: 6/4/21
Typed Name and RankGrade of Contracting Officer_2: JACOB I. GEROUX, 1st Lt/O-2
Signature of Contracting Officer_2:
Contracting Activity Requesting Activity: 140 MSG/MSC
Requesting Activity: 140 CES/CEN
Provide a clear/concise statement of the facts justifying the award of a single source or brand name contract:
For example:: All airfield lighting equipment used in the United States must be FAA approved. ADB is the only manufacturer of 70KW regulators that are FAA approved. The FAA lists approved regulators and sizes in FAA Advisory Circular 150/5346-53d dated Mar 2021. The requested regulators are replacements for the existing regulators.
2021-05-21T09:07:22-0600
SMITH.WILLIAM.NATHANTERR.1052248600
2021-06-04T07:42:56-0600
GEROUX.JACOB.ISAAC.1290213025