2. Brand Name Justification W50S6V21Q0017.pdf
PDF 1 MB Posted
- Attached to
- Airfield Lighting Regulators Federal contract opportunity
- Solicitation number
- W50S6V21Q0017
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Combo Synopsis-Solicitation W50S6V21Q0017.pdf | ||
| 1. Salient Characteristics W50S6V21Q0017.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Single Source Justification (Simplified Acquisition)
Section A: General Contract Information
Contracting Activity:
Requesting Activity:
Purchase Request/
Identification Number:
Project/Program Name: Estimated Contract Cost
(including Options):
Section B: Description of the Supplies/Services Required
Provide a brief non-technical description of the supplies/services to be acquired.
Section C: Justification for Soliciting from a Single Source
Provide a clear/concise statement of the facts justifying the award of a single source or brand name contract. For example:
Section D: Efforts to Obtain Competition
Document efforts to obtain competition. For example, did market research identify any other company(s) that can provide your required product or service or was a sources sought synopsis issued by contracting to try to find another source?
Section E: Steps to Preclude Future Single Source Awards
Provide a statement of actions to be taken by the requiring activity to preclude the necessity for future sole source acquisition of the same supplies/services (e.g., conducting a market survey to determine potential future sources).
Section F: Request ing Act iv i ty Acknowledgment
As evidenced by their signature on the Single Source Justification Document, the technical and/or requirements personnel have certified that any supporting data contained herein, which is their responsibility, is both accurate and complete to the best of their knowledge.
Date Typed Name, Rank/Grade of Requesting Activity Commander Signature of Requesting Activity Commander
Section G: Contracting Officer's Determination
I have determined, in accordance with FAR 13.106-1(b)(1), that the circumstances of this contract action deem only a single source is reasonably available.
Date Typed Name and Rank/Grade of Contracting Officer Signature of Contracting Officer
| Purchase Request Identification Number: F6G3CE1145AW01 |
| ProjectProgram Name: Replace Airfield Regulators |
| Estimated Contract Cost including Options: |
| Provide a brief nontechnical description of the suppliesservices to be acquired: ADB Safegate Airfield Lighting Regulators - Model CHF2070-5300 - 2 each. |
| Document efforts to obtain competition For example did market research identify any other companys that can provide your required product or service or was a sources sought synopsis issued by contracting to try to find another source: A review of FAA Advisory Circular 150/5346-53d list confirms ADB Safegate is the only FAA Approved 70KW Constant Current Regulator |
| Provide a statement of actions to be taken by the requiring activity to preclude the necessity for future sole source acquisition of the same suppliesservices eg conducting a market survey to determine potential future sources: Future purchases will review the latest FAA approval listing. If there are multiple contractor's in the future, requirement will be competed between those contractors that provide approved equipment. |
| Date: 5/21/21 |
| Typed Name and RankGrade of Contracting Officer: William N. T. Smith, Lt Col/O-5 |
| Signature of Contracting Officer: |
| Date_2: 6/4/21 |
| Typed Name and RankGrade of Contracting Officer_2: JACOB I. GEROUX, 1st Lt/O-2 |
| Signature of Contracting Officer_2: |
| Contracting Activity Requesting Activity: 140 MSG/MSC |
| Requesting Activity: 140 CES/CEN |
| Provide a clear/concise statement of the facts justifying the award of a single source or brand name contract: |
| For example:: All airfield lighting equipment used in the United States must be FAA approved. ADB is the only manufacturer of 70KW regulators that are FAA approved. The FAA lists approved regulators and sizes in FAA Advisory Circular 150/5346-53d dated Mar 2021. The requested regulators are replacements for the existing regulators. |
| 2021-05-21T09:07:22-0600 | |
| SMITH.WILLIAM.NATHANTERR.1052248600 |
| 2021-06-04T07:42:56-0600 | |
| GEROUX.JACOB.ISAAC.1290213025 |
File details come from the government source that posted it. Updated .