This document is a Government Furnished Items (GFX) List for the Proliferated Warfighter Space Architecture Tranche 3 Tracking Layer (T3TRK) contract, detailing 46 specific items the government will provide to the contractor at various stages of the project. The items are categorized as Government Furnished Information (GFI), Government Furnished Facilities (GFF), and Government Furnished Services (GFS), and include technical documents, interface control documents, test plans, authorization documents, network access, facility access, and key management materials.
The provision dates for these items are tied to key project milestones such as System Requirements Review (SRR), Preliminary Design Review (PDR), Critical Design Review (CDR), Interoperability Test Readiness Review (OITRR), First Preliminary Systems Review (First PSR), and First Flight Readiness Review (First FRR). Critical technical items include draft and final Interface Control Documents, space vehicle operational capabilities models, synthetic background scenes, program protection plans, launch vehicle interface data, test keys, network specifications, and various authorization and acceptance test plans related to the satellite tracking layer project.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 0 T3TRK - Program Solicitation - Amendment 2 (4-29-25).pdf | ||
| 5 - T3TRK Past Performance Questionnaire (Rev1 - 4-29-25).pdf | ||
| 0 T3TRK - Program Solicitation - Amendment 1 (4-28-25).pdf | ||
| 3 - T3TRK Resume Template Rev 1 (4-28-25).pdf | ||
| 1f - T3TRK DD Form 254 TEMPLATE.pdf | ||
| 3 - T3TRK Resume Template.pdf | ||
| 5 - T3TRK Past Performance Questionnaire.pdf | ||
| T3TRK - Solicitation CoverLtr.pdf | ||
| 1b - T3TRK Schedule of Milestones Payments.pdf | ||
| 1d - T3TRK Data Rights Assertion Table.pdf | ||
| 0 T3TRK - Program Solicitation.pdf | ||
| 1 - T3TRK Other Transaction Agreement (OTA).pdf | ||
| 1g - T3TRK Cost and Software Data Reporting (CSDR) Plan.xls | XLS spreadsheet | |
| 2 - T3TRK Personnel and Facilities Template.pdf | ||
| 4 - T3TRK Personnel Matrix.xlsx | XLSX spreadsheet |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SDA-PS-25-02 Attachment 1e
Attachment 5 – Government Furnished Items (GFX) List
The following list is the initial set of GFX as identified by the Government. Additional items identified by the Contractor and agreed to by the Government will be incorporated at award.
ID Item Provision Date Category 1 Draft Space-to-Ground Interface Control Document (ICD) SRR GFI 2 Draft SUPERNOVA to NOVA ICD SRR GFI 3 Ground Entry Point (GEP) terminal technical specification SRR GFI 4 Space Vehicle (SV) Operational Capabilities and Limitations
(SOCAL) Model Template/Schema
SRR GFI
5 GEP site identification PDR GFI 6 Synthetic background scenes, target trajectories and signatures including data sets from MTF (Master Target File) and DaHT (Defense Against Hypersonic Threats), and KSS (Known Static Source) lists
PDR – 60 days GFI
7 Program Protection Plan PDR GFI 8 SDA Launch Security Plan Guidance PDR GFI 9 Satellite Support Facility identification PDR GFI 10 Technical specifications for Performer enclaves within cloud-based LEOPs SICO Environment
PDR GFI
11 Technical specifications for Performer enclaves within cloud-based LEOPs. SICO Environment
PDR GFI
12 Technical specifications for Performer enclaves within cloud-based GOCO environment
PDR GFI
13 Technical specifications for Performer enclaves within cloud-based Operations PWSA Enterprise Network (OpsPEN)
PDR GFI
14 Final System Key Management Plan (SKMP) Standard PDR GFI 15 SoftSat microservice framework PDR GFE 16 Final Operational Concept Description CDR-2 Months GFI 17 Final Space to Ground ICD CDR-2 Months GFI 18 Final SUPERNOVA to NOVA ICD CDR-2 Months GFI 19 Launch vehicle interface data for plane 1, to include preliminary
CAD models, trajectory analysis, coupled loads analysis, and ICD content
CDR GFI
20 Launch vehicle interface data for plane 2, to include preliminary CAD models, trajectory analysis, coupled loads analysis, and ICD content
CDR GFI
21 Launch vehicle interface data for plane 3, (Option) to include preliminary CAD models, trajectory analysis, coupled loads analysis, and ICD content
CDR GFI
22 Test keys for SVs CDR GFI 23 PWSA Data Management Plan CDR GFI 24 OCT Interoperability Test (OIT) facility identification OITRR – 2 months
GFI
25 OIT testbed Start of OIT GFF 26 OIT plan OITRR GFI
SDA-PS-25-02 Attachment 1e
ID Item Provision Date Category 27 S-Band and Ka-Band Compatibility Test (SKCT) ground support equipment (GSE)
SKCTRR GFS
28 Networking and Encryption Interoperability Test (NEIT) ICD NEIT Readiness Review – 2 months
GFI
29 Networking and Encryption Interoperability Test (NEIT) Plan
NEIT –1 month GFI
30 Networking and Encryption Interoperability Test (NEIT) Procedures
NEIT –1 month GFI
31 Access to LEOPs DevSecOps Environment from Performer facility
STRR – 1 month GFF
32 Flight keys for SVs STRR GFI
33 NOVA Interim Authorization to Test (IATT) First PSR – 6 months
GFI
34 Access to Satellite Support Facility (SSF), including GOCO Environment
First PSR – 6 months
GFF
35 Secret-level non-real-time network connection between Satellite Support Facility and Performer facility (for data transfer purposes)
First PSR – 3 months
GFF
36 GOCO network connection to Performer facility for end-to-end testing with FlatSat/SoftSat
First PSR – 3 months
GFF
37 GOCO network connection to payload processing facility(ies) for end-to-end testing with SV flight units
First PSR GFF
38 Functional Acceptance Test (FAT) Plan First PSR GFI 39 Functional Acceptance Review (FAR) & IR Calibration entry and exit criteria First PSR GFI
40 Frequency authorizations First FRR GFI 41 Space Segment Authorization to Operate First FRR GFI 42 NOVA ATO First FRR GFI 43 Operations SoftSat/FlatSat ATO First FRR GFI 44 Operational Acceptance Test (OAT) Plan Start of OAT – 1 month
GFI
45 Access to Operations Centers (OC-N and OC-S), including Operations Development Environment (ODE) and Operations PWSA Enterprise Network Environment (OpsPEN-OCNE and OpsPEN-OCSE)
First FAR GFF
46 Secret-level non-real-time network connection between OCs and Performer facility (for data transfer purposes)
First FAR GFF
GFI: Government Furnished Information
GFF: Government Furnished Facilities
GFS: Government Furnished Services
File details come from the government source that posted it. Updated .