RD_6130-01-644-6473_Battery_charger.pdf
PDF 8 KB Posted
- Attached to
- Open/Inspect/Report with possible repair Engine accessory Federal contract opportunity
- Solicitation number
- 19DZ102
About this file
BAT.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RD_2920-01-644-6491_Generator.pdf | ||
| RD_2920-01-644-6478-Alternating_Current_Unit.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OVERHAUL DESCRIPTION
FOR OFFICIAL USE ONLY
ITEM NAME CHARGER,BATTERY
STOCK NUMBER 6130-01-644-6473
PART NUMBER PMP245021010
USED ON RBM 45
Items as received by the contractor must be complete and of the proper cited part number. Discrepancies shall be reported to the Coast Guard Contracting Officer.
OVERHAUL REQUIREMENTS:
This item is repairable and can't be sent directly to Victron Energy B.V.
They have to be sent to Mobile Electric Power Solutions Inc. POC: Gary Irwin, Phone 972-864-1015 and he will get an RMA from Victron and send them to one of the service centers for evaluation and pricing
Individually packaged in accordance with MIL-STD-2073-1E Method 10, Cushioning materials, dunnage, blocking and bracing shall be applied as required to protect the items and the enclosing media and restrict the movement of the item within the container
Marking IAW MIL-STD-129R except bar coded IAW ISO/IEC-16388-2007, Code 39 Symbology.
WARRANTY:
X A. Standard Manufacturer's Warranty
B. Item being repaired as an "onboard repair" or a "system stock" item and will be put into inventory. NOT FOR IMMEDIATE INSTALLATION.
Contractor must guarantee item against defects that lead to failure for days after installation for a period of up to two (2) years after delivery to Coast Guard.
GOVERNMENT ACCEPTANCE:
Acceptance will be made at destination by a Government representative.
Acceptance will be contingent upon the representative's verification of no damage in transit, correctness and completeness of order and contractor's conformance to preservation/packaging, packing and marking requirements.
SHELF LIFE CD 0
OVERHAUL DESCRIPTION
PACKAGING AND MARKING FOR SHIPMENT:
X A. Each unit shall be packed individually in it's own wooden box which shall be capable of providing adequate protection to the item during multiple shipments. Mark each box in legible black print lettering with the following information:
NATIONAL STOCK NUMBER
ITEM NAME
PART NUMBER
GOVERNMENT ORDER NUMBER
6130-01-644-6473
CHARGER,BATTERY
PMP245021010
PRESERVATION / PACKAGING:
X A. Each unit shall be individually preserved and wrapped for protection against deterioration for a period of two (2) years minimum.
B. See Attachments
B. See Attachments
And the words: "Coast Guard SFLC Material, Condition "A"
RECOMMENDED SOURCES:
MOBILE ELECTRIC POWER SOLUTIONS INC
2623 NATIONAL CIRCLE
GARLAND, TEXAS 75041
PHONE: 972-864-1015
FAX: 972-271-0635
972 864 1015
WRITTEN BY:
DATE :
STEVEN BOLEN
24 MAY 19
Cost Estimate for Overhaul NOT TO EXCEED:
File details come from the government source that posted it.