RD_2920-01-644-6478-Alternating_Current_Unit.pdf
PDF 43 KB Posted
- Attached to
- Open/Inspect/Report with possible repair Engine accessory Federal contract opportunity
- Solicitation number
- 19DZ102
About this file
ALT
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RD_6130-01-644-6473_Battery_charger.pdf | ||
| RD_2920-01-644-6491_Generator.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OVERHAUL DESCRIPTION
FOR OFFICIAL USE ONLY
ITEM NAME ALTERNATING CURRENT UNIT
STOCK NUMBER 2920-01-644-6478
PART NUMBER 8806124-300
USED ON RBM-45
Items as received by the contractor must be complete and of the proper cited part number. Discrepancies shall be reported to the Coast Guard Contracting Officer.
OVERHAUL REQUIREMENTS:
REVISION No. CHANGE No.
SPECIFICATION OR
STATEMENT OF WORK
COVER SHEET
TITLE
Mobile Electric Power Solutions Generator and Alternating Current Unit (ACU) Repair
REPAIR SPECIFICATION
SPECIFICATION NUMBER
X-XXX-XXXX
ORIGINATED BY Chris Robinson DATE 04/26 Revision (A) ORIGINATED BY Chris Robinson DATE 11/21/16 ___ Revision (B) ORIGINATED BY Chris Robinson DATE 04/10/17 ____ Revision (C) ORIGINATED BY DATE ______ Revision (D) ORIGINATED BY DATE _______ Revision (E) ORIGINATED BY DATE ______
ORIGINATOR'S COMMAND SURFACE FORCE LOGISTICS CENTER (SFLC)
DEPARTMENT/DIVISION SMALL BOAT PRODUCT LINE ENGINEERING CELL
INTERNAL REVIEWER DATE ______
SOWRB APPROVAL DATE
1.0 Scope
1.1 Purpose - This specification is for the repair of non-ready for issue Mobile Electric Power Solutions (MEPS) Generator and Alternating Current Unit (ACU) and for the supply of new MEPS Generators and ACU?s.
The contractor will reassemble the exchanged/remanufactured MEPS generator and ACU with only MEPS OEM equipment.
The generator and ACU shall be tested, preserved and packaged. The generator and ACU (one of a pair) are installed in the U.S. Coast Guard 45 FT. Response Boat Medium (RB-M), and the 42 FT. Near Shore Lifeboat (NLB). The generator and ACU will be provided to the contractor in a reinforced cardboard shipping container.
1.2 Government Furnished Property - This specification sets
forth the requirements for the following equipment:
a. MEPS Generator (SN: 2920-01-644-6491, P/N: 7102252-00, $2761.00
b. Alternating Control Unit (8kW) (ACU) (SN: 2920-01-644-6478, P/N: 8806124- 300, $5304.00
c. Battery Charger (SN: 6130-01-644-6473, P/N PMP245021010, $3547.00
2.0 APPLICABLE DOCUMENTS
2.1 Applicable Documents - The following documents form a part of this specification to the extent specified herein.
2.2 Government Documents
a. Power Generation System With Victron Multiplus 24/5000/120/100 (TP-5795)
2.3 Commercial Documents
a. ANSI/ASQ/ISO Q9001-2000, 13 Dec 2000, Inspection System
b. ANS/ISO/IEC 17025:2005 for Part 1 and ANSI/NCSL Z540.3-2007 for Part 2, General Requirements for Calibration Laboratories and Measuring and Test Equipment.
c. MEPS Inc Generator Test Plan.
d. MEPS Inc Alternating Current Unit Test Plan.
e. ASTM D3951-10 Standard Practice for Commercial Packaging
2.4 Specification Precedence - Any conflict between this
Specification and applicable documents identified in this Specification shall be resolved in this order:
a. This specification
b. Applicable documents
2.4.1 Departure from Specification - Departure from this specification shall not be allowed unless approved by the Coast Guard Contracting Officer.
a. If the contractor finds it necessary to implement change or depart from applicable specifications, they shall request permission.
b. Request by contractors for change shall clearly describe the changes proposed, the reasons for and advantages of the changes proposed, and the contract?s price increase or decrease (if any) that would result.
3.0 Requirements
3.1 General - The contractor shall repair each Generator & ACU within sixty
(60) calendar days after approval of the Core Condition report (Appendix A)
SHELF LIFE CD 0
REVISION No. CHANGE No.
SPECIFICATION OR
STATEMENT OF WORK
COVER SHEET
TITLE
Mobile Electric Power Solutions Generator and Alternating Current Unit (ACU) Repair
REPAIR SPECIFICATION
SPECIFICATION NUMBER
X-XXX-XXXX
ORIGINATED BY Chris Robinson DATE 04/26 Revision (A) ORIGINATED BY Chris Robinson DATE 11/21/16 ___ Revision (B) ORIGINATED BY Chris Robinson DATE 04/10/17 ____ Revision (C) ORIGINATED BY DATE ______ Revision (D) ORIGINATED BY DATE _______ Revision (E) ORIGINATED BY DATE ______
ORIGINATOR'S COMMAND SURFACE FORCE LOGISTICS CENTER (SFLC)
DEPARTMENT/DIVISION SMALL BOAT PRODUCT LINE ENGINEERING CELL
INTERNAL REVIEWER DATE ______
SOWRB APPROVAL DATE
1.0 Scope
1.1 Purpose - This specification is for the repair of non-ready for issue Mobile Electric Power Solutions (MEPS) Generator and Alternating Current Unit (ACU) and for the supply of new MEPS Generators and ACU?s.
The contractor will reassemble the exchanged/remanufactured MEPS generator and ACU with only MEPS OEM equipment.
The generator and ACU shall be tested, preserved and packaged. The generator and ACU (one of a pair) are installed in the U.S. Coast Guard 45 FT. Response Boat Medium (RB-M), and the 42 FT. Near Shore Lifeboat (NLB). The generator and ACU will be provided to the contractor in a reinforced cardboard shipping container.
1.2 Government Furnished Property - This specification sets
forth the requirements for the following equipment:
a. MEPS Generator (SN: 2920-01-644-6491, P/N: 7102252-00, $2761.00
b. Alternating Control Unit (8kW) (ACU) (SN: 2920-01-644-6478, P/N: 8806124- 300, $5304.00
c. Battery Charger (SN: 6130-01-644-6473, P/N PMP245021010, $3547.00
2.0 APPLICABLE DOCUMENTS
2.1 Applicable Documents - The following documents form a part of this specification to the extent specified herein.
2.2 Government Documents
a. Power Generation System With Victron Multiplus 24/5000/120/100 (TP-5795)
2.3 Commercial Documents
a. ANSI/ASQ/ISO Q9001-2000, 13 Dec 2000, Inspection System
b. ANS/ISO/IEC 17025:2005 for Part 1 and ANSI/NCSL Z540.3-2007 for Part 2, General Requirements for Calibration Laboratories and Measuring and Test Equipment.
c. MEPS Inc Generator Test Plan.
d. MEPS Inc Alternating Current Unit Test Plan.
e. ASTM D3951-10 Standard Practice for Commercial Packaging
2.4 Specification Precedence - Any conflict between this
Specification and applicable documents identified in this Specification shall be resolved in this order:
a. This specification
b. Applicable documents
2.4.1 Departure from Specification - Departure from this specification shall not be allowed unless approved by the Coast Guard Contracting Officer.
a. If the contractor finds it necessary to implement change or depart from applicable specifications, they shall request permission.
b. Request by contractors for change shall clearly describe the changes proposed, the reasons for and advantages of the changes proposed, and the contract?s price increase or decrease (if any) that would result.
3.0 Requirements
3.1 General - The contractor shall repair each Generator & ACU within sixty
(60) calendar days after approval of the Core Condition report (Appendix A) by the Contracting Officer. The contractor shall provide all labor, equipment, special tools and materials required to accomplish the following sequence of activities:
MEPS Generator
a. Receive the generator.
b. Uncrate the generator.
c. Submit Core Condition Report (Appendix A) and GFP Report (Appendix F).
d. Disassemble and clean the generator.
e. Evaluate the resistance of each phase of each stator. (2 Stators)
f. Inspect for short circuits between phases and between phases to ground.
g. Provide Inspection Report (Appendix B) and Replacement Parts List (Appendix D) within 10 days of Generator receipt.
h. Repair and replace damaged or non-working components.
Note: If repairs exceed 65% of the replacement cost of the component, it shall be returned to the USCG within 15 days and disposed in accordance with USCG property disposal procedures.
i. Clean end-bells
j. Replace front and rear bearings.
k. Re-assemble the generator to OEM specifications.
Perform full Acceptance Test In accordance with OEM specifications.
l. Package and mark generator crate.
MEPS Electronic Control Unit (ACU) a.Receive the ACU.
b. Uncrate the ACU.
c. Submit Core Condition Report (Appendix A).
d. Disassemble and clean the ACU.
e. Inspect the functionality of electronics.
f. Provide Inspection Report (Appendix B) and Replacement Parts list (Appendix D) within 10 days of receipt of ACU.
g. Repair and replace damaged or non-working components.
h. Re-assemble the ACU to OEM specifications.
i. Perform full Acceptance Test IAW OEM specifications.
j. Package and mark ACU crate.
Note: If repairs exceed 65% of the replacement cost of the component, it shall be returned to the USCG and disposed in accordance with USCG property disposal procedures.
3.2 MEPS Generator and ACU MEPS and ACUs shall be repaired within sixty
(60) calendar days after approval of Core Condition Report, Appendix A. The generator and ACU shall be stored inside and protected from all weather.
3.3 MEPS Generator and ACU Parts All gaskets, seals, O rings and copper seals shall be replaced as new. The contractor shall use only MEPS O.E.M parts meeting O.E.M. specifications. All MEPS Generators and ACUs supplied to the contractor under this contract will be repaired at an authorized MEPS distributor facility.
3.4 New Components All new components are tested upon manufacture and reports are included with component. All new parts shall conform to the preservation, packaging, and marking requirements of this Specification.
3.5 Labor - All labor is to be performed by MEPS certified and authorized technicians.
3.6 Core Condition Report - The contractor shall submit Appendix A to the contracting officer in writing within ten (10) calendar days after receipt of the MEPS Generator and ACU. The contractor shall submit Appendix B to the contracting officer in writing within ten (10) calendar days after receipt of the generator or ACU.
3.7 Replacement Parts List - The contractor shall complete Appendix D following the core inspection and submit to the contracting officer in writing within ten (10) calendar days after receipt of the MEPS Generator and ACU. The contractor shall list any parts not considered mandatory, requiring replacement to affect repairs. (ex. Generator stator)
3.8 Core Acceptance Criteria - The contractor shall accept the core based on a visual inspection as per Appendix A. If during the internal core inspection the contractor identifies concerns with the core condition, conditions will be negotiated per paragraph 2.4.1.
3.9 Documentation - This specification sets forth the
requirements for the following documentation.
a. Core Condition Report, in accordance with Appendix A
b. Inspection Report, in accordance with Appendix B
c. Cumulative Tracking Report, Appendix C
d. Test Report, Reference 2.3.c and 2.3.d.
e. Replacement Parts List, Appendix D
e. Warranty Sheet, Appendix E
f. Government Furnished Property Report (GFP)
3.10 Warranty - A warranty 18 months with up to 12 months in stock and 6 months upon installtion from installation onto the USCG vessel. Storage commences upon receipt of generator or ACU at the designated Coast Guard facility. USCG will notify the contractor by serial number of the MEPS Generator or ACU the date of installation on the USCG vessel. An extended warranty for 9 months is required covering the new repaired MEPS Generator and repaired ACU. The contractor shall contact the field unit to arrange a resolution of a claim within 24 (twenty-four) hours after receiving notification by the Coast Guard of a warranty claim.
The contractor shall contact SFLC?s Contracting Officer Representative (COR) to evaluate the contractors proposed duration of warranty repair time.
In the event the Coast Guard decides the proposed warranty repair time by the Contracting Officer. The contractor shall provide all labor, equipment, special tools and materials required to accomplish the following sequence of activities:
MEPS Generator
a. Receive the generator.
b. Uncrate the generator.
c. Submit Core Condition Report (Appendix A) and GFP Report (Appendix F).
d. Disassemble and clean the generator.
e. Evaluate the resistance of each phase of each stator. (2 Stators)
f. Inspect for short circuits between phases and between phases to ground.
g. Provide Inspection Report (Appendix B) and Replacement Parts List (Appendix D) within 10 days of Generator receipt.
h. Repair and replace damaged or non-working components.
Note: If repairs exceed 65% of the replacement cost of the component, it shall be returned to the USCG within 15 days and disposed in accordance with USCG property disposal procedures.
i. Clean end-bells
j. Replace front and rear bearings.
k. Re-assemble the generator to OEM specifications.
Perform full Acceptance Test In accordance with OEM specifications.
l. Package and mark generator crate.
MEPS Electronic Control Unit (ACU) a.Receive the ACU.
b. Uncrate the ACU.
c. Submit Core Condition Report (Appendix A).
d. Disassemble and clean the ACU.
e. Inspect the functionality of electronics.
f. Provide Inspection Report (Appendix B) and Replacement Parts list (Appendix D) within 10 days of receipt of ACU.
g. Repair and replace damaged or non-working components.
h. Re-assemble the ACU to OEM specifications.
i. Perform full Acceptance Test IAW OEM specifications.
j. Package and mark ACU crate.
Note: If repairs exceed 65% of the replacement cost of the component, it shall be returned to the USCG and disposed in accordance with USCG property disposal procedures.
3.2 MEPS Generator and ACU MEPS and ACUs shall be repaired within sixty
(60) calendar days after approval of Core Condition Report, Appendix A. The generator and ACU shall be stored inside and protected from all weather.
3.3 MEPS Generator and ACU Parts All gaskets, seals, O rings and copper seals shall be replaced as new. The contractor shall use only MEPS O.E.M parts meeting O.E.M. specifications. All MEPS Generators and ACUs supplied to the contractor under this contract will be repaired at an authorized MEPS distributor facility.
3.4 New Components All new components are tested upon manufacture and reports are included with component. All new parts shall conform to the preservation, packaging, and marking requirements of this Specification.
3.5 Labor - All labor is to be performed by MEPS certified and authorized technicians.
3.6 Core Condition Report - The contractor shall submit Appendix A to the contracting officer in writing within ten (10) calendar days after receipt of the MEPS Generator and ACU. The contractor shall submit Appendix B to the contracting officer in writing within ten (10) calendar days after receipt of the generator or ACU.
3.7 Replacement Parts List - The contractor shall complete Appendix D following the core inspection and submit to the contracting officer in writing within ten (10) calendar days after receipt of the MEPS Generator and ACU. The contractor shall list any parts not considered mandatory, requiring replacement to affect repairs. (ex. Generator stator)
3.8 Core Acceptance Criteria - The contractor shall accept the core based on a visual inspection as per Appendix A. If during the internal core inspection the contractor identifies concerns with the core condition, conditions will be negotiated per paragraph 2.4.1.
3.9 Documentation - This specification sets forth the
requirements for the following documentation.
a. Core Condition Report, in accordance with Appendix A
b. Inspection Report, in accordance with Appendix B
c. Cumulative Tracking Report, Appendix C
d. Test Report, Reference 2.3.c and 2.3.d.
e. Replacement Parts List, Appendix D
e. Warranty Sheet, Appendix E
f. Government Furnished Property Report (GFP)
3.10 Warranty - A warranty 18 months with up to 12 months in stock and 6 months upon installtion from installation onto the USCG vessel. Storage commences upon receipt of generator or ACU at the designated Coast Guard facility. USCG will notify the contractor by serial number of the MEPS Generator or ACU the date of installation on the USCG vessel. An extended warranty for 9 months is required covering the new repaired MEPS Generator and repaired ACU. The contractor shall contact the field unit to arrange a resolution of a claim within 24 (twenty-four) hours after receiving notification by the Coast Guard of a warranty claim.
The contractor shall contact SFLC?s Contracting Officer Representative (COR) to evaluate the contractors proposed duration of warranty repair time.
In the event the Coast Guard decides the proposed warranty repair time compromises the Coast Guards mission and decides on removal/replacement, the contractor shall coordinate and fund all necessary shipping arrangements for the failed MEPS Generator and ACU to be returned to the origin of repair facility for repairs and returned to a designated Coast Guard facility after repairs have been completed.
The contractor shall repair the failed Generator or ACU to the condition level necessary for the contractor to honor a new full warranty (not to be funded by the CG). The contractor shall submit to the Contracting Officer an inspection report for approval containing any parts and pricing for any work/repairs that are required that were not a result of the specific casualty.
4.0 Quality Assurance
4.1 General - The contractor shall maintain an inspection
system, which shall ensure each item, offered to the Government for acceptance conforms to contract requirements. The system shall be documented and in compliance with ANSI/ASQC Q9003.
4.2 Records - The contractor shall as a minimum maintain records of all inspections and tests. The records shall indicate the nature and number of observations made, type of deficiencies found, and the corrective action taken. Records shall be furnished upon arrival of the Contracting Officer's Representative.
4.3 Contractors Calibration System - The contractor shall maintain a calibration and maintenance system to control the accuracy of measurement and test equipment used in the fulfillment of this contract in accordance with ANSI/NCSL Z540-1. The system shall include as a minimum, prescribed calibration intervals, source of calibration, and a monitoring system to insure adherence to calibration schedules. Calibration standards shall be traceable to the National Institute of Standards and Technology (NIST).
Documentation in support of this requirement shall be readily available for Government review.
4.4 Responsibility For Inspection - The Contractor shall be
responsible for all inspections/test requirements specified herein. The contractor shall provide space, personnel, and test equipment to conduct all inspection requirements. All testing and inspection shall be at the Contractors facility or other facilities acceptable to the Government. The Government reserves the right to verify or have performed any of the inspection/tests set forth in this specification where such inspections are deemed necessary to assure that supplies or services conform to the prescribed requirements.
4.5 Required Tests ? In accordance with reference 2.3.c, and 2.3.d each MEPS Generator and ACU provided under this contract shall be operationally tested to assure minimum performance prior to acceptance.
4.6 Test Report - The contractor shall deliver a test report, reference 2.3.c & 2.3.d, within seven (7) calendar days after completion of tests. The test report shall consist of the data obtained during the MEPS Generator and ACU test. One copy of the test report shall be packed and delivered with each MEPS and ACU delivered under this contract.
5.0 PRESERVATION, MARKING AND PACKAGING
5.1 PRESERVATION (External) - Upon completion of final test, the MEPS Generator and ACU shall be prepared as follows:
5.1.1 Surfaces shall be cleaned and free of grease/oil.
5.2 MARKING - Each shipping container shall be marked in accordance with 5.2.1.
a. The contractor shall ensure that the serial number and model number on the container sides match the actual MEPS Generator and ACU serial number and model number in the container.
b. Shipments shall be marked in accordance with the current edition of MILSTD-129P w/Change 4, Military Marking for Shipment and Storage dated September 19, 2007.
c. SFLC is an Inventory Control Point (ICP), material will be stored and transshipped to various users; therefore material must be packed and labeled suitable for shipment via land, air or sea. The following requirements apply:
d. Each individual part or part container must be marked. Lettering shall be black applied on a highly contrasting background.
e. Markings shall consist of the National Stock Number (NSN), or Acquisition Control Number (ACN), Item Name, Model Number, Serial Number, Contract Number, Contractor Part Number, Box X of Y, Shipping Weight, Condition Code, Quantity and Unit of Issue.
5.2.1 This marking shall be in the format as follows:
STOCK NUMBER 2920-01-644-6491
ITEM NAME MEPS 8kW Generator
PART NUMBER 7102252-00
SERIAL NUMBER ?per Delivery Order" CONTRACT NUMBER See contract DELIVERY ORDER NUMBER ?per Delivery Order?
SHIPPING WEIGHT Determined by Contractor
PRESERVED FOR LONG TERM
STORAGE ON Date Preserved
QUANTITY & UNIT OF ISSUE 1-EA
CONDITION CODE CONDITION A
OTHER DATA AS COAST GUARD SFLC MATERIAL
DIRECTED REUSABLE CRATE, DO NOT
DAMAGE. DO NOT STACK
compromises the Coast Guards mission and decides on removal/replacement, the contractor shall coordinate and fund all necessary shipping arrangements for the failed MEPS Generator and ACU to be returned to the origin of repair facility for repairs and returned to a designated Coast Guard facility after repairs have been completed.
The contractor shall repair the failed Generator or ACU to the condition level necessary for the contractor to honor a new full warranty (not to be funded by the CG). The contractor shall submit to the Contracting Officer an inspection report for approval containing any parts and pricing for any work/repairs that are required that were not a result of the specific casualty.
4.0 Quality Assurance
4.1 General - The contractor shall maintain an inspection
system, which shall ensure each item, offered to the Government for acceptance conforms to contract requirements. The system shall be documented and in compliance with ANSI/ASQC Q9003.
4.2 Records - The contractor shall as a minimum maintain records of all inspections and tests. The records shall indicate the nature and number of observations made, type of deficiencies found, and the corrective action taken. Records shall be furnished upon arrival of the Contracting Officer's Representative.
4.3 Contractors Calibration System - The contractor shall maintain a calibration and maintenance system to control the accuracy of measurement and test equipment used in the fulfillment of this contract in accordance with ANSI/NCSL Z540-1. The system shall include as a minimum, prescribed calibration intervals, source of calibration, and a monitoring system to insure adherence to calibration schedules. Calibration standards shall be traceable to the National Institute of Standards and Technology (NIST).
Documentation in support of this requirement shall be readily available for Government review.
4.4 Responsibility For Inspection - The Contractor shall be
responsible for all inspections/test requirements specified herein. The contractor shall provide space, personnel, and test equipment to conduct all inspection requirements. All testing and inspection shall be at the Contractors facility or other facilities acceptable to the Government. The Government reserves the right to verify or have performed any of the inspection/tests set forth in this specification where such inspections are deemed necessary to assure that supplies or services conform to the prescribed requirements.
4.5 Required Tests ? In accordance with reference 2.3.c, and 2.3.d each MEPS Generator and ACU provided under this contract shall be operationally tested to assure minimum performance prior to acceptance.
4.6 Test Report - The contractor shall deliver a test report, reference 2.3.c & 2.3.d, within seven (7) calendar days after completion of tests. The test report shall consist of the data obtained during the MEPS Generator and ACU test. One copy of the test report shall be packed and delivered with each MEPS and ACU delivered under this contract.
5.0 PRESERVATION, MARKING AND PACKAGING
5.1 PRESERVATION (External) - Upon completion of final test, the MEPS Generator and ACU shall be prepared as follows:
5.1.1 Surfaces shall be cleaned and free of grease/oil.
5.2 MARKING - Each shipping container shall be marked in accordance with 5.2.1.
a. The contractor shall ensure that the serial number and model number on the container sides match the actual MEPS Generator and ACU serial number and model number in the container.
b. Shipments shall be marked in accordance with the current edition of MILSTD-129P w/Change 4, Military Marking for Shipment and Storage dated September 19, 2007.
c. SFLC is an Inventory Control Point (ICP), material will be stored and transshipped to various users; therefore material must be packed and labeled suitable for shipment via land, air or sea. The following requirements apply:
d. Each individual part or part container must be marked. Lettering shall be black applied on a highly contrasting background.
e. Markings shall consist of the National Stock Number (NSN), or Acquisition Control Number (ACN), Item Name, Model Number, Serial Number, Contract Number, Contractor Part Number, Box X of Y, Shipping Weight, Condition Code, Quantity and Unit of Issue.
5.2.1 This marking shall be in the format as follows:
STOCK NUMBER 2920-01-644-6491
ITEM NAME MEPS 8kW Generator
PART NUMBER 7102252-00
SERIAL NUMBER ?per Delivery Order" CONTRACT NUMBER See contract DELIVERY ORDER NUMBER ?per Delivery Order?
SHIPPING WEIGHT Determined by Contractor
PRESERVED FOR LONG TERM
STORAGE ON Date Preserved
QUANTITY & UNIT OF ISSUE 1-EA
CONDITION CODE CONDITION A
OTHER DATA AS COAST GUARD SFLC MATERIAL
DIRECTED REUSABLE CRATE, DO NOT
DAMAGE. DO NOT STACK
MORE THAN TWO HIGH
STOCK NUMBER 2920-01-644-6478 ITEM NAME MEPS 8kW Alternating Current Unit
PART NUMBER 8806124-300
SERIAL NUMBER "per Delivery Order" CONTRACT NUMBER See contract DELIVERY ORDER NUMBER ?per Delivery Order?
SHIPPING WEIGHT Determined by Contractor
PRESERVED FOR LONG TERM
STORAGE ON Date Preserved
QUANTITY & UNIT OF ISSUE 1-EA
CONDITION CODE CONDITION A
OTHER DATA AS COAST GUARD SFLC MATERIAL
DIRECTED REUSABLE CRATE, DO NOT
DAMAGE. DO NOT STACK
MORE THAN TWO HIGH
STOCK NUMBER 6130-01-644-6473
ITEM NAME Battery Charger
PART NUMBER PMP245021010
SERIAL NUMBER ?per Delivery Order" CONTRACT NUMBER See contract DELIVERY ORDER NUMBER ?per Delivery Order?
SHIPPING WEIGHT Determined by Contractor
PRESERVED FOR LONG TERM
STORAGE ON Date Preserved
QUANTITY & UNIT OF ISSUE 1-EA
CONDITION CODE CONDITION A
OTHER DATA AS COAST GUARD SFLC MATERIAL
DIRECTED REUSABLE CRATE, DO NOT
DAMAGE. DO NOT STACK
MORE THAN TWO HIGH
5.2.2 Large part shipping container lettering shall be at least ? inch high or 36 point type. Stenciling is acceptable. General Packaging lettering shall be at least 1/4 inch high or 18 point type.
Plastic Bag lettering may be 12 point lettering.
The contractor shall paint over all other markings not outlined in 5.2.1.
5.3 PACKAGING -
5.3.1. Packaging, handling, shipping, and transportation procedures shall be in accordance with ASTM D3951-10 Standard Practice for Commercial Packaging.
If commercial practices cannot adequately protect and preserve the equipment, the contractor shall package, handle, ship and transport equipment in accordance with MIL-STD-2073-1E Standard Practice for Military Packaging dated May 23, 2008.
5.3.2. Each Part shall be packaged separately, or in its designated unit of issue.
5.3.3. All parts shall be identified and accounted for by their NSN or ACN on the packing list.
5.3.4. Large parts shall be shrink-wrapped or otherwise covered and sealed to prevent water damage. Small parts shall be enclosed in clear plastic packaging.
5.3.5. Multiple identical parts may be repackaged in designated quantity units (box lot, case lot, pair, etc) for shipping purposes. The packaging shall be identified by the words MULTI-PACK and the quantity per package.
5.3.6. Documents and other enclosures shall be sealed in a waterproof plastic bag, which shall be permanently affixed to the inside of the shipping container in a conspicuous location. The last line of the package label shall contain the words "DOCUMENTS ENCLOSED"
5.3.7. Parts- Containers:
5.3.7.1. Parts shall be packed in containers meeting ASTM D 3951 and the requirements herein.
5.3.7.2. Containers with special packing / unpacking instructions shall be stenciled "CAUTION - THIS ITEM MAY BE SERIOUSLY DAMAGED UNLESS UNPACKING INSTRUCTIONS ARE FOLLOWED CAREFULLY.? followed by a notation of the location of instructions.
5.3.8. General items:
5.3.8.1. General components weighing less than 70 lbs may be packaged in commercial reinforced cardboard packaging, or its equivalent, or packaged in a skid mounted shipping container. If packaged in a skid mounted shipping container then containers shall be completely enclosed and structurally suitable for stacking at least 2-high. The containers shall be suitable for inside covered stowage. Containers shall be assembled with screws to permit ease of removal of the cover or lid from the base.
5.3.8.2. Reinforced cardboard packaging shall be sealed, but shall be suitable for being opened (without total packaging destruction) for inspection, resealing and subsequent shipment to the fleet.
5.3.8.3. The reinforced cardboard packaging shall be completely enclosed and suitable for stacking. The packaging shall be suitable for long-term inside storage in a warehouse.
MORE THAN TWO HIGH
STOCK NUMBER 2920-01-644-6478 ITEM NAME MEPS 8kW Alternating Current Unit
PART NUMBER 8806124-300
SERIAL NUMBER "per Delivery Order" CONTRACT NUMBER See contract DELIVERY ORDER NUMBER ?per Delivery Order?
SHIPPING WEIGHT Determined by Contractor
PRESERVED FOR LONG TERM
STORAGE ON Date Preserved
QUANTITY & UNIT OF ISSUE 1-EA
CONDITION CODE CONDITION A
OTHER DATA AS COAST GUARD SFLC MATERIAL
DIRECTED REUSABLE CRATE, DO NOT
DAMAGE. DO NOT STACK
MORE THAN TWO HIGH
STOCK NUMBER 6130-01-644-6473
ITEM NAME Battery Charger
PART NUMBER PMP245021010
SERIAL NUMBER ?per Delivery Order" CONTRACT NUMBER See contract DELIVERY ORDER NUMBER ?per Delivery Order?
SHIPPING WEIGHT Determined by Contractor
PRESERVED FOR LONG TERM
STORAGE ON Date Preserved
QUANTITY & UNIT OF ISSUE 1-EA
CONDITION CODE CONDITION A
OTHER DATA AS COAST GUARD SFLC MATERIAL
DIRECTED REUSABLE CRATE, DO NOT
DAMAGE. DO NOT STACK
MORE THAN TWO HIGH
5.2.2 Large part shipping container lettering shall be at least ? inch high or 36 point type. Stenciling is acceptable. General Packaging lettering shall be at least 1/4 inch high or 18 point type.
Plastic Bag lettering may be 12 point lettering.
The contractor shall paint over all other markings not outlined in 5.2.1.
5.3 PACKAGING -
5.3.1. Packaging, handling, shipping, and transportation procedures shall be in accordance with ASTM D3951-10 Standard Practice for Commercial Packaging.
If commercial practices cannot adequately protect and preserve the equipment, the contractor shall package, handle, ship and transport equipment in accordance with MIL-STD-2073-1E Standard Practice for Military Packaging dated May 23, 2008.
5.3.2. Each Part shall be packaged separately, or in its designated unit of issue.
5.3.3. All parts shall be identified and accounted for by their NSN or ACN on the packing list.
5.3.4. Large parts shall be shrink-wrapped or otherwise covered and sealed to prevent water damage. Small parts shall be enclosed in clear plastic packaging.
5.3.5. Multiple identical parts may be repackaged in designated quantity units (box lot, case lot, pair, etc) for shipping purposes. The packaging shall be identified by the words MULTI-PACK and the quantity per package.
5.3.6. Documents and other enclosures shall be sealed in a waterproof plastic bag, which shall be permanently affixed to the inside of the shipping container in a conspicuous location. The last line of the package label shall contain the words "DOCUMENTS ENCLOSED"
5.3.7. Parts- Containers:
5.3.7.1. Parts shall be packed in containers meeting ASTM D 3951 and the requirements herein.
5.3.7.2. Containers with special packing / unpacking instructions shall be stenciled "CAUTION - THIS ITEM MAY BE SERIOUSLY DAMAGED UNLESS UNPACKING INSTRUCTIONS ARE FOLLOWED CAREFULLY.? followed by a notation of the location of instructions.
5.3.8. General items:
5.3.8.1. General components weighing less than 70 lbs may be packaged in commercial reinforced cardboard packaging, or its equivalent, or packaged in a skid mounted shipping container. If packaged in a skid mounted shipping container then containers shall be completely enclosed and structurally suitable for stacking at least 2-high. The containers shall be suitable for inside covered stowage. Containers shall be assembled with screws to permit ease of removal of the cover or lid from the base.
5.3.8.2. Reinforced cardboard packaging shall be sealed, but shall be suitable for being opened (without total packaging destruction) for inspection, resealing and subsequent shipment to the fleet.
5.3.8.3. The reinforced cardboard packaging shall be completely enclosed and suitable for stacking. The packaging shall be suitable for long-term inside storage in a warehouse.
5.3.9. Small items:
5.3.9.1. Small items which can fit into express carrier standard packaging (maximum 17.5 in x 12.5 in x 3 in box. or 38 x 6 x 6 x 6 triangular tube) for shipment with appropriate cushioning may be sealed in clear plastic packaging, or packaged in a commercial reinforced cardboard packaging. If packaged in a cardboard package then the requirement for general packaging applies.
5.3.9.2. Plastic packaging shall be 6 mil thickness and sufficiently clear for part inspection. Plastic packaging shall have provision for breathing to prevent condensation unless the packaging provides a hermetic seal.
5.3.10. Durability
5.3.10.1. The contractor shall ensure that all deliverables, when packed in separate shipping containers, will be capable of being transported on standard transportation systems, commercial or military carriers. The contractor shall preserve, package, and mark the containers to ensure complete delivery at destination without damage or deterioration due to the hazards of shipping, handling or storage.
5.3.11. Parts - Packing and Cribbing:
5.3.11.1. Restraints, packing and cribbing shall restrain and protect the parts within their packaging from damage during shipment and storage:
5.3.11.2. The internal packaging material shall be sufficient to prevent damage during shipment, handling and storage. Preservation protection must be sufficient to prevent corrosion, deterioration or decay during warehouse storage for a period of at least one year.
5.3.11.3. Cribbing shall be provided to prevent damage during shipment.
5.3.11.4. Loose fill & Styrofoam packing materials shall not be used.
5.4. MARKING OF WARRANTED ITEMS
Pursuant to the requirements of FAR 46.706 (b) (5), the contractor shall stamp or mark the supplies delivered or otherwise furnish notice with the supplies of the existence of the warranty (Warranty Notice, Appendix E).
Markings may be brief but should include:
a. A brief statement that a warranty exists.
b. The substance of the warranty.
c. Its duration.
d. Who to notify if the supplies are found to be defective. For commercial items (see 46.709), the contractor?s trade practice in warranty marking is acceptable if sufficient information is presented for supply personnel and users to identify warranted supplies.
5.5. PACKING LIST
All material shipped or delivered under this contract must be accompanied by an itemized packing list that cites the proper contract and delivery order number. Each packing unit shall have a list of all items contained in that unit. The packing list shall include the due-in numbers provided by Surface Forces Logistics Center.
The packing list shall be securely attached to the outside of the container and shall be enclosed in a clear waterproof envelope.
5.5.1. Material Inspection and Receiving Report and Packing Slip
5.5.1.1. A DHS 700-21 Material Inspection and Receiving Report shall be accompany each delivery.
5.5.1.2. A Government Representative above will perform visual inspection to ensure all items listed on the packing slip are provided, and will sign the DHS 700-21 to accept the delivery.
5.5.1.3. The original signed DHS 700-21, with a copy of the packing slip attached shall be forwarded to the Contracting Officer.
5.5.2. Packing Slip
A packing slip shall be prepared for each box or shipping container. The packaging slip shall include the following information: (1) National Stock Number, (2) Part Number, (3) Nomenclature, (4) Serial Number, (5) Contract Number, (6) Delivery Order Number, (7) Line Item Number, and (8) Quantity.
One copy of the packaging slip shall be submitted with the shipment and shall be attached to the outside of the shipping carton inside a waterproof, clear envelope.
5.6 USCG Inspection and Acceptance
5.1. The Contractor shall be responsible for the performance of any inspection and test requirements. Inspection shall take place at Destination.
Final acceptance shall be made by a Government representative at Destination.
Acceptance shall be contingent upon verification of no damage in transit, correctness and completeness of the order, and conformance to the preservation, packaging, and marking requirements as outlined herein.
5.7. FAILURE TO COMPLY:
Failure to prepare for shipment any item, and/or mark all packages, boxes, etc., as indicated herein shall result in rejection of the shipment and return of the shipment at the contractor?s expense.
6.0 NOTES
6.1 GOVERNMENT & COMMERCIAL DOCUMENT SOURCES
5.3.9. Small items:
5.3.9.1. Small items which can fit into express carrier standard packaging (maximum 17.5 in x 12.5 in x 3 in box. or 38 x 6 x 6 x 6 triangular tube) for shipment with appropriate cushioning may be sealed in clear plastic packaging, or packaged in a commercial reinforced cardboard packaging. If packaged in a cardboard package then the requirement for general packaging applies.
5.3.9.2. Plastic packaging shall be 6 mil thickness and sufficiently clear for part inspection. Plastic packaging shall have provision for breathing to prevent condensation unless the packaging provides a hermetic seal.
5.3.10. Durability
5.3.10.1. The contractor shall ensure that all deliverables, when packed in separate shipping containers, will be capable of being transported on standard transportation systems, commercial or military carriers. The contractor shall preserve, package, and mark the containers to ensure complete delivery at destination without damage or deterioration due to the hazards of shipping, handling or storage.
5.3.11. Parts - Packing and Cribbing:
5.3.11.1. Restraints, packing and cribbing shall restrain and protect the parts within their packaging from damage during shipment and storage:
5.3.11.2. The internal packaging material shall be sufficient to prevent damage during shipment, handling and storage. Preservation protection must be sufficient to prevent corrosion, deterioration or decay during warehouse storage for a period of at least one year.
5.3.11.3. Cribbing shall be provided to prevent damage during shipment.
5.3.11.4. Loose fill & Styrofoam packing materials shall not be used.
5.4. MARKING OF WARRANTED ITEMS
Pursuant to the requirements of FAR 46.706 (b) (5), the contractor shall stamp or mark the supplies delivered or otherwise furnish notice with the supplies of the existence of the warranty (Warranty Notice, Appendix E).
Markings may be brief but should include:
a. A brief statement that a warranty exists.
b. The substance of the warranty.
c. Its duration.
d. Who to notify if the supplies are found to be defective. For commercial items (see 46.709), the contractor?s trade practice in warranty marking is acceptable if sufficient information is presented for supply personnel and users to identify warranted supplies.
5.5. PACKING LIST
All material shipped or delivered under this contract must be accompanied by an itemized packing list that cites the proper contract and delivery order number. Each packing unit shall have a list of all items contained in that unit. The packing list shall include the due-in numbers provided by Surface Forces Logistics Center.
The packing list shall be securely attached to the outside of the container and shall be enclosed in a clear waterproof envelope.
5.5.1. Material Inspection and Receiving Report and Packing Slip
5.5.1.1. A DHS 700-21 Material Inspection and Receiving Report shall be accompany each delivery.
5.5.1.2. A Government Representative above will perform visual inspection to ensure all items listed on the packing slip are provided, and will sign the DHS 700-21 to accept the delivery.
5.5.1.3. The original signed DHS 700-21, with a copy of the packing slip attached shall be forwarded to the Contracting Officer.
5.5.2. Packing Slip
A packing slip shall be prepared for each box or shipping container. The packaging slip shall include the following information: (1) National Stock Number, (2) Part Number, (3) Nomenclature, (4) Serial Number, (5) Contract Number, (6) Delivery Order Number, (7) Line Item Number, and (8) Quantity.
One copy of the packaging slip shall be submitted with the shipment and shall be attached to the outside of the shipping carton inside a waterproof, clear envelope.
5.6 USCG Inspection and Acceptance
5.1. The Contractor shall be responsible for the performance of any inspection and test requirements. Inspection shall take place at Destination.
Final acceptance shall be made by a Government representative at Destination.
Acceptance shall be contingent upon verification of no damage in transit, correctness and completeness of the order, and conformance to the preservation, packaging, and marking requirements as outlined herein.
5.7. FAILURE TO COMPLY:
Failure to prepare for shipment any item, and/or mark all packages, boxes, etc., as indicated herein shall result in rejection of the shipment and return of the shipment at the contractor?s expense.
6.0 NOTES
6.1 GOVERNMENT & COMMERCIAL DOCUMENT SOURCES
6.1.1 GOVERNMENT DOCUMENTS
a. Surface Forces Logistics Center 2401 Hawkins Point Rd.
Baltimore, MD 21226-1792 Ian Weiss 410-762-6472
6.1.2 COMMERCIAL DOCUMENTS
a. Mobile Electric Power Solutions, Inc 2623 National Circle Garland, TX 75041
(972) 864-1015
b. American Society for Testing Materials (ASTM) 100 Barr Harbor DR.
P.O. Box C700 West Conshohocken PA. 19428-2959
6.2 APPENDICES - The following appendices apply:
a. Appendix A: Core Condition Report
b. Appendix B: Disassembly Report
c. Appendix C: Cumulative Tracking Report
d. Appendix D: Replacement Parts List
e. Appendix E: Warranty Sheet
f. Appendix F: Government Furnished Property Report
APPENDIX A
Work Order #_________________________________ Port/Stbd ____________________________________ Delivery Order #_______________________________ MEPS/ACU Serial # ________________________________
Core Acceptance is based on the following:
a. Core must have no non-operational damage
b. Core must be a complete unit and not disassembled
NOTE: Missing parts from Appendix A are to be replaced and priced as per section B of this contract.
a. Core acceptable_______________________, non-acceptable_____________ Remarks _______________________________________________________
b. Shipping crate: Acceptable__________, non-acceptable_____________ Remarks _______________________________________________________
APPENDIX B
Delivery Order Number:_________________ Date:_________________________________ MEPS/ACU Serial Number:_____________________
Reason for Replacement Qty Part No. Part Description Unit Price Amount
Total
6.1.1 GOVERNMENT DOCUMENTS
a. Surface Forces Logistics Center 2401 Hawkins Point Rd.
Baltimore, MD 21226-1792 Ian Weiss 410-762-6472
6.1.2 COMMERCIAL DOCUMENTS
a. Mobile Electric Power Solutions, Inc 2623 National Circle Garland, TX 75041
(972) 864-1015
b. American Society for Testing Materials (ASTM) 100 Barr Harbor DR.
P.O. Box C700 West Conshohocken PA. 19428-2959
6.2 APPENDICES - The following appendices apply:
a. Appendix A: Core Condition Report
b. Appendix B: Disassembly Report
c. Appendix C: Cumulative Tracking Report
d. Appendix D: Replacement Parts List
e. Appendix E: Warranty Sheet
f. Appendix F: Government Furnished Property Report
APPENDIX A
Work Order #_________________________________ Port/Stbd ____________________________________ Delivery Order #_______________________________ MEPS/ACU Serial # ________________________________
Core Acceptance is based on the following:
a. Core must have no non-operational damage
b. Core must be a complete unit and not disassembled
NOTE: Missing parts from Appendix A are to be replaced and priced as per section B of this contract.
a. Core acceptable_______________________, non-acceptable_____________ Remarks _______________________________________________________
b. Shipping crate: Acceptable__________, non-acceptable_____________ Remarks _______________________________________________________
APPENDIX B
Delivery Order Number:_________________ Date:_________________________________ MEPS/ACU Serial Number:_____________________
Reason for Replacement Qty Part No. Part Description Unit Price Amount
Total
APPENDIX C
CUMULATIVE TRACKING REPORT SUBMIT BY THE 15TH OF THE MONTH
MEPS/ACU Serial Number Work # D/O # Date Received Core Accepted Y/N
APPENDIX D
REPLACEMENT PARTS LIST
GENERATOR & ACU
Manufacturer: MEPS Component NSN/Part Number Generator 8kW 2920-01-644-6491/7102252-00 Battery Charger 6130-01-644-6473/PMP245021010 ACU 8kW 2920-01-644-6478/8806124-300
MANDATORY REPLACEMENT PARTS LIST
No. Description Part No. Qty.
Bearing (Gen) 6305 01 Bearing (Gen) 6203 01 Slip Ring (Gen) 01 Brush Set (2) (Gen) 01
ADDITIONAL REQUIRED REPLACEMENT PARTS LIST
APPENDIX E
WARRANTY NOTICE
This item has a warranty for whichever comes first:
1 year of operation from installation onto the USCG vessel Or 1000 hours of operation If any discrepancies are noted upon receipt
1. DO NOT REPAIR OR REPLACE!
2. CALL: USCG SURFACE FORCES LOGISTICS CENTER
ASSET MANAGEMENT SECTION 2
SMALL BOAT PRODUCT LINE (SBPL)
COMMERCIAL (410) 762-6062/6130/6390
Have the following information ready when calling the (SBPL) ________ Date Received ________ Date Installed ________ Serial No. ________ Vessel Home Port ________ Engine Hours ________ Vessel Hull No
3. A Report of Discrepancy (ROD) Form 364 must also be submitted to Surface Forces Logistics Center.
NOTES:
(1) Preventative Maintenance (PMS) should still be performed as per
APPENDIX C
CUMULATIVE TRACKING REPORT SUBMIT BY THE 15TH OF THE MONTH
MEPS/ACU Serial Number Work # D/O # Date Received Core Accepted Y/N
APPENDIX D
REPLACEMENT PARTS LIST
GENERATOR & ACU
Manufacturer: MEPS Component NSN/Part Number Generator 8kW 2920-01-644-6491/7102252-00 Battery Charger 6130-01-644-6473/PMP245021010 ACU 8kW 2920-01-644-6478/8806124-300
MANDATORY REPLACEMENT PARTS LIST
No. Description Part No. Qty.
Bearing (Gen) 6305 01 Bearing (Gen) 6203 01 Slip Ring (Gen) 01 Brush Set (2) (Gen) 01
ADDITIONAL REQUIRED REPLACEMENT PARTS LIST
APPENDIX E
WARRANTY NOTICE
This item has a warranty for whichever comes first:
1 year of operation from installation onto the USCG vessel Or 1000 hours of operation If any discrepancies are noted upon receipt
1. DO NOT REPAIR OR REPLACE!
2. CALL: USCG SURFACE FORCES LOGISTICS CENTER
ASSET MANAGEMENT SECTION 2
SMALL BOAT PRODUCT LINE (SBPL)
COMMERCIAL (410) 762-6062/6130/6390
Have the following information ready when calling the (SBPL) ________ Date Received ________ Date Installed ________ Serial No. ________ Vessel Home Port ________ Engine Hours ________ Vessel Hull No
3. A Report of Discrepancy (ROD) Form 364 must also be submitted to Surface Forces Logistics Center.
NOTES:
(1) Preventative Maintenance (PMS) should still be performed as per applicable Maintenance Procedure Cards (MPC?s). PMS does not void the warranty.
(2) If the above procedure is not followed, the warranty may be affected.
WARRANTY:
X A. Standard Manufacturer's Warranty
B. Item being repaired as an "onboard repair" or a "system stock" item and will be put into inventory. NOT FOR IMMEDIATE INSTALLATION.
Contractor must guarantee item against defects that lead to failure for days after installation for a period of up to two (2) years after delivery to Coast Guard.
GOVERNMENT ACCEPTANCE:
Acceptance will be made at destination by a Government representative.
Acceptance will be contingent upon the representative's verification of no damage in transit, correctness and completeness of order and contractor's conformance to preservation/packaging, packing and marking requirements.
PACKAGING AND MARKING FOR SHIPMENT:
X A. Each unit shall be packed individually in it's own wooden box which shall be capable of providing adequate protection to the item during multiple shipments. Mark each box in legible black print lettering with the following information:
NATIONAL STOCK NUMBER
ITEM NAME
PART NUMBER
GOVERNMENT ORDER NUMBER
2920-01-644-6478
ALTERNATING CURRENT UNIT
8806124-300
PRESERVATION / PACKAGING:
X A. Each unit shall be individually preserved and wrapped for protection against deterioration for a period of two (2) years minimum.
B. See Attachments
B. See Attachments
And the words: "Coast Guard SFLC Material, Condition "A"
RECOMMENDED SOURCES:
MOBILE ELECTRIC POWER SOLUTIONS INC
2623 NATIONAL CIRCLE
GARLAND, TEXAS 75041
PHONE: 972-864-1015
FAX: 972-271-0635
972 864 1015
WRITTEN BY:
DATE :
STEVEN BOLEN
24 MAY 19
Cost Estimate for Overhaul NOT TO EXCEED: $550
File details come from the government source that posted it.