Questions and Responses - El Reno - Construct Outside Warehouse and Freezer_jrc.pdf
PDF 189 KB Posted
- Attached to
- FCI El Reno - Construct Outside Warehouse and Freezer Camp Federal contract opportunity
- Solicitation number
- 15BFA023B00000004
About this file
This document contains questions and responses related to solicitation 15BFA023B00000004 for the construction of an outside warehouse and freezer at FCI El Reno. The Bureau of Prisons Field Acquisition Office issued the solicitation on May 5, 2023 to construct a warehouse and freezer outside the facility. One question sought clarification on where elastomeric coatings specified in section 099653 of the statement of work were to be applied, with the response referring to exposed faces of exterior concrete stem walls per drawing details. A second question inquired about the height of a fence shown on plan C2.0, with the response providing an attached revised drawing C2.0 depicting added fence details.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Abstract.pdf | ||
| Site Visit Sign in log 5-31-2023_0001.pdf | ||
| Wage Determination OK20230041 Modfication 7.pdf | ||
| Site Visit Meeting Minutes.pdf | ||
| Amendment 00001.pdf | ||
| Attachment 6 - Criminal History Check Form.pdf | ||
| Attachment 5 - SF-24 Bid Bond Form.pdf | ||
| Instructions to Bidders.pdf | ||
| Solicitation.pdf | ||
| Attachment 4 - Construction Wage Rates OK20230041 4-7-23.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FCI EL RENO – CONSTRUCT OUTSIDE WAREHOUSE AND FREEZER
PROJECT 5AM2 QUESTIONS & ANSWERS
SOLICITATION 15BFA023B00000004
QUESTIONS AND ANSWERS
FCI El Reno
15BFA023B00000004 - PROJECT 5AM2
The questions below are posed by contractors and I must post responses to the solicitation as soon as possible. In addition, please note if the answer is a CLARIFICATION or CHANGE. If it is a change I must issue an amendment.
If there is a change to the SOW based on a question and answer, WE must obtain authorization from the SCRO Facilities Administrator in writing to request the change. If answer to any question is contained in the SOW/Specs, only refer the contractor to the page in the document. Do not provide any other response. Please provide your responses by close of business on Friday, June 9, 2023.
Please leave the document in this format.
1. Division 099653 - Where is the Elastomeric Coatings Specified in Section 099653 to be Applied?
CLARIFICATON: Exposed faces of exterior concrete stem walls, refer to details sheet AE402.
2. Plan C 2.0 Fence - How high is the Fence show on Plan C2.0? There are no Specifications for this fence.
CHANGE: Refer to added fence details on attached sheet C2.0