Amendment_00004.pdf
PDF 273 KB Posted
- Attached to
- New Vehicle and Pedestrian Gates Federal contract opportunity
- Solicitation number
- 15B40319B00000001
About this file
Amendment 00004 Wage Determination Update Site Visit Meeting Minutes
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Abstract.pdf | ||
| Amendment_00003.pdf | ||
| Amendment_00002.pdf | ||
| Bid_Bond.pdf | ||
| Amendment_00001.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
15B40319B0000001 Page 1 of 2
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NO.
00004
3. EFFECTIVE DATE
10/22/2019
4. REQUISITION/PURCHASE REQ. NO.
5. PROJECT NO. (If applicable)
4C8D
6. ISSUED BY CODE BFAO 7. ADMINISTERED BY (If other than Item 6) CODE BENG
Federal Bureau of Prisons Field Acquisition Office U.S. Armed Forces Reserve Complex 346 Marine Forces Drive Grand Prairie, TX 75051
Federal Bureau of Prisons FCI Englewood 9595 W. Quincy Ave Littleton, CO
8. NAME AND ADDRESS OF CONTRACTOR (No., street, country, state and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NO.
15B40319B00000001
X 9B. DATED (SEE ITEM 11)
10/03/2019
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
The purpose of Amendment 00004 is to incorporate:
1. The attached Clarifications, and
2. Revised Wage Determination, General Decision Number: CO20190023 dated 09/27/2019
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
Michelle Morgan
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
By (Signature of Contracting Officer)
16C. DATE SIGNED
NSN 7540-01-152-8070
Previous edition unusable
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
X X
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
NEW VEHICLE AND PEDESTRIAN GATES
FCI ENGLEWOOD
CLARIFICATIONS
QUESTION: Will this project be taxable or can the government provide a state tax exempt certificate?
BOP RESPONSE: The Government will not provide a tax exempt certificate.
QUESTION: Please confirm there will be no liquidated damages or retainage on this project.
BOP RESPONSE: There will be no liquidated damages associated with this project.
QUESTION: Please confirm that the contractor can attach the new vehicle gates on one side to the existing concrete columns and the other side to the existing gate support posts.
BOP RESPONSE: Yes, the contractor may attach the new vehicle gates to existing concrete posts and remaining vehicle gate support posts.
QUESTION: During the site visit the group was not allowed access to the interior gate. Please confinn that the dimensions of the existing interior gate are exactly the same as the exterior gate.
BOP RESPONSE: The interior gate is the same dimensions and utilizes the same equipment as the exterior gate. The concrete post and support post to remain as shown on the drawing.
QUESTION: During the site visit, the power and control work to make the gates operate was discussed. It is our understanding that all power and control work will be taken care of by the government. What, if any, power and control work will the contractor be responsible for?
BOP RESPONSE: The contractor will be responsible to connect existing electrical line and control voltage to the equipment as stated in the SOW.
QUESTION: The existing support posts for all pedestrian gates are not wide enough to accommodate the new pedestrian gates. Please confirm the contractor is required to set new support posts for the pedestrian gates.
BOP RESPONSE: The contractor can use existing post and set a new support post to provide proper clearance for the 2- 60" and 2- 48" new pedestrian gates.
QUESTION: Can the government provide a copyofFBOP Technical Design Guideline 08 71 63 as named in SOW Section O 1.11.00 page 2, 1.1.A.4?
BOP RESPONSE: FBOP Technical Design Guideline 08 71 63 are listed in the SOW on starting on page 16.
QUESTION: Can the government provide pictures of the gates that are to be replaced?
BOP RESPONSE: No, due to the safety and security concerns the government cannot provide pictures of the gates to be replaced.
QUESTION: Please confirm the pedestrian gates located near the vehicle gates are to be Tymetal 2150 (or Equal) with a I 050D electric lock (electrically operated).
BOP RESPONSE: Yes, the pedestrian gates are to be Tymetal 2150 (or Equal) with a 1050D electric lock (electrically operated).
QUESTION: Please confirm the gates leading between the perimeter fences are to be Tymetal 2150 (or Equal) with a I 050D mechanical lock (no electrical operation).
BOP RESPONSE: Yes, the pedestrian gates are to be Tymetal 2150 (or Equal) with a 1050D mechanical lock (Not electrically operated).
QUESTION: Will the pedestrian gates require door closers or door position switches?
BOP RESPONSE: The pedestrian gates located near the vehicle gates will not require door closures and door position switches. The gates leading between the perimeter fences do not require door closures or door position switches.
"General Decision Number: CO20190023 09/27/2019
Superseded General Decision Number: CO20180033
State: Colorado
Construction Type: Building
County: Jefferson County in Colorado.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.60 for calendar year 2019 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.60 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2019. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the
Page 1 of 11beta.SAM.gov
10/22/2019https://beta.sam.gov/wage-determination/CO20190023/4/document federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/04/2019 1 02/01/2019 2 02/22/2019 3 05/10/2019 4 09/27/2019
* CARP0055-004 05/01/2019
Rates Fringes
CARPENTER (Includes Acoustical Ceiling Installation and Drywall Hanging; Excludes Metal Stud Installation)....................$ 29.95 10.29
* CARP1607-001 06/01/2019
Rates Fringes
MILLWRIGHT.......................$ 32.00 16.43
* ELEC0068-012 06/01/2019
Rates Fringes
ELECTRICIAN (Includes Low Voltage Wiring)..................$ 36.50 16.18
Page 2 of 11beta.SAM.gov
ELEV0025-001 01/01/2019
Rates Fringes
ELEVATOR MECHANIC................$ 45.05 34.125
FOOTNOTE:
a.Vacation: 6%/under 5 years based on regular hourly rate for all hours worked. 8%/over 5 years based on regular hourly rate for all hours worked.
b. PAID HOLIDAYS: New Year's Day; Memorial Day; Independence Day; Labor Day; Veterans' Day; Thanksgiving Day; the Friday after Thanksgiving Day; and Christmas Day.
ENGI0009-017 05/01/2018
Rates Fringes
POWER EQUIPMENT OPERATOR
(Crane) 141 tons and over...........$ 31.07 10.70 50 tons and under...........$ 28.40 10.70 51 to 90 tons...............$ 28.57 10.70 91 to 140 tons..............$ 29.55 10.70
IRON0024-009 01/01/2019
Rates Fringes
IRONWORKER, ORNAMENTAL...........$ 29.85 11.42
IRON0024-010 01/01/2019
Rates Fringes
Page 3 of 11beta.SAM.gov
IRONWORKER, STRUCTURAL...........$ 29.85 11.42
PAIN0079-006 08/01/2017
Rates Fringes
PAINTER (Brush, Roller and Spray; Excludes Drywall Finishing/Taping)................$ 20.50 8.41
PAIN0079-007 08/01/2017
Rates Fringes
DRYWALL FINISHER/TAPER...........$ 21.20 8.41
PAIN0419-001 07/01/2016
Rates Fringes
SOFT FLOOR LAYER (Vinyl and Carpet)..........................$ 20.00 10.83
PAIN0930-002 07/01/2018
Rates Fringes
GLAZIER..........................$ 31.52 10.13
PLUM0003-009 06/01/2018
Rates Fringes
PLUMBER (Excludes HVAC Duct, Pipe and Unit Installation)......$ 35.48 15.94
PLUM0208-010 06/01/2018
Page 4 of 11beta.SAM.gov
Rates Fringes
PIPEFITTER (Includes HVAC Pipe Installation; Excludes HVAC Duct and Unit Installation)....................$ 37.55 14.95
SFCO0669-002 04/01/2017
Rates Fringes
SPRINKLER FITTER (Fire Sprinklers)......................$ 36.73 20.47
SHEE0009-006 07/01/2018
Rates Fringes
SHEET METAL WORKER (Includes HVAC Duct and Unit Installation; Excludes HVAC Pipe Installation)...............$ 34.02 17.49
SUCO2013-009 07/31/2015
Rates Fringes
BRICKLAYER.......................$ 21.96 0.00
CARPENTER (Metal Stud Installation Only)...............$ 17.68 0.00
CEMENT MASON/CONCRETE FINISHER...$ 20.33 6.76
INSULATOR - MECHANICAL
(Duct, Pipe & Mechanical
Page 5 of 11beta.SAM.gov
System Insulation)...............$ 23.12 7.97
LABORER: Common or General......$ 15.42 5.35
LABORER: Mason Tender - Brick...$ 15.99 0.00
LABORER: Mason Tender - Cement/Concrete..................$ 16.00 0.00
LABORER: Pipelayer..............$ 16.96 3.68
OPERATOR:
Backhoe/Excavator/Trackhoe.......$ 20.78 5.78
OPERATOR: Bobcat/Skid Steer/Skid Loader................$ 19.10 3.89
OPERATOR: Grader/Blade..........$ 21.50 0.00
ROOFER...........................$ 16.96 0.00
TRUCK DRIVER: Dump Truck........$ 17.34 0.00
WATERPROOFER.....................$ 16.94 0.00
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours
Page 6 of 11beta.SAM.gov they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of
Page 7 of 11beta.SAM.gov the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those
Page 8 of 11beta.SAM.gov classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal
Page 9 of 11beta.SAM.gov process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
Page 10 of 11beta.SAM.gov
END OF GENERAL DECISION"
Page 11 of 11beta.SAM.gov
| Amendment 4 |
| 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. |
| Clarification Responses |
| Wage Determination |
File details come from the government source that posted it.