1449_Solicitation_21Q0055.pdf
PDF 1 MB Posted
- Attached to
- API 653 Internal Tank Inspection Robins AFB, GA Federal contract opportunity
- Solicitation number
- W9128F21Q0055
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| ATT H - API Out-of-Service Telecon Briefing Template.docx | DOCX document | |
| ATT A-General Installation Security Requirements.docx | DOCX document | |
| ATT J - API Out-of-Service Template.docx | DOCX document | |
| ATT B-FY21-ROB-FAC 4302-Tank 23.xlsx | XLSX spreadsheet | |
| ATT D - ROB-FY11-FAC 4302-Tank 23-FINAL.pdf | ||
| ATT D - ROB-FY15-FAC 4302-Tank 23-FINAL.pdf | ||
| ATT G - Return To Service Letter.docx | DOCX document | |
| ATT I - API Out-of-Service Example.pdf | ||
| ATT C-Fuel Storage Excel Document.xlsx | XLSX spreadsheet | |
| ATT E-Monthly Contractors Progress Management and Status Reports.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W9128F21Q0055 22-Apr-2021
b. TELEPHONE NUMBER
402-995-2233
8. OFFER DUE DATE/LOCAL TIME
02:00 PM 06 May 2021
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W9128F9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
STEVEN D ENGEN
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESSX
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
U.S. ARMY CORPS OF ENGINEERS, OMAHA DIST
CONTRACTING OFFICE
1616 CAPITOL AVENUE
OMAHA NE 68102-4901
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE 966752 16. ADMINISTERED BY
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
COE PROGRAMS MANAGEMENT BRANCH
LAURA STEPHENS
USA, OMAHA CENWO-PM-P
1616 CAPITOL AVE
OMAHA NE 68102-4901
TEL: 402-995-2802 FAX:
FAX:
TEL: SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$16,500,000
NAICS:
541990
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF64
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
Section SF 1449 - CONTINUATION SHEET
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job API Out-of-Service Inspec. FAC-4302
FFP
API Out-of-Service, Tank Inspection Service – Facility 4302
All work to conduct Kick-Off Meeting, complete transfer/removal of fuel, complete tank cleaning, Complete API Out-of-Service, tank inspection, complete containment testing, hydrostatic testing, UT scan, and complete DRAFT and
FINAL reports.
FOB: Destination
PSC CD: H391
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0002 1 Job Wiper Seal Replacement Facility - 4302
FFP
All work to replace wiper seal and pan penetration seals accordance with the PWS.
NET AMT
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government
0002 Destination Government Destination Government
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 120 dys. ADC 1 COE PROGRAMS MANAGEMENT
BRANCH
LAURA STEPHENS
USA, OMAHA CENWO-PM-P
1616 CAPITOL AVE
OMAHA NE 68102-4901
402-995-2802
966752
0002 120 dys. ADC 1 (SAME AS PREVIOUS LOCATION)
966752
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 1 ATT A-General
Installation Security
Requirements
Attachment 10 ATT J - API Out-of-
Service Template
Attachment 2 ATT B-FY21-ROB-FAC
4302-Tank 23
Attachment 3 ATT C-Fuel Storage
Excel Document
Attachment 4 ATT D - ROB-FY11-
FAC 4302-Tank 23-
FINAL
Attachment 5 ATT D - ROB-FY15-
FAC 4302-Tank 23-
FINAL
Attachment 6 ATT E-Monthly
Contractors Progress, Management and Status R
Attachment 7 ATT G - Return To
Service Letter
Attachment 8 ATT H - API Out-of-
Service Telecon Briefing
Template
Attachment 9 ATT I - API Out-of-
Service Example
PERFORMANCE WORK STATEMENT
Tank Clean and API 653 Internal Inspection: Robins AFB, Georgia
Part 1
General Information
1. GENERAL: This is a non-personnel services contract to perform inspections on Department of Defense fuel tanks. This service may entail the removal and transfer of remaining fuel, cleaning, providing strapping charts, replacing wiper seals, and provide an above-ground storage tank (AST) API or STI inspection on tank(s) listed in the Attachement B. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn, is responsible to the Government.
1.1. Description of Services/Introduction: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to execute the fuel removal, transfer, or disposal of remaining fuel, clean the tank, then perform an API AST Internal and External inspection on the tank(s) as applicable at the location and tanks specified in Attachment B and wiper seal replacement as defined in the this Performance Work Statement
(PWS) except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract.
1.2. Background: This tank’s inspection is passed due and now the tank is out of compliance for over a year and is required to be internally inspected in order to be compliant with EPA, API and UFC requirements.
1.3. Objectives: Perform fuel removal, transfer, or disposal of approximately 5,000 gallons of remaining fuel, clean the tank, then perform an AST Internal and External inspection on the tank(s) as applicable at the location and tanks specified in attachment B and wiper seal replacement.
1.4. Scope: Remove and transfer of 5,000 gallons of fuel product. Contractor will be responsible for coordinating with the installation as to how the fuel will be transferred and stored during the services provided in this PWS. Any fuel or residual product that will be disposed of the contractor will be responsible to coordinate with environmental and safety authorities having jurisdiction to obtain and execute required permits, manifests, etc. Clean the tank and perform an internal API AST inspection to also include the visual inspection of the containment area.
1.4.1. Tank Cleaning: Contractor shall perform tank cleaning in accordance with UFGS 33 01 50.60.
1.4.2. Tank Inspection: The tank inspection shall be in conformance with applicable industry standards
API 653, NFPA 30, NFPA 326, UFGS 33 01 50.60, and in compliance with 40 CFR 112, UFC 3-460-01, UFC 3-460-03 and any other applicable federal, state, local, service or host nation requirements.
1.5 Period of Performance: The period of performance shall be for 120 calendar days starting at the date of contract award.
1.6. General Information
1.6.1. Quality Assurance: The government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).
1.6.2. Recognized Holidays: The Contractor is not required to perform work on federal holidays that fall within the POP identified in 1.5.
1.6.3. Hours of Operation: The contractor is responsible for conducting business, between the hours of 0730-
1630 Monday through Friday, except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. Other than normal duty hours must be coordinated with the KO or his/her designated representative. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the
Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall maintain stability and continuity of the workforce.
1.6.4. Place of Performance: The work to be performed under this contract will be performed at the location specified in Attachment B.
1.6.5. Type of Contract: The government will award a Firm Fixed Price Contract
1.6.6. Security Requirements: Reference Attachment A – General Installation Security Requirements
1.6.7. Site Access: Contractor shall coordinate with the installation personnel for access to the site. Points of contact for the installation will be provided upon award.
1.6.8. Meetings/Kick-Off Meetings: The Contractor shall coordinate with USACE PM and conduct a kickoff meetings prior to field activities. This can be accomplished either prior to mobilization and inspection activities or onsite prior to commencement of inspection activities. The Work Plan shall be discussed and further coordination and scheduling accomplished at this meeting. These meetings shall be at no additional cost to the government.
1.6.8.1 Out of Service Out Brief: The Contractor shall be responsible to establish a report of findings and coordinate a teleconference after the inspection is complete and at least 24 hours prior to placing tank back in service. This teleconference will review deficiencies found during the inspection with the Government making the final decision on whether or not to place this tank back into service. The Contractor can use Attachment J- API
OUT-OF-SERVICE TELECON BRIEFING TEMPLATE or their own format however this document shall include the next recommended inspection intervals for both In-Service and Out-of-Service Inspection, and State regulated inspection intervals, if applicable. Also when listing the findings they shall be categorized as either “Mandatory”, “Short Term” or “Long Term”. Please coordinate with POC’s from AFPET, DLA and USACE. Individuals to be on the teleconference will be provided after award.
1.6.9. Contracting Officer Representative (COR): The (COR) will be identified by separate letter.
The COR is authorized to perform the following functions:
assure that the Contractor performs the technical requirements of the contract perform inspections necessary in connection with contract performance maintain written and oral communications with the Contractor concerning technical aspects of the contract issue written interpretations of technical requirements, including Government drawings, designs, specification monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies coordinate availability of government furnished property provide site entry of Contractor personnel
A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regards to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.
1.6.10. Key Personnel: The follow personnel are considered key personnel by the government: Certified
API 653 Inspector, Site Safety, and Project Manager.
1.6.11. Organizational Conflict of Interest: Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information
(e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI) as defined in FAR Subpart 9.5. The Contractor shall notify the Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the
Contracting Officer to avoid or mitigate any such OCI. The Contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the Contracting Officer and in the event the Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may effect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.
PART 2
DEFINITIONS & ACRONYMS
2. DEFINITIONS AND ACRONYMS:
2.1. DEFINITIONS:
2.1.1. CONTRACTOR. A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.
2.1.2. CONTRACTING OFFICER. A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.
2.1.3. CONTRACTING OFFICER'S REPRESENTATIVE (COR). An employee of the
U.S. Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
2.1.4. DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the Performance Work Statement.
2.1.5. DELIVERABLE. Anything that can be physically delivered, but may include non- manufactured things such as meeting minutes or reports.
2.1.6. KEY PERSONNEL. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.
2.1.7. PHYSICAL SECURITY. Actions that prevent the loss or damage of Government property.
2.1.8. QUALITY ASSURANCE. The government procedures to verify that services being performed by the
Contractor are performed according to acceptable standards.
2.1.9. QUALITY ASSURANCE Surveillance Plan (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.
2.1.10. QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.
2.1.11. SUBCONTRACTOR. One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.
2.1.12. WORKDAY. The number of hours per day the Contractor provides services in accordance with the contract.
2.1.12. WORK WEEK. Monday through Friday, unless specified otherwise.
2.2. ACRONYMS:
ACOR Alternate Contracting Officer's Representative AFARS Army Federal Acquisition Regulation Supplement ANG Army National Guard AR Army Regulation
AST Aboveground Storage Tank API American Petroleum Institute ATG Automatic Tank Gauging AWWA American Water Works Association CCE Contracting Center of Excellence CFR Code of Federal Regulations CONUS Continental United States (excludes Alaska and Hawaii) COR Contracting Officer Representative COTR Contracting Officer's Technical Representative COTS Commercial-Off-the-Shelf DAF Department of the Air Force DD250 Department of Defense Form 250 (Receiving Report) DD254 Department of Defense Contract Security Requirement List DFARS Defense Federal Acquisition Regulation Supplement DMDC Defense Manpower Data Center DOD Department of Defense EPA Environmental Protection Agency FAR Federal Acquisition Regulation HIPAA Health Insurance Portability and Accountability Act of 1996 IAP International Airport KO Contracting Officer MOGAS Motor Gasoline NFPA National Fire Protection Association OCI Organizational Conflict of Interest OCONUS Outside Continental United States (includes Alaska and Hawaii) ODC Other Direct Costs PIPO Phase In/Phase Out POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QAP Quality Assurance Program QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program RTO Returned to Operator TE Technical Exhibit UFC Unified Facilities Criteria UFGS Unified Facilities Guide Specification
PART 3
GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND
SERVICES
3. GOVERNMENT FURNISHED ITEMS AND SERVICES:
3.1. Services: No Government furnished items or services are required.
PART 4
CONTRACTOR FURNISHED ITEMS AND SERVICES
4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:
4.1. General: The Contractor shall furnish all supplies, equipment, facilities and services required to perform work under this contract that are not listed under Section 3 of this PWS.
4.2. Equipment: The Contractor shall provide all tools and inspection equipment needed to perform the inspection and other services to be performed under the PWS.
4.3. Project Inspection Management Plan (PMP):
After contract award the Contractor shall develop a Project / Inspection Management Plan for the assigned facility. The Contractor shall review all available Tank data and inspection reports, particularly the installation SPCC Plan’s Tank inspection requirements, previous inspection reports, and existing owner inspection reports. The Contractor may also submit additional data requests to the Installation for any other information which may be helpful in pre-inspection and Work Plan preparation.
As part of the initial PMP, the Contractor shall prepare and include a brief (< 10 pages) Work Plan, as an attachment, which will include proposed schedule, inspection activities, personnel performing inspection, required training certificates, and additional data or support requests.
4.4. Health and Safety Plan (HSP) and Accident Prevention Plan (APP):
The Contractor will prepare a Health and Safety Plan (HSP) to comply with 29 Code of Federal Regulations (CFR) 1910 and 1926 as well as applicable Military Service (Army, Air Force, or Navy), OSHA, state, host nation, and local and installation health and safety regulations regarding the proposed work effort.
Qualifications for individuals who will be on-site for safety shall be submitted in the HSP.
The Accident Prevention Plan (APP) is required by FAR clause 52.236-13. The APP describes the methods by which the contractor or USACE personnel will meet the safety and health requirements listed in EM 385- 1-1, Entry into Confined Spaces shall comply with the requirements of 29 CFR 1910.146.
Abbreviated Accident Prevention Plans may be developed and submitted per Form A- 01 Abbreviated Accident Prevention Plan Checklist page A-13 of the EM 385-1-1. This may be submitted in order to develop a plan more specific to the work performed under this PWS but shall still comply as indicated above.
PART 5
SPECIFIC TASKS
5. Specific Tasks:
5.1. Basic Services.
5.1.1. Perform a Tele-con kick-off meeting either prior to mobilization or the morning of the commencement of work on-site.
5.1.2. Remove and transfer of 5,000 gallons of fuel product.
5.1.3. Clean the tank and perform an internal AST inspection to also include the visual inspection of the containment area. Tank cleaning shall be done in accordance with UFGS 33 01 50.60. The tank Inspection shall be in conformance with applicable industry standards API 653, NFPA 30, NFPA 326, UFGS 33 01 50.60, and in compliance with 40 CFR 112, UFC 3-460-01, UFC 3-460-03 and any other applicable federal, state, local, service or host nation requirements. At a minimum, table 8-1 within UFC 3-460-01 shall be followed. All tank appurtenances that are required shall be documented along with all required appurtenances that aren’t present.
Alarms, Automatic Tank Gauge equipment, and all tank appurtenances shall be tested and verified. The contractor shall visually inspect containment for ability to contain the entire contents of the tank in the event of catastrophic failure, assessing for cracks, settlement, and deterioration. Record dimensions of cracks and provide photographic evidence of each deficiency.
5.1.4. Hydrostatically test the containment inlet, basin, line, valve. Visually assess the liner integrity and impermeability where applicable. Each containment drain inlet, drain line and containment drain valve shall be hydrostatically tested to assure the drainage system is liquid tight. The Contractor shall perform a hydrostatic test to ensure the drainpipe and release valve do not leak. The Contractor shall perform a hydrostatic test to ensure the integrity of the inlet sump. Drain Line and Release Valve. The Contractor shall perform a hydrostatic test to ensure the drainpipe and release valve do not leak. Test in accordance with applicable requirements of AWWA C600 for hydrostatic testing. Ensure the release valve is closed and pressurize the end of the pipe within the containment basin sump. Test for leakage by filling the pipe with water and pressurizing to 10 psi using a suitable pump connected to the pipeline. The test pressure shall not vary by more than ±1 psi for the duration of the test. Hold this pressure for not less than 2 hours. If the system does not hold pressure, check the outfall point to see if water is bypassing the valve. Test pressure shall be maintained during the test by adding makeup water through the pressure test pump into the pipeline. Accurately note the amount of makeup water required to maintain pressure during the test. Containment Drain Inlet. The Contractor shall perform a hydrostatic test to ensure the integrity of the inlet sump. Test for leakage by filling the inlet with water to a level at least 1-2 inches above the top of the inlet structure. The inlet shall hold this water for not less than 2 hours with no measurable change in the water level.
5.1.5. UT Scan. Coverage of the UT scan shall include 5 points per shell plate on the first shell course. Spot UT scans shall be made once every foot along the circumference of the tank shell within the critical zone and along the tank chime as accessible. 5 points per shell plate should also be taken along the spiral staircase for each shell course as accessible. Provide UT scans of tank shell nozzles on the first shell course and their respective reinforcements plates as applicable. Include all findings in the inspection report.
5.1.6. Replace existing wiper seal. The existing wiper seal (foam log, double wiper etc.) shall be removed and completely replaced with a new double wiper seal in accordance with UFGS 33 56 21.17 and the IFR manufacturer's recommendations; penetration seals in the floating pan will also need replaced.
5.1.7. Provide legible tank stencil or label on tank. Upon completion of the Out-of- Service inspection the contractor shall provide a legible tank stencil or decal, consisting of black letters at least 1” in height, stating the date cleaned and inspected, the contractor’s name and the name of the contractor’s personnel supervising the work. Remove any existing stencils displaying previous inspection information. New information shall be provided in the following format:
Date Cleaned and Inspected: Day-Month-Year ABC
Contracting
Supervisor: John Doe
5.1.8. Provide Teleconference out briefing prior to closing up the tank. The Contractor shall be responsible to establish a report of findings and coordinate a teleconference after the inspection is complete and at least 24 hours prior to placing tank back in service. This teleconference will review deficiencies found during the inspection with the Government making the final decision on whether or not to place this tank back into service. The Contractor can use Attachment J- API OUT-OF-SERVICE TELECON BRIEFING TEMPLATE or their own format however this document shall include the next recommended inspection intervals for both In-Service and Out-of-Service
Inspection, and State regulated inspection intervals, if applicable. Also when listing the findings they shall be categorized as either “Mandatory”, “Short Term” or “Long Term”. Please coordinate with the following individuals in addition to on Installation personnel:
5.1.9. Provide DRAFT and FINAL inspection reports per the attached templates
PART 6
APPLICABLE PUBLICATIONS
6. APPLICABLE PUBLICATIONS (CURRENT EDITIONS)
6.1. The Contractor must abide by all applicable regulations, publications, manuals, and local policies and procedures.
American Petroleum Institute (API) 650 – Welded Tanks for Oil Storage 653 – Standard for the Tank Inspection, Repair, Alteration, and Reconstruction
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 30 – Flammable and Combustible Liquids Code NFPA 70 - National Electrical Code (NEC) NFPA 326 – Standard for Safeguarding of Tanks and Containers for Entry, Cleaning, or Repairs
UNIFIED FACILITIES CRITERIA (UFC)
UFC 3-460-01 Design: Petroleum Fuel Facilities UFC 3-460- 03 Petroleum Fuel Systems Maintenance
UNIFIED FACILITIES GUIDE SPECIFICATIONS (UFGS)
UFGS 33 01 50.60 Cleaning of Petroleum Storage Tanks UFGS 33 56 21.17 Single Wall Aboveground Fixed Roof Steel POL Storage
Tank
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
40 CFR 112 EPA: Oil Pollution Prevention
PART 7
PERFORMANCE REQUIREMENTS SUMMARY
The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.
Performance Objective Standard Performance
Threshold Method of Surveillance
PRS # 1.
Kick-Off Meeting with USACE and Stakeholders
State, local, and federal requirements regulating fuel storage tanks
100% The contractor will schedule this Meeting either on-site prior to commencement of work or via tel-con prior to being onsite. Submit agenda and meeting minutes to stakeholders.
PRS # 2.
Remove and transfer 5,000 gal of fuel product from the
AST
State, local, and federal requirements regulating fuel storage tanks
100% Contractor will coordinate the transfer of the fuel with the installation.
Random Inspection.
PRS # 3.
Clean AST
State, local, and federal requirements regulating fuel storage tanks
100% Random Inspection
PRS # 4.
Provide an API 653 Internal Inspection and visual inspection of the containment area
State, local, and federal requirements regulating fuel storage tanks
100% Random Inspection.
The contractor is to provide a DRAFT and FINAL report for MCX review and comment
PRS #5.
Replace the manway bolts with stainless steel bolts and replace the manway gasket prior to filling the tank
State, local and federal requirements regulating fuel storage tanks
100% Random Inspection.
Photos in the draft and final reports
PRS # 6.
Out-Brief Meeting with USACE and Stakeholders
State, local, and federal requirements regulating fuel storage tanks
100% Participation in the out brief.
PRS # 7.
Replace the existing wiper seal and penetration seals
Manufacturer’s Instructions as well as State, local, and federal requirements regulating fuel storage tanks
100% Random Inspection.
PRS #8.
Fill with product past the first shell course manway elevation to ensure no leaks after tank closure
State, local and federal requirements regulating fuel storage tanks
100% Random Inspection
PART 8
W9128F21Q0055
DELIVERABLES SCHEDULE
DELIVERABLE SCOPE OF
WORK
PARAGRAPH
DUE DATE
Project Inspection Management Plan/Work Plan & Health and Safety Plan (Draft)
4.3 & 4.4 15 days after award
Project Inspection Management Plan/Work Plan & Health and Safety Plan (Final)
4.3 & 4.4 5 days after receipt of comments
Inspection and Evaluation Report – (Draft) 5.1.9 28 days after Field Inspection
Inspection and Evaluation Report – to include populated Attachment C Excel Sheet for each base (Final)
5.1.9 7 days after receipt of comments
PART 9
ATTACHMENT LISTING
9. Attachment List:
9.1. Attachment A – General Installation Security Requirements
9.2. Attachment B – Fuel Storage Tank List
9.3. Attachment C – Fuel Storage Tank Excel Document
9.4. Attachment D – Previous Inspection Report
9.5. Attachment E – Monthly Contractors Progress, Management and Status Report
9.6. Attachment F – Not Used
9.7. Attachment G – Return to Service Letter
9.8. Attachment H – API Out of Service Telecon Briefing Template
9.9. Attachment I – API Out of Service Example
9.10 Attachment J – API Out of Service Template
SCA WAGE RATES
"REGISTER OF WAGE DETERMINATIONS UNDER | U.S. DEPARTMENT OF LABOR
THE SERVICE CONTRACT ACT | EMPLOYMENT STANDARDS ADMINISTRATION
By direction of the Secretary of Labor | WAGE AND HOUR DIVISION
| WASHINGTON D.C. 20210
| Wage Determination No.: 2015-4495
Daniel W. Simms Division of | Revision No.: 13
Director Wage Determinations| Date Of Last Revision: 12/21/2020
Note: Under Executive Order (EO) 13658 an hourly minimum wage of $10.95 for calendar year 2021 applies to all contracts subject to the Service Contract
Act for which the contract is awarded (and any solicitation was issued) on or after January 1 2015. If this contract is covered by the EO the contractor must pay all workers in any classification listed on this wage determination at least $10.95 per hour (or the applicable wage rate listed on this wage determination if it is higher) for all hours spent performing on the contract in calendar year 2021. The EO minimum wage rate will be adjusted annually.
Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
State: Georgia
Area: Georgia Counties of Houston Peach Pulaski
**Fringe Benefits Required Follow the Occupational Listing**
OCCUPATION CODE - TITLE FOOTNOTE RATE
01000 - Administrative Support And Clerical Occupations
01011 - Accounting Clerk I 14.50
01012 - Accounting Clerk II 16.28
01013 - Accounting Clerk III 18.22
01020 - Administrative Assistant 24.45
01035 - Court Reporter 17.69
01041 - Customer Service Representative I 12.17
01042 - Customer Service Representative II 13.69
01043 - Customer Service Representative III 14.93
01051 - Data Entry Operator I 15.14
01052 - Data Entry Operator II 16.51
01060 - Dispatcher Motor Vehicle 19.67
01070 - Document Preparation Clerk 14.09
01090 - Duplicating Machine Operator 14.09
01111 - General Clerk I 12.40
01112 - General Clerk II 13.53
01113 - General Clerk III 15.19
01120 - Housing Referral Assistant 19.72
01141 - Messenger Courier 11.48
01191 - Order Clerk I 13.18
01192 - Order Clerk II 15.06
01261 - Personnel Assistant (Employment) I 16.57
01262 - Personnel Assistant (Employment) II 18.54
01263 - Personnel Assistant (Employment) III 20.67
01270 - Production Control Clerk 28.39
01290 - Rental Clerk 12.33
01300 - Scheduler Maintenance 15.81
01311 - Secretary I 15.81
01312 - Secretary II 17.69
01313 - Secretary III 19.72
01320 - Service Order Dispatcher 17.04
01410 - Supply Technician 24.45
01420 - Survey Worker 15.86
01460 - Switchboard Operator/Receptionist 12.83
01531 - Travel Clerk I 12.23
01532 - Travel Clerk II 13.26
01533 - Travel Clerk III 14.29
01611 - Word Processor I 14.09
01612 - Word Processor II 15.81
01613 - Word Processor III 17.69
05000 - Automotive Service Occupations
05005 - Automobile Body Repairer Fiberglass 21.70
05010 - Automotive Electrician 17.65
05040 - Automotive Glass Installer 16.98
05070 - Automotive Worker 16.98
05110 - Mobile Equipment Servicer 15.63
05130 - Motor Equipment Metal Mechanic 18.36
05160 - Motor Equipment Metal Worker 16.98
05190 - Motor Vehicle Mechanic 17.86
05220 - Motor Vehicle Mechanic Helper 14.95
05250 - Motor Vehicle Upholstery Worker 16.30
05280 - Motor Vehicle Wrecker 16.98
05310 - Painter Automotive 17.65
05340 - Radiator Repair Specialist 16.98
05370 - Tire Repairer 14.01
05400 - Transmission Repair Specialist 18.36
07000 - Food Preparation And Service Occupations
07010 - Baker 12.41
07041 - Cook I 10.83
07042 - Cook II 11.89
07070 - Dishwasher 8.99
07130 - Food Service Worker 10.45
07210 - Meat Cutter 15.24
07260 - Waiter/Waitress 8.84
09000 - Furniture Maintenance And Repair Occupations
09010 - Electrostatic Spray Painter 22.36
09040 - Furniture Handler 16.09
09080 - Furniture Refinisher 22.36
09090 - Furniture Refinisher Helper 18.37
09110 - Furniture Repairer Minor 20.41
09130 - Upholsterer 22.36
11000 - General Services And Support Occupations
11030 - Cleaner Vehicles 10.26
11060 - Elevator Operator 11.44
11090 - Gardener 13.56
11122 - Housekeeping Aide 11.44
11150 - Janitor 11.44
11210 - Laborer Grounds Maintenance 11.01
11240 - Maid or Houseman 9.00
11260 - Pruner 10.15
11270 - Tractor Operator 12.43
11330 - Trail Maintenance Worker 11.01
11360 - Window Cleaner 12.41
12000 - Health Occupations
12010 - Ambulance Driver 15.41
12011 - Breath Alcohol Technician 17.41
12012 - Certified Occupational Therapist Assistant 25.53
12015 - Certified Physical Therapist Assistant 29.68
12020 - Dental Assistant 19.08
12025 - Dental Hygienist 28.93
12030 - EKG Technician 28.20
12035 - Electroneurodiagnostic Technologist 28.20
12040 - Emergency Medical Technician 15.41
12071 - Licensed Practical Nurse I 16.63
12072 - Licensed Practical Nurse II 18.61
12073 - Licensed Practical Nurse III 20.74
12100 - Medical Assistant 14.21
12130 - Medical Laboratory Technician 23.61
12160 - Medical Record Clerk 14.16
12190 - Medical Record Technician 15.93
12195 - Medical Transcriptionist 16.14
12210 - Nuclear Medicine Technologist 40.89
12221 - Nursing Assistant I 11.35
12222 - Nursing Assistant II 12.76
12223 - Nursing Assistant III 13.92
12224 - Nursing Assistant IV 15.62
12235 - Optical Dispenser 21.66
12236 - Optical Technician 16.63
12250 - Pharmacy Technician 13.63
12280 - Phlebotomist 13.96
12305 - Radiologic Technologist 23.48
12311 - Registered Nurse I 24.92
12312 - Registered Nurse II 30.49
12313 - Registered Nurse II Specialist 30.49
12314 - Registered Nurse III 36.89
12315 - Registered Nurse III Anesthetist 36.89
12316 - Registered Nurse IV 44.21
12317 - Scheduler (Drug and Alcohol Testing) 23.05
12320 - Substance Abuse Treatment Counselor 25.64
13000 - Information And Arts Occupations
13011 - Exhibits Specialist I 23.71
13012 - Exhibits Specialist II 29.39
13013 - Exhibits Specialist III 35.95
13041 - Illustrator I 23.71
13042 - Illustrator II 29.39
13043 - Illustrator III 35.95
13047 - Librarian 32.76
13050 - Library Aide/Clerk 15.94
13054 - Library Information Technology Systems 29.57
Administrator
13058 - Library Technician 17.94
13061 - Media Specialist I 21.20
13062 - Media Specialist II 23.71
13063 - Media Specialist III 26.46
13071 - Photographer I 17.93
13072 - Photographer II 22.75
13073 - Photographer III 26.64
13074 - Photographer IV 32.61
13075 - Photographer V 39.48
13090 - Technical Order Library Clerk 17.90
13110 - Video Teleconference Technician 21.34
14000 - Information Technology Occupations
14041 - Computer Operator I 16.12
14042 - Computer Operator II 17.88
14043 - Computer Operator III 20.58
14044 - Computer Operator IV 24.21
14045 - Computer Operator V 27.26
14071 - Computer Programmer I (see 1) 21.48
14072 - Computer Programmer II (see 1) 26.62
14073 - Computer Programmer III (see 1)
14074 - Computer Programmer IV (see 1)
14101 - Computer Systems Analyst I (see 1)
14102 - Computer Systems Analyst II (see 1)
14103 - Computer Systems Analyst III (see 1)
14150 - Peripheral Equipment Operator 16.12
14160 - Personal Computer Support Technician 24.21
14170 - System Support Specialist 30.83
15000 - Instructional Occupations
15010 - Aircrew Training Devices Instructor (Non-Rated) 29.13
15020 - Aircrew Training Devices Instructor (Rated) 35.24
15030 - Air Crew Training Devices Instructor (Pilot) 42.24
15050 - Computer Based Training Specialist / Instructor 29.61
15060 - Educational Technologist 39.81
15070 - Flight Instructor (Pilot) 42.24
15080 - Graphic Artist 27.24
15085 - Maintenance Test Pilot Fixed Jet/Prop 42.24
15086 - Maintenance Test Pilot Rotary Wing 42.24
15088 - Non-Maintenance Test/Co-Pilot 42.24
15090 - Technical Instructor 30.57
15095 - Technical Instructor/Course Developer 37.38
15110 - Test Proctor 24.65
15120 - Tutor 24.65
16000 - Laundry Dry-Cleaning Pressing And Related Occupations
16010 - Assembler 9.54
16030 - Counter Attendant 9.54
16040 - Dry Cleaner 11.07
16070 - Finisher Flatwork Machine 9.54
16090 - Presser Hand 9.54
16110 - Presser Machine Drycleaning 9.54
16130 - Presser Machine Shirts 9.54
16160 - Presser Machine Wearing Apparel Laundry 9.54
16190 - Sewing Machine Operator 11.69
16220 - Tailor 12.24
16250 - Washer Machine 10.09
19000 - Machine Tool Operation And Repair Occupations
19010 - Machine-Tool Operator (Tool Room) 24.61
19040 - Tool And Die Maker 28.62
21000 - Materials Handling And Packing Occupations
21020 - Forklift Operator 18.36
21030 - Material Coordinator 28.39
21040 - Material Expediter 28.39
21050 - Material Handling Laborer 15.14
21071 - Order Filler 12.68
21080 - Production Line Worker (Food Processing) 18.36
21110 - Shipping Packer 18.24
21130 - Shipping/Receiving Clerk 18.24
21140 - Store Worker I 14.93
21150 - Stock Clerk 18.73
21210 - Tools And Parts Attendant 18.36
21410 - Warehouse Specialist 18.36
23000 - Mechanics And Maintenance And Repair Occupations
23010 - Aerospace Structural Welder 29.22
23019 - Aircraft Logs and Records Technician 24.63
23021 - Aircraft Mechanic I 28.13
23022 - Aircraft Mechanic II 29.22
23023 - Aircraft Mechanic III 30.42
23040 - Aircraft Mechanic Helper 22.09
23050 - Aircraft Painter 26.97
23060 - Aircraft Servicer 24.63
23070 - Aircraft Survival Flight Equipment Technician 26.97
23080 - Aircraft Worker 25.78
23091 - Aircrew Life Support Equipment (ALSE) Mechanic 25.78
I
23092 - Aircrew Life Support Equipment (ALSE) Mechanic 28.13
II
23110 - Appliance Mechanic 22.36
23120 - Bicycle Repairer 19.47
23125 - Cable Splicer 27.63
23130 - Carpenter Maintenance 21.82
23140 - Carpet Layer 21.68
23160 - Electrician Maintenance 28.13
23181 - Electronics Technician Maintenance I 26.33
23182 - Electronics Technician Maintenance II 27.55
23183 - Electronics Technician Maintenance III 28.73
23260 - Fabric Worker 20.41
23290 - Fire Alarm System Mechanic 23.31
23310 - Fire Extinguisher Repairer 19.47
23311 - Fuel Distribution System Mechanic 27.20
23312 - Fuel Distribution System Operator 22.72
23370 - General Maintenance Worker 17.29
23380 - Ground Support Equipment Mechanic 28.13
23381 - Ground Support Equipment Servicer 24.63
23382 - Ground Support Equipment Worker 25.78
23391 - Gunsmith I 19.47
23392 - Gunsmith II 21.37
23393 - Gunsmith III 23.31
23410 - Heating Ventilation And Air-Conditioning 18.95
Mechanic
23411 - Heating Ventilation And Air Contidioning 19.90
Mechanic (Research Facility)
23430 - Heavy Equipment Mechanic 23.30
23440 - Heavy Equipment Operator 17.69
23460 - Instrument Mechanic 23.31
23465 - Laboratory/Shelter Mechanic 22.36
23470 - Laborer 15.14
23510 - Locksmith 22.36
23530 - Machinery Maintenance Mechanic 28.14
23550 - Machinist Maintenance 28.14
23580 - Maintenance Trades Helper 18.37
23591 - Metrology Technician I 23.31
23592 - Metrology Technician II 24.22
23593 - Metrology Technician III 25.21
23640 - Millwright 23.65
23710 - Office Appliance Repairer 22.36
23760 - Painter Maintenance 26.96
23790 - Pipefitter Maintenance 26.00
23810 - Plumber Maintenance 24.93
23820 - Pneudraulic Systems Mechanic 23.31
23850 - Rigger 23.31
23870 - Scale Mechanic 21.37
23890 - Sheet-Metal Worker Maintenance 27.55
23910 - Small Engine Mechanic 21.37
23931 - Telecommunications Mechanic I 25.88
23932 - Telecommunications Mechanic II 26.88
23950 - Telephone Lineman 23.65
23960 - Welder Combination Maintenance 23.67
23965 - Well Driller 23.31
23970 - Woodcraft Worker 23.31
23980 - Woodworker 19.47
24000 - Personal Needs Occupations
24550 - Case Manager 15.70
24570 - Child Care Attendant 9.10
24580 - Child Care Center Clerk 12.58
24610 - Chore Aide 9.91
24620 - Family Readiness And Support Services 15.70
Coordinator
24630 - Homemaker 15.70
25000 - Plant And System Operations Occupations
25010 - Boiler Tender 23.65
25040 - Sewage Plant Operator 22.41
25070 - Stationary Engineer 23.65
25190 - Ventilation Equipment Tender 18.37
25210 - Water Treatment Plant Operator 22.41
27000 - Protective Service Occupations
27004 - Alarm Monitor 17.03
27007 - Baggage Inspector 13.52
27008 - Corrections Officer 17.22
27010 - Court Security Officer 18.06
27030 - Detection Dog Handler 15.11
27040 - Detention Officer 17.22
27070 - Firefighter 18.01
27101 - Guard I 13.52
27102 - Guard II 15.11
27131 - Police Officer I 18.97
27132 - Police Officer II 21.08
28000 - Recreation Occupations
28041 - Carnival Equipment Operator 10.87
28042 - Carnival Equipment Repairer 11.57
28043 - Carnival Worker 8.78
28210 - Gate Attendant/Gate Tender 13.99
28310 - Lifeguard 11.91
28350 - Park Attendant (Aide) 15.64
28510 - Recreation Aide/Health Facility Attendant 11.42
28515 - Recreation Specialist 18.18
28630 - Sports Official 12.46
28690 - Swimming Pool Operator 14.20
29000 - Stevedoring/Longshoremen Occupational Services
29010 - Blocker And Bracer 21.68
29020 - Hatch Tender 21.68
29030 - Line Handler 21.68
29041 - Stevedore I 20.71
29042 - Stevedore II 22.68
30000 - Technical Occupations
30010 - Air Traffic Control Specialist Center (HFO) (see 2) 39.89
30011 - Air Traffic Control Specialist Station (HFO) (see 2) 27.50
30012 - Air Traffic Control Specialist Terminal (HFO) (see 2) 30.29
30021 - Archeological Technician I 18.00
30022 - Archeological Technician II 20.72
30023 - Archeological Technician III 22.22
30030 - Cartographic Technician 23.13
30040 - Civil Engineering Technician 26.88
30051 - Cryogenic Technician I 24.61
30052 - Cryogenic Technician II 27.17
30061 - Drafter/CAD Operator I 18.00
30062 - Drafter/CAD Operator II 20.72
30063 - Drafter/CAD Operator III 20.95
30064 - Drafter/CAD Operator IV 24.44
30081 - Engineering Technician I 14.47
30082 - Engineering Technician II 16.46
30083 - Engineering Technician III 18.42
30084 - Engineering Technician IV 22.50
30085 - Engineering Technician V 27.52
30086 - Engineering Technician VI 33.31
30090 - Environmental Technician 22.26
30095 - Evidence Control Specialist 22.22
30210 - Laboratory Technician 20.95
30221 - Latent Fingerprint Technician I 24.61
30222 - Latent Fingerprint Technician II 27.17
30240 - Mathematical Technician 22.22
30361 - Paralegal/Legal Assistant I 19.01
30362 - Paralegal/Legal Assistant II 23.54
30363 - Paralegal/Legal Assistant III 28.80
30364 - Paralegal/Legal Assistant IV 34.84
30375 - Petroleum Supply Specialist 27.17
30390 - Photo-Optics Technician 22.22
30395 - Radiation Control Technician 27.17
30461 - Technical Writer I 21.37
30462 - Technical Writer II 26.14
30463 - Technical Writer III 31.63
30491 - Unexploded Ordnance (UXO) Technician I 25.35
30492 - Unexploded Ordnance (UXO) Technician II 30.67
30493 - Unexploded Ordnance (UXO) Technician III 36.76
30494 - Unexploded (UXO) Safety Escort 25.35
30495 - Unexploded (UXO) Sweep Personnel 25.35
30501 - Weather Forecaster I 24.61
30502 - Weather Forecaster II 29.93
30620 - Weather Observer Combined Upper Air Or (see 2) 20.95
Surface Programs
30621 - Weather Observer Senior (see 2) 22.22
31000 - Transportation/Mobile Equipment Operation Occupations
31010 - Airplane Pilot 30.67
31020 - Bus Aide 14.31
31030 - Bus Driver 18.15
31043 - Driver Courier 13.52
31260 - Parking and Lot Attendant 13.19
31290 - Shuttle Bus Driver 14.31
31310 - Taxi Driver 13.99
31361 - Truckdriver Light 14.31
31362 - Truckdriver Medium 15.10
31363 - Truckdriver Heavy 19.01
31364 - Truckdriver Tractor-Trailer 19.01
99000 - Miscellaneous Occupations
99020 - Cabin Safety Specialist 14.95
99030 - Cashier 9.91
99050 - Desk Clerk 9.17
99095 - Embalmer 25.35
99130 - Flight Follower 25.35
99251 - Laboratory Animal Caretaker I 13.57
99252 - Laboratory Animal Caretaker II 14.28
99260 - Marketing Analyst 30.30
99310 - Mortician 25.35
99410 - Pest Controller 16.65
99510 - Photofinishing Worker 13.32
99710 - Recycling Laborer 16.64
99711 - Recycling Specialist 20.77
99730 - Refuse Collector 15.28
99810 - Sales Clerk 11.45
99820 - School Crossing Guard 15.55
99830 - Survey Party Chief 18.61
99831 - Surveying Aide 14.37
99832 - Surveying Technician 16.93
99840 - Vending Machine Attendant 20.06
99841 - Vending Machine Repairer 23.42
99842 - Vending Machine Repairer Helper 20.06
Note: Executive Order (EO) 13706 Establishing Paid Sick Leave for Federal
Contractors applies to all contracts subject to the Service Contract Act for which the contract is awarded (and any solicitation was issued) on or after January 1
2017. If this contract is covered by the EO the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work up to 56 hours of paid sick leave each year. Employees must be permitted to use paid sick leave for their own illness injury or other health-related needs including preventive care; to assist a family member (or person who is like family to the employee) who is ill injured or has other health-related needs including preventive care; or for reasons resulting from or to assist a family member (or person who is like family to the employee) who is the victim of domestic violence sexual assault or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
ALL OCCUPATIONS LISTED ABOVE RECEIVE THE FOLLOWING BENEFITS:
HEALTH & WELFARE: $4.54 per hour up to 40 hours per week or $181.60 per week or
$786.93 per month
HEALTH & WELFARE EO 13706: $4.22 per hour up to 40 hours per week or $168.80 per week or $731.47 per month*
*This rate is to be used only when compensating employees for performance on an SCA-covered contract also covered by EO 13706 Establishing Paid Sick Leave for Federal
Contractors. A contractor may not receive credit toward its SCA obligations for any paid sick leave provided pursuant to EO 13706.
VACATION: 2 weeks paid vacation after 1 year of service with a contractor or successor; 3 weeks after 8 years and 4 weeks after 20 years. Length of service includes the whole span of continuous service with the present contractor or successor wherever employed and with the predecessor contractors in the performance of similar work at the same Federal facility. (Reg. 29 CFR 4.173)
HOLIDAYS: A minimum of ten paid holidays per year: New Year's Day Martin Luther
King Jr.'s Birthday Washington's Birthday Memorial Day Independence Day
Labor Day Columbus Day Veterans' Day Thanksgiving Day and Christmas Day. (A contractor may substitute for any of the named holidays another day off with pay in accordance with a plan communicated to the employees involved.) (See 29 CFR 4.174)
THE OCCUPATIONS WHICH HAVE NUMBERED FOOTNOTES IN PARENTHESES RECEIVE THE
FOLLOWING:
1) COMPUTER EMPLOYEES: Under the SCA at section 8(b) this wage determination does not apply to any employee who individually qualifies as a bona fide executive administrative or professional employee as defined in 29 C.F.R. Part 541. Because most Computer System Analysts and Computer Programmers who are compensated at a rate not less than $27.63 (or on a salary or fee basis at a rate not less than $455 per week) an hour would likely qualify as exempt computer professionals (29 C.F.R. 541.
400) wage rates may not be listed on this wage determination for all occupations within those job families. In addition because this wage determination may not list a wage rate for some or all occupations within those job families if the survey data indicates that the prevailing wage rate for the occupation equals or exceeds
$27.63 per hour conformances may be necessary for certain nonexempt employees. For example if an individual employee is nonexempt but nevertheless performs duties within the scope of one of the Computer Systems Analyst or Computer Programmer occupations for which this wage determination does not specify an SCA wage rate then the wage rate for that employee must be conformed in accordance with the conformance procedures described in the conformance note included on this wage determination.
Additionally because job titles vary widely and change quickly in the computer industry job titles are not determinative of the application of the computer professional exemption. Therefore the exemption applies only to computer employees who satisfy the compensation requirements and whose primary duty consists of:
(1) The application of systems analysis techniques and procedures including consulting with users to determine hardware software or system functional specifications;
(2)…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .