This amendment modifies a solicitation for the rental of temporary water chillers. The Bureau of Reclamation, Northern California Area Office requires water chiller equipment of appropriate size and capacity to cool influent water at the Livingston Stone National Fish Hatchery from July 22, 2021 through December 7, 2021. This amendment revises certain key dates in the solicitation, removes CLIN 00030, adjusts the quantity in CLIN 00060 to 4.5, changes the period of performance dates and total for the initial rental period, sets the response date as July 1, 2021 at 2:00 PM Pacific Time, and requires offerors to include a signed copy of this amendment with their submission. All other terms and conditions remain unchanged.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_0003_-_Revised_PWS_0003.pdf | ||
| Sol_140R2021Q0080_Amd_0002.pdf | ||
| Sol_140R2021Q0080_Amd_0001.pdf | ||
| Amendment_0001_-_Revised_PWS_0001.pdf | ||
| Sol_140R2021Q0080.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140R2021Q0080 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
Sacramento CA 95825-1898 2800 Cottage Way, Room E-1815
R20
Division of Acquisition Services Regional Office Mid-Pacific Region Bureau of Reclamation
06/29/20210003
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
06/03/2021
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
A. TITLE: NCAO Temporary Water Chillers
B. PURPOSE: The purpose of this amendment is to provide revisions for certain key dates included in the solicitation document and to provide a revised PWS.
CLIN 00030 is removed in its entirety.
CLIN 00060 now reads 4.5 under the Qty column.
The row (in between CLIN 00060 and 00070) labeled Grand Total for initial four month month rental shall now read Grand Total for initial 4.5 month rental.
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
William Tanksley
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140R2021Q0080/0003
Page 1 Block 20: Period of Performance 7/22/2021 to 12/7/2021
1.04 TYPE OF CONTRACT
B. The initial Period of Performance
July 22, 2021 through December 7, 2021.
3.02 EQUIPMENT RENTAL SCHEDULE
A.1. Equipment must be able to commence operation by July 22, 2021.
QASP Reference 3.02 A.1 Equipment must be able to commence operation by July 22, 2021.
QASP Acceptable Quality Level Equipment will be operational by July 22, 2021.
ADDENDUM TO 52.212-1 INSTRUCTIONS TO OFFERORS
COMMERCIAL ITEMS
Factor 1 Technical Approach
d. Provide confirmation that your company¿s equipment can be onsite by 8:00 AM
Monday through Friday for up to two weeks in order to complete the installation by July 22, 2021.
FAR 52.212-2 EVALUATION COMMERCIAL ITEMS
(OCT 2014)
Factor 1 Technical Approach
d. The Contractor provide details as to the confirmation that your company¿s equipment can be onsite by 8:00 AM Monday through Friday for up to two weeks in order to complete the installation by July 22, 2021.
Factor 4 Price
For evaluation purposes, Price will be evaluated by totaling CLINs 10, 20, 40, 50, 60, and 70 (for a two-month period) along with Calculation of
Fuel Generation Consumption as outlined in
Section 3.01, C, 1.
C. RESPONSE DATE: The response date is now changed to 2:00 PM Pacific Time on Thursday, July
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
3 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140R2021Q0080/0003
1, 2021.
D. Contractors providing a quote will include a signed copy of this amendment with their submission.
E. All other terms and conditions remain unchanged.
END OF AMENDMENT
Period of Performance: 07/22/2021 to 12/07/2021