Amendment_0001_-_Revised_PWS_0001.pdf
PDF 195 KB Posted
- Attached to
- NCAO Temporary Water Chillers Federal contract opportunity
- Solicitation number
- 140R2021Q0080
About this file
This amended performance work statement and related federal contract opportunity describe requirements for a temporary water chiller rental to cool influent water at the Livingston Stone National Fish Hatchery in California from July 2021 through December 2021. The Bureau of Reclamation's Northern California Area Office requires a water chiller system capable of providing a minimum of 2,500 gallons per minute of cooled water at 10 degrees Fahrenheit below the influent temperature. Bidders must provide redundant chiller packages, generators, and cooling units with sufficient fuel storage for continuous 24-hour operation through the period of performance. Proposals are due by June 30, 2021 and the contractor must be prepared to install all equipment and begin operations by July 15, 2021. Pricing must be provided on a monthly basis for the rental period including costs for mobilization, equipment rental, installation, fuel delivery, maintenance, and demobilization.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_0003_-_Revised_PWS_0003.pdf | ||
| Sol_140R2021Q0080_Amd_0003.pdf | ||
| Sol_140R2021Q0080_Amd_0002.pdf | ||
| Sol_140R2021Q0080_Amd_0001.pdf | ||
| Sol_140R2021Q0080.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT 0001
REVISED PERFORMANCE WORK STATEMENT
CHILLER RENTAL FOR LIVINGSTON STONE FISH HATCHERY
MAY 2021 June 7, 2021
PART 1 GENERAL
1.01 BACKGROUND
A. The Bureau of Reclamation, Northern California Area Office (NCAO) located in Shasta Lake, CA, requires a water chiller system of appropriate size and capacity to cool influent water of the Livingston Stone National Fish Hatchery (LSNFH) during late summer and fall of 2021.
B. The hatchery is approximately 500 yards downstream of Shasta Dam, and is supplied water from the penstocks for Shasta Powerplant generating units two, three, and four. A March 2021 operational model indicates a low lake level elevation this season may produce penstock water temperatures this year above those considered safe for hatchery operations. Water temperatures exceeding 56 deg. F are detrimental to the winter run eggs under incubation and fish rearing at the hatchery.
A supplemental system to adequately cool the supply water must be in place before temperatures reach dangerous levels.
1.02 SCOPE
A. The Contractor shall supply a chiller capable of supplying cooled inlet water to the fish hatchery for a minimum of four months, according to the specifications below.
The Contractor will install the equipment, service the equipment at manufacturer’s recommended intervals, remove the equipment, and return the site to its original condition.
1.03 OBJECTIVE
A. The objective of this contract is to comply with the Bureau of Reclamation requirement to deliver water to the fish hatchery within parameters suitable for rearing fish at LSNFH.
1.04 TYPE OF CONTRACT
A. The government will award a firm fixed price rental and service contract for a period of four months with two optional months.
B. The initial Period of Performance will be July 15, 2021 through December 1, 2021.
1.05 ADMINISTRATIVE REQUIREMENTS
A. Administration of this contract shall be provided by the Contracting Officer and
Contracting Officer’s Representative (COR) who will be appointed at the time of award.
1. The Contractor shall communicate and coordinate work through the COR.
2. The Contractor shall perform equipment inspection and maintenance as defined by the manufacturer and according to sections below.
3. The Contractor shall provide their point of contact’s name, title, and telephone number for normal and after-hours contact for the duration of the rental contract period.
B. Contractor Qualifications
1. The Contractor shall provide documentation to demonstrate that it is qualified to install, inspect, and maintain equipment proposed for this project.
2. The Contractor shall provide only qualified and experienced maintenance personnel for the duration of this project.
C. Schedule and Working Hours
1. The Contractor will notify the COR no less than 2 working days in advance of the date a maintenance shutdown is required. The Contractor shall provide a field crew to perform the work in an efficient and effective manner to minimize periods of disruption to LSNFH operations.
2. The Contractor shall perform work during the hours of 8:00 AM to 4:00 PM
PST, Monday through Friday, unless an emergency is determined by the COR.
3. No scheduled maintenance work shall be performed on recognized federal holidays or declared national, state, or local emergencies.
D. Location of Work
1. The rented chillers will be located at the Livingston-Stone National Fish Hatchery. Access will be available through a security gate with access permission coordinated by the COR.
2. The Contractor’s pricing shall include all travel related costs as well as logistics and cost to deliver equipment to the required location.
E. Safety
1. The Contractor shall perform all work in accordance with the applicable Federal OSHA standards and Reclamation Safety and Health Standards (RSHS) Section 3, available at the following website: https://www.usbr.gov/safety/rshs/
2. The contractor shall submit a written contractor safety program that conforms to the format of RSHS Appendix B.
3. Prior to performing field work, contractor’s field personnel are required to attend 30 minutes of Hazardous Energy Control training provided by NCAO.
This training is valid for twelve months.
F. Security
1. The work is to be performed at a secure government facility.
2. Contractor employees working in the field shall provide current photo identification at the time of each scheduled field visit for security purposes.
NCAO will issue a contractor badge that is to be displayed on the outer clothing of each worker for the duration of the work performed on site.
3. Contractor employees shall work only in the areas in proximity of operation of the rented equipment, or as directed by the COR.
1.06 ITEMS SUPPLIED BY THE GOVERNMENT
A. Utilities
1. Power at 480V/3PH/600A currently serves the hatchery site and is available for equipment use. An increase in available power to supply rented chillers may be possible if the Contractor supplies a temporary 750 kVA transformer, circuit protection, and staff certified in high-voltage work to install/uninstall the temporary equipment. Pricing for the temporary power equipment and installation must be included in the submitted proposal.
2. If the Contractor proposes water-cooled chillers, cooling water is available from the hatchery intake pipe at a maximum flow rate of 1,000 gpm. Waste from the chillers must be chemical-free and piped to the hatchery effluent pipe. Pricing for the complete piping assembly must be included in the submitted proposal.
No additional cooling water supply sources are available.
3. Potable water is available.
4. Restroom facilities are available during scheduled service events.
PART 2 TECHNICAL REQUIREMENTS
2.01 DOCUMENTATION
A. Inspection Standards
1. Cooling equipment reliability is paramount to hatchery operations.
2. Contractor must inspect and maintain the rented equipment according to manufacturer’s requirements.
3. The inspection and maintenance schedule, and manufacturer’s maintenance specifications, must be submitted to the COR at least 14 days prior to delivery of the equipment.
2.02 WORK TO BE PERFORMED
A. Contractor shall provide all labor, tools, special tools, lifts, safety equipment and consumable materials including fuel, cleaning products, spray lubricants, and grease as required to complete the installation and maintenance work. Up to 3,000 gallons of stored fuel may be located at site indicated by the Government.
B. A log of maintenance work performed, in the Contractor’s format, shall be delivered to the COR monthly. The form must include the date, items addressed, and signature of staff conducting maintenance.
2.03 MATERIAL LIMITATIONS
A. The water that is used within LSNFH cannot contact the following prohibited metals - copper, zinc or brass due to the possibility of ion exchange causing harm to eggs, fry and juvenile fish.
Acceptable materials include PVC, rubber, stainless steel, titanium, and carbon steel that does not contain any of the prohibited metals listed previously. Bronze or steel pump impellers are allowed as long as they don’t have the prohibited metals exposed to the hatchery water.
B. For water chillers that contain the prohibited metals in associated recirculation pumping systems, such as cooling towers, no additional chemicals that are toxic to fish of any stage, such as descalants or biocides, may be used or wasted on hatchery property.
2.04 EQUIPMENT POSITION AND OPERATION
A. The chiller system will consist of redundant chiller packages, to ensure no loss of continuous service for any package component. Total chilling capacity requirements are described in Section 2.05. The location identified at the hatchery where chillers will be required will be near enough to the main water supply pipeline valve assembly to minimize piping. The valve assembly is equipped with butterfly valves upstream and downstream of an in-line valve that controls total flow to the hatchery. The Contractor must connect chillers to 10-inch flange inlet and outlet pipes, and install all piping, valves, hoses, and fittings as needed.
B. Each chiller package must be provided with its own power generator and associated controls to properly run the chiller package. If a chiller package fails to operate, the other chiller package must be able to produce at least half the required total flow rate of chilled water. Any chillers that are expected to run on available electrical power will be equipped with a backup diesel generator and automatic transfer switch. Manual switching between chiller packages is acceptable during maintenance until both chillers are returned to service.
C. Operation will be by parallel flow though the chillers, and flow to the hatchery will be manipulated by automated temperature monitoring. When only one chiller is required to supply the required flow demand, the other chiller will remain in standby, but must allow either full water flow through the chiller or a bypass to ensure the flow of total water to the hatchery is at the required rate. When chilled water flow demand exceeds the production limit of one chiller, the other package must be able to augment chilled water flow until the required total chilled water flow rate is achieved. It is permissible to require manual starting of the second chiller, but once started, the chiller must maintain automatic control of effluent temperature.
D. Package system must be able to monitor and alarm if either chiller package fails in any way to meet the full demand. Alarms of insufficient pressure, flow, and temperature must be included in each chiller package. Visible lights or other alarm notifications are at the discretion of the manufacturer. All chiller packages supplied shall be required to provide the required chilled water continuously throughout the rental period, except for regular scheduled maintenance service.
E. Waste from water-cooled chillers must meet the criteria of the LSNFH pollutant waste discharge permit after blending with the hatchery effluent water. These criteria include no more than 5-degree F increase in the combined waste discharge.
F. The chiller contractor shall supply and install all electrical cables, conduits, connections, breakers, disconnects, relays, controls and other items as needed for each chiller package supplied to comply with all applicable Electrical Codes, Environmental & Air Quality regulations, and Safety regulations and performance requirements as described herein. Each generator shall have a current Air Quality Permit for Shasta County and have current compliance documentation provided by the rental contractor.
2.05 EQUIPMENT CAPACITY
1. The total chilled water flowrate minimum is 2,500 gpm (~5.6 cfs).
2. Multiple chiller packages must run in parallel configuration.
3. Complete redundant power alternatives must be included in the system.
4. Minimum temperature reduction at full flow rate from equipment influent to the hatchery is 10F.
5. Fuel storage must be sufficient for 24-hour operation for the duration of the contract.
PART 3 RENTAL REQUIREMENTS
3.01 EQUIPMENT RENTAL BID REQUIREMENTS
A. These services are being provided to a Federal facility, so State and Federal Sales Taxes do not apply. The chiller package rental rates and optional fuel service charges shall be provided on a monthly basis for the rental period. Weekly rental rates must be provided for the two-month option period.
B. The contractor shall provide the following line item costs under the conditions below:
1. Mobilization (Equipment delivery and installation placement).
2. Rental of chiller packages (Chillers, Generators, and Cooling Units) that provide for full required flow capacity.
3. Costs for installation of all water and electrical connection items as described.
4. Fuel supply and tank filling costs based on fuel consumption to ensure continuous operation during full flow conditions. Fuel will be paid by the Government. Fuel delivery costs based on 100% fuel consumption to ensure continuous operation during full flow conditions. This line item is for fuel delivery only; fuel costs will be paid by the Government on a verifiable cost +15% basis.
5. Generator maintenance service costs – routine oil & filter changes as required.
6. Teardown and demobilization at end of rental period.
C. Additional information at time of bid submission will include the following:
1. Estimated generator fuel consumption - gal./hr. and fuel tank size (for each generator) Estimated generator fuel consumption at 100% capacity (gal./hr.) for 30 days, 24 hrs/day.
2. Manufacturer specifications for all equipment to be used.
3. Schedule for delivery and teardown that falls within two weeks before and after the described rental schedule.
3.02 EQUIPMENT RENTAL SCHEDULE
A. Because hatchery water supply conditions are uncertain at this time, the government reserves the right to exercise none, any, or all of the chiller packages described herein. Listed costs shall not be subject to increases during the calendar year (2021). The contractor shall provide on-site training to hatchery personnel on the operation of all rental equipment.
1. Equipment must be able to commence operation by July 15, 2021.
2. Maximum delivery/installation and teardown/removal period is 14 calendar days prior to and after the rental period.
3. Rental period is expected to end on December 1, 2021, but these estimates are subject to change as drought conditions develop through the year.
4. Response time for emergency repairs should be no longer than 12 hours.
END OF REVISED PERFORMANCE WORK STATEMENT