Amendment No. 0001 for 140R2020B0005_0001.pdf
PDF 9 MB Posted
- Attached to
- DMC Intertie Pump Units 3 and 4 Installation Federal contract opportunity
- Solicitation number
- 140R2020B0005
About this file
This document is an amendment to the specifications for Solicitation Number 140R2020B0005 to install Pumping Units 3 and 4 at the Delta-Mendota Canal Intertie Pumping Plant. The specifications cover requirements for concrete formwork, reinforcement and casting, structural steel fabrication, coatings, electrical materials and installation, vibration monitoring, installation of government-furnished pumping units, diffuser panels, steel manifolds, valves and equipment. Bidders must meet submission deadlines and the contract is to be awarded by the Department of the Interior Bureau of Reclamation to install the pumping units at the specified location by the dates outlined.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment No. 0002 for Solicitation No 140R2020B0005_0002.pdf | ||
| Sol_140R2020B0005_Amd_0001.pdf | ||
| Solicitation 140R2020B0005.pdf | ||
| Sol_140R2020B0005.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pumping Units 3 and 4 Installation Delta-Mendota Canal – California Aqueduct Intertie Pumping Plant Amendment 001 Delta Division, Central Valley Project, CA Specification No. 20-C0904
Table of Contents
00 01 10 - 1
SECTION C - DESCRIPTION / SPECIFICATIONS
TABLE OF CONTENTS
DIVISION 1 - GENERAL REQUIREMENTS
01 11 00 Summary of Work 01 14 10 Use of Site 01 14 30 Interruption of Service 01 31 22 Coordination Meetings 01 31 30 Contract Document Management System 01 32 10 Construction Program 01 33 00 Submittals 01 33 26 Electrical Drawings and Data 01 35 10 Safety Data Sheets 01 35 20 Safety and Health 01 35 30 Contractor’s Onsite Safety Personnel 01 35 50 Site Security 01 42 10 Reference Standards 01 51 00 Temporary Utilities 01 55 00 Vehicular Access and Parking 01 55 20 Traffic Control 01 56 10 Protection of Existing Installations 01 56 15 Protection of Existing Utilities 01 56 20 Existing Fences 01 57 20 Environmental Controls 01 57 30 Water Pollution Control 01 57 35 Oil Spill Prevention 01 60 00 Product Requirements 01 64 40 Government-Furnished Products 01 74 10 Cleaning and Waste Management 01 78 30 Project Record DrawingsDocuments
DIVISION 3 - CONCRETE
03 11 10 Concrete Formwork 03 20 00 Concrete Reinforcement 03 20 60 Concrete Anchor Bolts 03 30 00 Cast-in-Place Concrete 03 62 20 Nonshrink Grout for Equipment and Metalwork 03 81 10 Concrete Removal
DIVISION 5 - METALS
05 50 00 Metal Fabrications
Pumping Units 3 and 4 Installation Delta-Mendota Canal – California Aqueduct Intertie Pumping Plant Amendment 001 Delta Division, Central Valley Project, CA Specification No. 20-C0904
Table of Contents
00 01 10 - 2
DIVISION 9 - FINISHES
09 96 20 Coatings
DIVISION 26 - ELECTRICAL
26 05 02 Basic Electrical Materials and Methods 26 05 10 Conductors and Cables 26 05 13 5-Kilovolt Cable 26 05 20 Grounding and Bonding 26 05 33 Electrical Conduit 26 05 60 Identification, Warning, and Safety Signs 26 05 90 Wiring Checkout and Tests 26 13 70 Medium Voltage Power Factor Correction Capacitors 26 18 44 5-kV Motor Control Equipment Spare Parts 26 27 30 Wiring Devices
DIVISION 33 - UTILITIES
33 09 16 Vibration Monitor 33 12 78 Installation of Government-Furnished Vertical Pumping Units
DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION
35 21 55 Diffuser Panels 35 21 94 Steel Manifolds 35 22 14 Valves and Equipment 35 22 15 Installation of Government-Furnished Valves
DIVISION 51 - INFORMATION AVAILABLE TO OFFERORS
51 00 00 Information Available to Offerors 51 00 50 Electronic Media Release
DIVISION 52 - DRAWINGS
52 00 00 Drawings
END OF CONTENTS
Specification 20-C0904
File details come from the government source that posted it. Updated .