- Black Canyon Powerplant Cable Separation Federal contract opportunity
- Solicitation number
- 140R1023B0004
About this file
This document is an amendment to a federal solicitation for the Black Canyon Powerplant Cable Separation project. The amendment revises specifications in Section 26 05 13 by changing the required cable insulation thickness from 175 mils to 220 mils and removing the requirement for a coated cable shield. It also updates the signature sheet. The related federal contract opportunity provides additional details, with Solicitation Number 140R1023B0004 for cable separation work at the Black Canyon Powerplant issued by the Department of the Interior Bureau of Reclamation. The amendment is signed by the contracting officer and technical representatives, with an effective date of July 13, 2023.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140R1023B0004_Amd_0002.pdf | ||
| 140R1023B0004_amendment_00001_0001.pdf | ||
| Sol_140R1023B0004_Amd_0001.pdf | ||
| Sol_140R1023B0004.pdf | ||
| 140R1023B0004_Solicitation_Cable_Separation_conformed.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140R1023B0004 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
Boise ID 83706-1234 1150 N. Curtis Road, Ste. 100
R10
Acquisition Management Division Regional Office Pacific Northwest Region Bureau of Reclamation
07/13/20230002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
07/13/2023
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Black Canyon Powerplant Cable Separation
The purpose of amendment 0002 is to revise the specifications and update the signature sheet. See attached.
Summary of changes:
1. Section 26 05 13, 2.01, B, 5: Change text "175 mil" to "220 mil"
2. Section 26 05 13, 2.01, F: Deleted "coated,"
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Scott Cooper
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
TECHNICAL SERVICE CENTER
WRITTEN SPECIFICATIONS SIGNATURE SHEET
Specifications Title: Black Canyon Cable Separation
Project Title: Black Canyon Cable Separation
Region: Interior Region 9: Columbia-Pacific Northwest
Prepared:
Digitally signed by NICOLE SMITH Date: 2023.03.20 12:31:19 -06'00'
Technical Approval: P.E.
Certified:
AMD/MOD No. Technical Approval Signature:
Prepared By Signature: Revised Sections:
Amd No. P0002 26 05 13
DENISE FUZERE FUZERE
Date: 2023.03.20 11:34:53 -06'00' P.E.
NANCY ARTHUR ARTHUR
P.E.
NICOLE SMITH
STACEY CARLSON Digitally signed by STACEY CARLSON Date: 2023.08.14 11:54:40 -06'00'
Black Canyon Powerplant Cable Separation Boise Project - Idaho Amd No.P0002
(Revised)
26 05 13 - 4
B. Seal ends of cable on reels from moisture with suitable heat-shrinkable caps and mastic compounds.
C. Do not drag cable across ground, fences, or other sharp projections during shipping or placement of cable reels at jobsite.
D. Remove unused quantities of cable.
PART 2 PRODUCTS
2.01 POWER CABLE
A. Conform to NEMA WC 74 and AEIC CS8 and CS9, where applicable.
B. Ratings:
1. Rated Voltage: 15 kilovolts.
2. Operating Voltage: 6.6 kilovolts.
3. Frequency: 60 hertz.
4. Operating Temperature: 105 degrees C, maximum
5. Average Insulation Thickness: 220 mils 133 percent insulation.
C. Conductor:
1. Material: Class B, stranded, copper conductors; or compact-round, stranded copper conductors.
2. Size: 4/0.
3. Number of Conductors in Cable: One.
D. Insulation:
1. Solid-dielectric.
2. EPR (ethylene-propylene rubber), rubber-insulated.
E. Screens: Extruded, semi-conducting EPR conductor strand screen and extruded thermosetting semi-conducting EPR insulation screen.
F. Shield: 5 mil copper tape, deleted, helically applied.
G. Sheath: UL listed close-fitting, impervious, continuous corrugated aluminum.
H. Jacket:
1. Overall PVC compound jacket.
2. Flame-retardant.