Sol_140P8625Q0002_Amd_0001.pdf
PDF 89 KB Posted
- Attached to
- REPLACE WATER LINE IN AQUATIC PARK Federal contract opportunity
- Solicitation number
- 140P8625Q0002
About this file
This is Amendment 001 to solicitation 140P8625Q0002 issued by the National Park Service Pacific West Region for replacing a water line in Aquatic Park, with an effective date of December 9, 2024.
The amendment attaches a Site Visit Sign-in Sheet and provides answers to four vendor questions. Key clarifications include: the existing 4" water line must be videoed, cleaned, and documented with pre/post-cleaning videos and logs; the contractor must make all plumbing connections according to the SOW regardless of location, with the current mapped location being assumed (line was operational until August 2024); no contaminated soil disposal is required for pot holing operations as material can be reused as fill; and no cut sheet is available for the existing shower connection. The amendment maintains all other original terms and conditions.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Section_J_-_Att_No__009_Site_Visit_Sign-in_Sheet_0001.pdf | ||
| Sol_140P8625Q0002.pdf | ||
| Section_J_-_Att_No__006_Payment_Bond_SF25A-23a.pdf | ||
| Section_J_-_Att_No__004_Technical_Information.pdf | ||
| Section_J_-_Att_No__001_Division_One_Specifications.pdf | ||
| Section_J_-_Att_No__003_WD_CA20240018_Mod_22.pdf | ||
| Section_J_-_Att_No__005_Transmittal_form_CM16.pdf | ||
| Section_J_-_Att_No__008_Invoice_Payment_Request.pdf | ||
| Section_J_-_Att_No__007_DI_137_Release_of_Claims_.pdf | ||
| Section_J_-_Att_No__002_Reference_Sheet.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140P8625Q0002 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
PPG
San Francisco CA 94123 Building 201, Fort Mason
NPS, PWR - GOGA MABO
12/09/20240001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
11/25/2024
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this Amendment 001 is to attach the Site Visit Sign-in Sheet (see Section J
- Att No. 009). This Amendment also answers vendor questions (see below).
Question 1. The sow states for us to video and clean the existing 4" water line, if it's being used just as a chase does it need to be cleaned still?
Answer Question 1. Yes, we want it videoed, cleaned, and pre-cleaning and post-cleaning video and suitable log, and/or in digital form.
Question 2. In the event the existing 4" line does not cross the road at the intended intersection how will this be handled?
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Patty Payne
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 2
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140P8625Q0002/0001
Answer Question 2. The contractor will make all plumbing connections according to the SOW, regardless of location. The current location indicated on the map is assumed, as noted. Up until August 2024, the line was operational.
Question 3. Do we need to worry about contaminated soil disposal for any of the pot holing operations?
Answer Question 3. No soil disposal is anticipated. This material can be reused as fill.
Question 4. Does the NPS have the cut sheet for the existing shower we are to be tying into?
Answer Question 4. No cut sheet is available.
All other terms and conditions remain unchanged.
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
File details come from the government source that posted it. Updated .