Att_1_SOW_Rev_4_10.pdf

PDF 2 MB Posted

Attached to
FRP Truss Deck Trail Bridge Federal contract opportunity
Solicitation number
140P8418Q0029
Issued by
Department of the Interior National Park Service

About this file

SOW Rev 1

View the file

Other files for this federal contract opportunity

Other files attached to FRP Truss Deck Trail Bridge, newest first.
File Type Posted
Att_1_SOW.pdf PDF
Att_2_Exp_&_Past_Perf.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFQ No. 140P8418Q0029 FRP Bridge for Redwood National & State Parks

Att 1 ‐ STATEMENT OF WORK Revised April 10, 2018

I. Background:

TheBondCreekBridgesiteislocatedinOrick,HumboldtCo,CA,RedwoodNationalPark.
TheoldBondCreekbridgehasbeendemolishedandremovedfromthesite.Itconsistedof
two(2)independent,simplysupportedspansofunequallength,supportedonthree(3)
concreteabutments.SpanNo.1is4feetwideby63footlong.SpanNo.2is4footwideby
20foot‐3inchlong.Theoriginaldecksurfacewasallthesamefinishedgrade,theunder
deckstructuresforeachspanweredifferentdepths,andthereforetheabutmentsare
differentheights.SpanNo.1wastwo6inchwideX2footdeepGlu‐lamstringers.SpanNo.
2wasthree4inchwideX12inchdeeppressuretreatedlumberstringers.Seetheattached
sketchesfortheexistingdimensionsoftheabutments.Theintentionofthisbridgeistobe
usedforpedestriancrossingandoccasionaluseforheavymotorizedtrailmaintenance
equipmentaccess.Thebridgemustwithstandamaximumvehicledeadloadof10,000.
II. Descriptionofwork:
Thisacquisitionshallpurchaseandshiptworeplacementbridgesubstructurespre‐
engineeredandpre‐fabricatedtospantheexistingabutments.Allstructuralsystemsshall
bebelowthedeckingandsupportedontheabutments.Deckingshallbethesamelevel,
withnogapgreaterthan½‐inch,wherethetwospansadjoin.Structuralcomponentsshall
bemadeofpultrudedfiberreinforcedplastic(FRP)components.Allfastenersand
hardwareshallbeHotDippedGalvanizedand/orStainlessSteel.Provide12inchwide
non‐slip,heavydutyFRPmaterialsfordeckingofsufficientthicknesstomeetload
requirements,pre‐drilledfortheuseofself‐tappingscrewsinsufficientnumberand
placementforsecureattachment.Theseplankswillhave½”gapsin‐betweenwhen
securedtothesub‐structurestoprovideforwaterrun‐offandtoreducedebris
accumulation.Thedesignandfabricationshallbeinasimplemannersuchthatitwillallow
disassemblyforshipping,andallowfortheparktomanuallymanipulateandtransport
bridgecomponentstothetrailbridgesiteforre‐assemblybymanuallaborcrews,highline
riggingandhandtools.Nocomponentshallbelongerthan21feet,forbothSpanNo.1and
SpanNo.2,soastoaccommodaterestrictiveterrainandallowmovingcomponentsby
manuallaborcrews.Engineeringdesignshalldeterminethemeansandmethodsfor
connectiontotheexistingconcreteabutments.
ThisworkdoesNOTincludepostsandrailsandassociatedhardware.However,thedesign
shouldincludeloadingcalculationstosupportthehandrailconnectionsandattachments
onthestructure(200lbs.at50inchestall).Thegovernmentshallfurnishmaterialsand
installthehandrailsandposts. TheNPSwillfurnishandinstallcontainmentstructures
forgravelandsoilaccessrampsuptofinisheddecksurface.
Itispreferablethatthedesignofmountingclips/connectingcomponentstoattach
structurestoexistingconcretefootings,utilizeexistinganchorboltandthroughbolthole
locations.(Seediagramsofdimensionsofexistingconcretefootingswithfastening
locationsanddimensionsonthefootingsdesignedfortheoriginalbridgestructures.)

RFQ No. 140P8418Q0029 FRP Bridge for Redwood National & State Parks

A. EngineeringRequirements
Eachbridgestructureshallbedesignedandstampedbyaprofessionalstructural
engineerregisteredintheStateofCalifornia.Includeallapplicablecodesand
designcriteria(suchas,notlimitedtoliveload,deadload,windloads,seismicloads,

etc.)

B. DesignCriteria
1. Designeachspanseparately.Theshortspan(SpanNo.2)shallutilizea
simplysupportedFRPbeamsystem(minimumof3beams)sufficienttocarryloads,
supportFRPdeckingsystem,andtoallowfortheattachmentofaparkinstalled
removablehandrailsystems.Thelongspan(SpanNo.1)shallutilizeFRP
componentsinanunder‐deckstructurecomprisedofopenwebor“spaceframe”
structuralassemblyorsimilar,toallowforcompletebreakdownandreassemblyat
thebridgesite.Thisshallbedesignedtoamaximumheightof4footabove
bearinglocationsonfootings.

The bridge must withstand a maximum vehicle dead load of 10,000 lbs.

Minimum design for vehicle load – 10,000 lbs.

Minimum design for pedestrian Live load – 85 PSF.

Deck width shall be 4 feet clear from edge to edge, inside hand railing assembly.

III. Submittals:

A. ShopDrawings:
Provideshopdrawingsforreviewandacceptance.Providedesigncriteria,
componentdimensions,layout,assemblyinstructionsandPEstamp.
B. SpareParts:
Provide(2)setsofsparepartsforeachtypeoffastenerorhardwareand2spare
deckboards.

C. Warranty:

Provide manufacturer warranty for materials.

IV. QualityControl:
Manufacturershallfabricateandassemblethebridgestructurestoverifyassembly,
componentsize/typeandfitareaccurate.

Disassembly, itemize and label components, develop and include assembly instructions for delivery.

V. ShippingandDelivery:
Disassembleandshipallmaterials,fasteners,etc.toRedwoodNationalPark.,North
OperationsCenter,500AubellLane,CrescentCity,CA95531.

Footing B

Footing C

Footing A

Bond Creek

Photos of existing Bond Creek Bridge Footings.

Footing A

Footing C

Bond Creek

Footing A

Angle iron for mounting failed glulam - to be removed

Angle iron for mounting failed glulam - to be removed

Footing C Through Bolt Holes

Anchor Bolt - Cleaned

Anchor Bolt o f