140P8322Q0052_Attachment_2_Bridge_Material_and_Fabrication_Specifications.pdf

PDF 145 KB Posted

Attached to
Supply and Deliver Bridges, OLYM Federal contract opportunity
Solicitation number
140P8322Q0052
Issued by
Department of the Interior National Park Service Pacific West Region

View the file

Other files for this federal contract opportunity

Other files attached to Supply and Deliver Bridges, OLYM, newest first.
File Type Posted
140P8322Q0052_Attachment_3_Bridge_Plans.pdf PDF
Sol_140P8322Q0052.pdf PDF
140P8322Q0052_Attachment_1_Combined_Synopsis-Solicitation_Full_Text.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation (Request for Quotes-RFQ) no. 140P8322Q0052 Attachment 2 - Bridge Material and Fabrication Specifications

Material Specifications:

All steel structural elements to be ASTM A588 grade 50ksi weathering steel according to the attached plans. Bearing plate to be stainless steel.

Fabrication Specifications:

Fabrication of steel elements to comply with AWS D1.5. Bearing plates to be welded to bottom of sole plate. Holes for nailer boards, anchor bolts and stiffeners to be drilled by vendor. All fabrication is to be according to attached plans.

Fastener Specifications:

Fasteners for connection of steel structural elements will be provided by contractor and will be 5/8” A325 type 3 or Type 3 AASHTO M164 bolts according to the attached plans.

Delivery Information:

1) One 60’ bridge package containing all steel structural assemblies fabricated according to the attached plans and delivered to:

Quinault North Shore Ranger Station (47.505107599387905, - 123.82126571746625) 913 N. Shore Rd.

Amanda Park WA, 98526

2) One 60’ bridge package containing all steel structural assemblies fabricated according to the attached plans and delivered to:

Finley Ck. Gravel pit (47.5116763968514, -123.80972286876336)

8.4 miles up the North shore road from Amanda Park.

Delivery shall be made to two locations within Olympic National Park (ONP). ONP will provide equipment for unloading the fabricated beams from the truck. Point of contact for delivery will be made available after award. Delivery shall be scheduled in advance with ONP point of contact. Deliveries on Mondays or Fridays are not preferred.

Inspection and Acceptance:

Vendor will be responsible for following provided blueprints and specifications to ensure correct design and fit. NPS crew will perform a dry fitting inspection after delivery, prior to payment. Any fabrication defects found during dry fitting, and/or during assembly will be the responsibility of the vendor to correct in accordance with FAR Clause 52.212- 4, (d) Inspection/Acceptance. This clause is incorporated by reference in the solicitation and is available by full text at https://www.acquisition.gov/far/part-52#FAR_52_212_4.