This document is a technical specification for the procurement of 12 K-Rail concrete barriers for the Lake Mead National Recreation Area. The barriers must meet Caltrans specifications, be 20 feet long, 24 inches wide, 32 inches high, and weigh approximately 8,000 pounds each. They must be painted white and include connection pins and gawk screen holes. All materials must be new and contractor-furnished from outside the Park. The barriers must be delivered to the Lake Mead National Recreation Area in Boulder City, Nevada no later than 90 days after receipt of order. The contractor is responsible for offloading the barriers, and the delivery and offloading costs must be included in the unit price. This specification is related to a federal contract opportunity with Solicitation Number 140P8124Q0077 issued by the Department of the Interior National Park Service Pacific West Region.

View the file

Other files for this federal contract opportunity

Other files attached to LAKE MEAD - K RAIL BARRIERS, newest first.
File Type Posted
Sol_140P8124Q0077_Amd_0001.pdf PDF
Sol_140P8124Q0077.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. Description

1.1. Qty of 12 - K-Rail Concrete barriers

1.1.1. Dimension - 20’ L x 24” W x 32” H; ~8,000 lbs

1.1.2. Must meet Caltrans specification

1.1.3. Painted White

1.1.4. Include connection pins, gawk screen holes

1.2. All Material shall be new and contractor-furnished from outside the Park.

2. Delivery

2.1. Deliver the K-Rail Concrete barriers to the following address:

Lake Mead National Recreation Area

101 Katzenbach Dr

Boulder City, NV 89005

2.2. Deliver NLT 90 days after receipt of order.

2.3. Contractor is responsible for off-loading barriers.

2.4. Delivery and off-loading cost must be included in the unit cost for the K-Rail Concrete barriers