Sol_140P8123Q0094_Amd_0001.pdf
PDF 410 KB Posted
- Attached to
- IRRIGATTION SYSTEM AT OASIS MARA Federal contract opportunity
- Solicitation number
- 140P8123Q0094
About this file
This amendment to solicitation 140P8123Q0094 provides revised evaluation criteria and contractor questions and answers for an irrigation system project at Oasis Mara in the Pacific West Region of the National Park Service. The purpose is to remove the requirement for offerors to be licensed California contractors, answer submitted questions, and post the site visit attendance sheet. Price will be the primary factor in awarding a contract for installation of an irrigation system, with technical acceptability and prior experience also being considered. Quotes are due by August 30, 2023 at 2:00 PM PDT.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P8123Q0094.pdf | ||
| B08_-_Atch_3_-_Wage_Determination_CA20230026.pdf | ||
| B08_-_Atch_1_-_Oasis_irrigation_SOW.pdf | ||
| B08_-_Atch_4_-_Construction_Contraction_Administration.docx | DOCX document | |
| B08_-_Atch_2_-_Price_Schedule.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140P8123Q0094 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
PPL
Boulder City NV 89005-2426 601 Nevada Way
NPS, PWR - LAKE MABO
08/25/20230001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
07/25/2023
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
See Continuation Page
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Caroline Bachelier
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
140P8123Q0094 Amendment 0001
The purpose of this amendment is to answer contractor questions, revise evaluation criteria, and post the visit site sign in sheet.
A. Contractor questions and answers are provided as follows:
Question 1: Is the project only going to allow California Contractors to participate (Section M-2B)
Answer 1: NPS reviewed requested and removed requirement to be a licensed California contractor.
B. Below is the revised Section M. Requirement for Licensed California contractor has been removed.
M.1 – Evaluation Factors for Award
Evaluation will be made in accordance with the simplified acquisition procedures outlined in FAR
Part 13.106. The Government anticipates issuing an order resulting from this request for quotation to the responsible quoter whose quotation provides the lowest price offer that meets the technical specifications and prior experience:
1. Price: Price evaluation will be based on the quote’s Total Evaluated Price. Total evaluated price is the total pricing of the quote for the basic requirement.
2. Technical Requirements: Quoter must meet the criteria below
a) The quoter must be a Licensed California Contractor.
b) The quoter must show a minimum of 3 years (from the issuance of solicitation) of prior experience installing irrigation systems.
3. Evaluation process: The quotes received will be ordered from lowest to highest by total evaluated price.
The quote with the lowest total evaluated price will be reviewed for technical acceptability, conformance to the RFQ, and responsibility. If the quote is found to be technically acceptable, the quote conforms to the
RFQ, and the quoter is found to be responsible, then the award will be made to that quoter. If the quote is found to be not technically acceptable, the quote does not conform to the RFQ, or the quoter is found to be not responsible, then the quote with the next lowest total evaluated price will be evaluated. This process will be continued until a quote is found to be technically acceptable and award can be made to a responsible quoter that conforms to the RFQ requirements.
C. Attached is the site visit attendance.
D. The quote due date remains the same, Aug 30, 2023, at 2pm PDT.
File details come from the government source that posted it. Updated .