This document is a justification for a sole source contract award over $150,000 for emergency jetting and repair services for the sewage system at Death Valley National Park. The National Park Service requires these urgent services to address failures and blockages to the sewage system piping and lift stations caused by heavy rainfall and flooding. Two contractors, Roundhouse PBN and Copper Mountain Services, are able to perform the work immediately and were identified through market research as the only local firms with response capabilities. The estimated cost of the work is $240,000 and will be awarded on a firm-fixed price basis to either Roundhouse PBN or Copper Mountain Services determined to offer fair and reasonable pricing according to FAR price analysis. The contracting officer and maintenance chief for Death Valley National Park have approved the justification based on the urgent need to conduct repairs before the next rainy season in July to prevent potential sewage overflows and environmental damage.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Last updated 6/2/2016
ATTACHMENT 2
JUSTIFICATION & APPROVAL FOR OTHER THAN FULL AND OPEN COMPETITION
for SIMPLIFIED ACQUISITIONS OVER THE MICROPURCHASE THRESHOLD (See FAR
Part 2) UP TO SAT (See FAR 13.106-1)
Date: 06/14/2023 PR Number: 40605283
1. Nature and/or description of the item/service being procured and its intended use (include the anticipated cost):
Emergency jetting of the DEVA sewer system and emergency repairs to components of the sewer system.
Anticipated cost is $240K
2. Sole Source Justification rationale (Check one and explain below):
______ Only one responsible source.
___X___ Urgent and compelling circumstances exist. Include critical delivery or performance dates, and when you became aware of the requirement. Provide a specific statement of the impact on Government operations, financial or otherwise, if the required delivery or performance dates are not met.
______ Other _____________________________________________________
Explain: The DEVA sewer system has had numerous emergency blockages combined with debris intrusion and excessive root growth, all of which are attributed to monsoonal storm events. The result has been overland sewage flows from blockages, pumping and trucking sewage to prevent further spills, and inability to operate sewage systems when under emergency conditions.
Periods of heavy rainfall caused by multiple atmospheric rivers in California between December 31, 2022 and March 25, 2023 resulted in floods that affected parts of Southern California, the California Central Coast, Northern California, and Nevada. The flooding resulted in property damage and at least 22 fatalities. Death Valley National Park received a substantial amount of flash flooding from multiple atmospheric river events through this period. These events caused sediment erosion to occur that inundated our sanitary sewer collection system with sand and rock debris.
On January 14, 2023, President Biden declared that a major disaster existed in the State of California and ordered Federal aid to supplement State, tribal, and local recovery efforts in the areas affected by severe winter storms, flooding, landslides, and mudslides beginning on December 27, 2022, and continuing.
Without urgent action, the park is at eminent risk of having an overland sewage flow, which would pose a hazard to human health and damage to park natural resources. The risk is heightened as time passes for several reasons:
- During blockages, Cow Creek sewage is currently flowing into an abandoned-in-place septic tank, which is serving as a collection basin to hold the sewage between pumping operations. The condition of the abandoned septic tank has never been assessed. Discharge from the abandoned septic tank is not permitted.
- The potential for equipment failure exists, and there is absolutely no redundancy in control of the sewage. The park has no way to connect emergency generators to the lift stations.
- The sewage system is also critical for the production of potable water for all of the water systems in the park due to the fact that the park water plants are reverse-osmosis type system. The water plants produce approximately 2 gallons of sewage for every gallon of treated water that is produced.
- Repeated sediment blockages from storm events have caused either sewer outages or overland sewage flows resulting in regulator violations.
- Recent video inspection of sewage pipes (within the past 3 days) has shown a large amount of sediment in the sewer pipes.
- Recent A/E investigation has discovered that the Coyote Loop lift station and force main are unable to be further investigated due to installed configuration.
- Recent power outage responses have identified that both Coyote Loop Lift Station and Cow Creek Lift Station cannot be safely connected to emergency power because of transfer switch failures.
Given the nature of the needed work with the community sewer collection system, the park could very likely suffer catastrophic consequences if this service is not urgently completed before the next season of storms. It is anticipated that the next season of storms will come in July which is only a few weeks away, but rainstorms at Death Valley are unpredictable and can happen at any time, therefore it is imperative to procure this service urgently. Urgent and compelling requirements are exempt from issuance of a synopsis which will save the government valuable time and allows the CO to reasonably limit their sources in order to act immediately. This procurement flexibility mitigates the likely chance of failure to DEVA’s sewage system when the next storm comes.
3. Market Research. Please explain the results or why one was not performed. State whether any other offers were received, or anyone expressed interest:
Brief market research was performed by performing searches on the SBA Dynamic Small Business Search engine, reviewing past contracts for emergency services to park utility systems, and identifying contractors who regularly work both in the park and in other communities of the California and Nevada.
One firm, Roundhouse PBN expressed interest in providing the necessary services. A second firm may also be interested, Copper Mountain Services and the market research conclusion recommended a firm-fixed price contract with either Roundhouse PBN or Copper Mountain Services. Roundhouse is currently working in the park, and both have capacity to complete the work of the SOW. No other firms were identified who are local and have immediate response capability.
ATTACHMENT 2
JUSTIFICATION AND APPROVAL FOR OTHER THAN FULL AND OPEN COMPETITION
for SIMPLIFIED ACQUISITIONS OVER $3,000 ($2,000/$2500 for Construction/Services AND UP
TO $150,000
(See FAR 13.106-1)
PR Number 40605283
4. If this is a determination for sole source, the contracting officer certifies:
a. Two sources are available and an urgent and compelling circumstance exists.
b. The anticipated price will be determined fair and reasonable using the price analysis techniques described in FAR Part 13.106-3(a).
(Signature) _______________________________________ (Date)__________________________
Type or Print Name: Charles Thompson Title: Chief of Maintenance, Death Valley National Park
(Signature) _______________________________________ (Date) ___________________________
Type or Print Name: Michelle Bennett Title: Contracting Officer
Over $50,000:(if applicable)
(Signature) ______ _________________________________ (Date) __________________
Warranted Individual 1 Level Above Contracting Officer: Maria Stubitz Title: Supervisory Contract Specialist
MICHELLE
BENNETT
Digitally signed by MICHELLE
BENNETT
Date: 2023.06.16 09:36:45 -07'00'
CHARLES THOMPSON
Digitally signed by CHARLES THOMPSON DN: c=US, o=U.S. Government, ou=Department of the Interior, ou=National Park Service, cn=CHARLES THOMPSON, 0.9.2342.19200300.100.1.1=14001004363742 Date: 2023.06.19 19:33:24 -07'00'
| 2023-06-20T09:23:08-0700 | |
| MARIA STUBITZ |
File details come from the government source that posted it. Updated .