B09_Q_A_140P8121Q0107_0002_0002.pdf

PDF 125 KB Posted

Attached to
REPLACE COMPONETS OF CW PHOTOVOLTAIC Federal contract opportunity
Solicitation number
140P8121Q0107
Issued by
Department of the Interior National Park Service Pacific West Region

View the file

Other files for this federal contract opportunity

Other files attached to REPLACE COMPONETS OF CW PHOTOVOLTAIC, newest first.
File Type Posted
Sol_140P8121Q0107_Amd_0002.pdf PDF
Sol_140P8121Q0107_Amd_0001.pdf PDF
A06_CW_project_site.jpg JPG image
A06_Cottonwood_overview.pdf PDF
Sol_140P8121Q0107.pdf PDF
A04_SOW_CW_Solar.docx DOCX document
DI-137.pdf PDF
A06_Cottonwood_visitor_center.pdf PDF
B03_Wage_Rate_CA2020025_Riverside_County_CA.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUESTIONS & ANSWERS

140P8121Q0107

Q1: Item 10 in the statement of work requests an option A for replacement of batteries. Should we make a separate line on the sf1442 for this amount and would you like the cut sheet for the proposed batteries.

Also do the batteries need to be BAA compliant?

A1: A line item for the “Option A: Batteries” has been created with amendment 001. Yes, please provide the “cut sheet” for any proposed batteries. Yes, the batteries need to be Buy American Act (BAA) compliant. Clauses 52.225-9 and 52.225-10 are listed in the solicitation.

Q2: Please provide the following specifications: installed Outback, provided Outback, Schneider charge controller, propane and diesel generators, as-built drawings (electrical and structural), three-line diagram

A2: The options with the charge controllers, they can use existing but whatever is decided they have to provide all the same model/manufacturer. They should spec the system for 32kw.

Propane Generator 35kw, Diesel Generator 25kw

Manuel transfer switch

Outback Inverters FX3648 current. JOTR will provide an additional inverter to be installed by the contractor

Outback MX80 Charge controllers (2) current

Schnieder XW60 Charge Controllers (3) current

No known as-builts for the system or electrical diagrams exist.

Q3: Does our proposal need to include removal or recycling?

A3: Removal, pallet, and band existing panels for future use within the Park. Removal and disposal/recycle of all other items off site.

Q4: The Scope of Work section 2.c. "Array will be assembled from east to west, allowing 10,000 watts nameplate to be functional at all times throughout the performance period." We do not want to be pulling unenergized conductors in the same raceway as energized conductors as this would be unsafe and violate

Federal OSHA safety requirements. Would the generator(s) be a suitable temporary solution during removal and installation? Or should ISC plan for renting portable generator?

A4: A diesel generator should be planned by the contractor suitable to provide power to CW. Currently a backup diesel generator is on site and can be used for a period of 7 days of constant running if project is estimated to take more than 7 days a contactor supplied generator will be required of 25kw or more.

Q5: What is the existing continuous load ________in watts?

A5: Currently we are using about 150 kWH per day with two houses being vacant.

Q6: What is the anticipated future continuous load _____in watts?

A6: The system should be designed to meet the current requirements of 32 kW for the addition of AC in staff housing. Currently no other future expansion is anticipated.

File details come from the government source that posted it. Updated .