Questions and Answers_0002.pdf

PDF 130 KB Posted

Attached to
GWCA - Replace Water Supply Line Federal contract opportunity
Solicitation number
140P6320Q0078
Issued by
Department of the Interior National Park Service Midwest Region

View the file

Other files for this federal contract opportunity

Other files attached to GWCA - Replace Water Supply Line, newest first.
File Type Posted
Sol_140P6320Q0078_Amd_0002.pdf PDF
Site Visit Sign In Sheet_0002.pdf PDF
Sol_140P6320Q0078_Amd_0001.pdf PDF
Attachment 2 Wage Determination - Heavy.pdf PDF
Attachment 1 Specifications.pdf PDF
Sol_140P6320Q0078.pdf PDF
Attachment 3 Experience Questionnaire.xls XLS spreadsheet

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Replace Park Water Supply Lines George Washington Carver National Monument

Contractor Questions

1. Question: Do we tie into the existing Visitor Center water line inside or outside of the building?

Response: Tie into water line outside of building.

2. Question: There is approximately 1,690 LF of existing water line to be abandoned. Is this existing pipe to be abandoned in place or to be physically removed from the ground?

Response: Existing pipe should be removed.

3. Do we re-use the existing valve vault on the east side of Maintenance Building #22 near the driveway curb?

Response: Existing valve vault should be reused.

4. Question: Do you require open cut or boring/directional drill of the existing street, drive, breezeway?

Response: We require boring instead of open cut.

5. Question: Please verify spec on seeding, mulch restoration.

Response: Type of Seed: lawn areas – perennial tall fescue turf-grass prairie areas – big bluestem

Mulch: Curlex or approved equal