Specifications.pdf

PDF 214 KB Posted

Attached to
OBRI REPLACE FAILING SEPTIC TRAILER Federal contract opportunity
Solicitation number
140P5325Q0013
Issued by
Department of the Interior National Park Service Southeast Region

About this file

This document is a Statement of Specifications for the Obed Wild and Scenic River, issued by the National Park Service, detailing the procurement of a portable sewage pumping unit. The project requires a skid-mounted or trailer-installed unit with specific technical specifications, including a 325-gallon waste collection tank, 150-gallon freshwater storage tank, sanitary two-pump design, hose reel, and various technical requirements for pumps, hoses, and connections. The unit will be delivered to the East Rim Facilities Management Shop in Oneida, Tennessee, with a 120-calendar day performance period from the notice to proceed.

The solicitation is a 100% small business set-aside with a firm-fixed price commercial contract approach, targeting NAICS code 336212 (Truck Trailer Manufacturing). The project's scope involves completely replacing an obsolete portable sewage pumping unit that meets the National Park Service's operational needs. The government will conduct a thorough inspection upon delivery to verify compliance with all specifications, and final payment is contingent on satisfactory completion and correction of any identified deficiencies. Key project personnel from the National Park Service are listed, including contacts from Facilities Maintenance, Buildings and Utilities, and Project Management divisions.

View the file

Other files for this federal contract opportunity

Other files attached to OBRI REPLACE FAILING SEPTIC TRAILER, newest first.
File Type Posted
Sol_140P5325Q0013_Amd_0001.pdf PDF
Updated_Clauses_140P5324Q0013_0001.docx DOCX document
Sol_140P5325Q0013.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Obed Wild and Scenic River Wartburg, Tennessee

Statement of Specifications Replace Failing Septic Pumper Trailer Unit

January 29, 2025

NATIONAL PARK SERVICE

INTERIOR REGION 2, SOUTH ATLANTIC GULF

NORTH MAJOR ACQUISITION BUYING OFFICE

SOS Format

1. BACKGROUND:

2. PROJECT IDENTIFIERS:

3. PLACE OF PERFORMANCE:

4. PERIOD OF PERFORMANCE:

5. SCOPE:

6. TASK:

7. INSPECTION:

8. PROJECT PERSONELL:

1. BACKGROUND:

• Obed Wild and Scenic River (OBRI): Situated near Wartburg, Tennessee, OBRI spans about 5,000 acres with 45 miles of unspoiled, free-flowing streams. Created by Congress on October 12, 1976, its primary goal is to maintain the Obed River System's natural flow and water quality, along with protecting the area's cultural and natural resources. OBRI is renowned for its rugged landscapes, appealing to outdoor enthusiasts with activities such as climbing, hiking, whitewater sports, and fishing. The park plays a crucial role in conserving environmental and cultural heritage and offers diverse recreational opportunities, enhancing its value to the region.

Big South Fork National River and Recreation Area (BISO) will replace an obsolete and deteriorating portable sewage pumping unit. The unit will be replaced with a unit that conforms to current operational needs and requirements within the park.

2. PROJECT IDENTIFIERS:

PMIS NUMBER: 202911A

PROJECT TITLE: “Replace Failing Septic Pumper Trailer Unit”

3. PLACE OF PERFORMANCE:

The National Park Service will accept delivery of the completed sewage pump system at the East Rim Facilities Management Shop located at 4721 Leatherwood Road, Oneida TN 37841

4. PERIOD OF PERFORMANCE:

• The contractor shall complete delivery and installation within 120 calendar days following the receipt of the notice to proceed.

• Exceptions to this timeline are limited to unforeseen events beyond the control of the contractor, such as natural disasters or other force majeure occurrences. In such cases, the contractor shall promptly notify the National Park Service and provide an estimated delay period.

• Delays caused by actions or requirements of the National Park Service will be addressed separately. In these instances, the contractor shall provide a revised timeline for completion, subject to approval by the National Park Service.

Note: The contractor is advised to incorporate a reasonable buffer within their proposed timeline to accommodate potential minor delays and ensure timely completion.

5. SCOPE:

The National Park Service (NPS) will contract the purchase and delivery of a portable sewage pumping unit that meets the following specifications:

Minimum Required Specifications:

• Skid-mounted unit or installed on a utility trailer

• Minimum 325-gallon waste collection tank

• Minimum 150-gallon freshwater storage tank

• Sanitary two-pump design: One for wastewater and one for freshwater handling

• Minimum 3” connection waste recovery pump with 8-20 GPM capacity, 20’ vertical or

75’ horizontal lift

• Small-bore gasoline engine(s) to power pump(s)

• Hose reel for ease of use

• Sight glasses or volumetric markers on tanks for liquid monitoring

• Minimum 3x30’ EPDM non-collapsible collection hose with female aluminum camlocks

• Collection hose with check valve and utility-grade ball valve

• Minimum 2”x10’ lay-flat discharge hose

• All hose and accessory fittings must use aluminum camlocks

• Minimum 36” suction wand with male camlock connection

• The contractor shall provide all materials, supplies, services, and construction necessary to complete the project as outlined in the contract. This includes ensuring that all aspects of the project are executed to the standards specified by the NPS.

• All costs associated with these requirements shall be included in the contractor's bid. No additional funds will be provided by the government beyond the agreed contract amount.

6. TASK:

• Delivery of the specified portable sewage pumping unit to the designated location.

• Verification that the unit meets all specified requirements upon delivery.

7. INSPECTION:

• Inspection Process: Upon completion of the contracted services, the government will conduct a thorough inspection to evaluate the quality and completeness of the work/product. This inspection will be carried out by designated government representatives.

• Criteria for Evaluation: The inspection will assess whether all contract performance and administrative requirements have been met satisfactorily. The evaluation criteria will include adherence to project specifications, quality of workmanship, and compliance with all relevant regulations and standards.

• Deficiency Correction: In cases where deficiencies or non-compliant work are identified during the inspection, the contractor shall make the necessary corrections in a timely manner. The government will provide specific feedback and a timeframe for addressing these issues.

• Final Payment: Final payment for the contracted services will be processed only after the government confirms that all requirements have been satisfactorily completed and any identified deficiencies have been corrected.

8. PROJECT PERSONNEL:

Facilities Maintenance Division Chief: Kenneth Gilreath Phone: (423)569-7319 Email: kenneth_gilreath@nps.gov

Buildings and Utilities Branch Chief: Chris Henry Phone: (423)569-7336 Email: christopher_henry@nps.gov

Project Management Branch Chief: Steve Wilmot Phone: (423)569-9778 Email: stephen_wilmot@nps.gov mailto:kenneth_gilreath@nps.gov