questions_and_answers_0001.pdf

PDF 67 KB Posted

Attached to
BISO REPLACE GUTTERS AND DOWNSPOUTS Federal contract opportunity
Solicitation number
140P5323R0010
Issued by
Department of the Interior National Park Service Southeast Region

View the file

Other files for this federal contract opportunity

Other files attached to BISO REPLACE GUTTERS AND DOWNSPOUTS, newest first.
File Type Posted
Sol_140P5323R0010_Amd_0001.pdf PDF
Pre-Bid_Site_Visit_Sign-In_Sheet_0001.pdf PDF
A3_-_DOL_Wage_Determinations.pdf PDF
A2_-_Statement_of_Work.pdf PDF
Construction_Contract_Administration.docx DOCX document
Sol_140P5323R0010.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

140P5323R0010 Questions and Answers

Amendment 1

1. Question: Roof System – Government to verify that any rot as part of the roof system or roof eave interface are not part of scope and not to be incorporated in the RFP?

Answer: Government verifies that rot as part of the roof system or roof eave interface are not part of the scope. If rot is found COR is to be immediately notified. NPC Carpenters will repair structural rot and the contractor shall resume work as outlined in the Statement of work.

2. Question: Drip Edge – during the pre-bid it was discussed that if during centering the gutter and placement of the drip edge within the gutter, if damage were to occur to the facial board during demo/installation that Contractor is not responsible for this repair.

Answer: Fascia board is scoped to be removed and replaced. If the contractor damages newly installed fascia board during gutter installation, they will be liable for repairs.

3. Question: Ranger Station/Steel - The ranger station is steel capped. What is the Parks expectations? More specifically if we replace the facial board and aluminum and the hang gutters, ensuring the gutters work no matter what might entail non-standard installation practices. We will still comply with the Specification.

Answer: The park is not sure what steel capped is.

4. Question: The soffit on some buildings and whether it was to be replaced in this project. It was not mentioned in the SOW.

Answer: BISO realizes some structures identified in this project have a soffit material installed in conjunction with the fascia. This project will not replace any of the soffit. Contractors shall take all precautions available in order to remove fascia with minimal damage to the soffit. Occurrences where damage is unavoidable shall be immediately reported to the COR.