Sol_140P4522Q0031_Amd_0002.pdf

PDF 93 KB Posted

Attached to
Hazardous Waste Collection, STEA Federal contract opportunity
Solicitation number
140P4522Q0031
Issued by
Department of the Interior National Park Service

View the file

Other files for this federal contract opportunity

Other files attached to Hazardous Waste Collection, STEA, newest first.
File Type Posted
Sol_140P4522Q0031_Amd_0003.pdf PDF
Sol_140P4522Q0031_Amd_0001.pdf PDF
ATTACHMENT__1_WD_1996-00223.pdf PDF
ATTACHMENT_2_Past_Performance_Questionnaire.doc DOC document
ATTACHMENT_3_Price_Schedule_STEA_BASE___OPTIONS_Hazardous_Waste.xls XLS spreadsheet
Sol_140P4522Q0031.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140P4522Q0031 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

PNP

Staten Island NY 10305 Contracting Office 210 New York Ave.

NPS, NER - NPNH

06/02/20220002

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

05/23/2022

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment is to post questions and answers:

1. Question : What is the PPM for PCBs Drum 5gl?

a.Is this solid or Liquid?

b.Please provide a profile.

Answer: This is a solid PCS light Ballast.

2. Question: Lead Paint Debris is on the Price Schedule twice. What is the difference between the two Line items?

a.Does this mostly consist of Paint Chips?

b.Please provide a profile.

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 3

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140P4522Q0031/0002

Answer: This is from paint removal chips.

3. Question: Are the Pesticides and herbicides bulk liquid in a 30gal drum or packaged as loose pack material?

Answer: 2.5 GL Herbicides can and up to 30 OZ.

can on Pesticides.

4. Question: How are Computers and Electronics packaged for disposal and please specify the Unit of Measurement on the Price Schedule.

Answer: This is on a pallet 40-inch x 48-inch x

48 inch high.

5. Question: How are Tires packaged for disposal?

a.What is the average size and weight of each tier?

Answer: Various Sizes and Weights. Car, Riding

Lawn Mower, UTV¿s and Truck Tires

6. Question: For Line item Gas, Water, Dirt, ETC.

What is the concentration of Gas, Water, Dirt?

a.Please provide a profile.

Answer: Not Available.

7. Question: How many shipments do you have per year for Drum disposal?

Answer: 4 Pickups a Year and as needed.

8. Question: Section 2.2.24 Bulk Removal states, the contractor shall furnish a collection vehicle with vacuum pump and hoses. What waste material is generated from this process?

a. How frequently does Steamtown require

Bulk Removal services?

b.How much volume is typically generated from this process?

Answer: This is to vacuum up Oil and Diesel spills as it is happening. In 19 Years, there were two spill of Oil that need to be vacuum off concrete floor inside of building about, 150 gallons.

9. Question: Please provide a usage report for the most recent 1 year period available.

Answer: 4-55 GL Oily Rugs and Sorbents

2- 55 GL Latex Paint Cans.

2-55 GL Drum Oil Paints

2-55 GL Paint Thinner/Solvent

1-6 GL Drum of PCB Light Ballast

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

3 3

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140P4522Q0031/0002

1-10 GL Drum of PCM Light Ballast

2-55 GL Drum of Aerosol Cans

1-55 GL Drum of Antifreeze

5-55 GL Drum of Diesel and Oil Mix

8 Boxes of Light Bulb Lamps

5-5 GL Alkaline Batteries

1-5 GL Lithium Batteries

24 Various Sizes of Lead-Acid

Batteries Vehicle and Emergency Lighting

4-20YD Container of Fly Ash

1-5 GL Contaminated Gasoline

2-55 GL Grease

1 Box 40-inch x 48-inch x 48-inch high of Printer Ink Cartridges

4 Pallets Computers and Electronics

Monitors and TV¿S

10. Drummed PCBs 1x5gal- Is that a solid or liquid PCB?

Answer: This is a solid PCB light Ballast.

11. Question: Can we charge a transportation fee (do they want it wrapped or is it in the load time)?

Answer: Charging for transportation will be up the contracting company doing the work. Do not see a need to wrap, material will be in a drum or box. Load time is up to contractor.

12. Question: Can we charge for a spot fee (do they want it wrapped or is it in the load time)?

Answer: Material will be in a drum or box does not need to wrap. Load time is up the contracting company.

All other terms and conditions remain the same.