Amendment_2_0002.pdf
PDF 129 KB Posted
- Attached to
- FOST CONCRETE FLOOR PROJECT Federal contract opportunity
- Solicitation number
- 140P4323R0025
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P4323R0025_Amd_0002.pdf | ||
| Amendment_1_0001.pdf | ||
| Sol_140P4323R0025_Amd_0001.pdf | ||
| Provisions_and_Clauses.pdf | ||
| Tunnel_Concrete_Floor_SOW.pdf | ||
| Wage_Determination_NY20230014.pdf | ||
| Combined_Synopsis-Solicitation.pdf | ||
| Sol_140P4323R0025.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amendment 2
The purpose of this amendment is to:
1. Provide Government responses to contractor questions;
2. Make correction to the Statement of Work;
3. Extend solicitation close date
Government responses to contractor questions
1. Where will the fill be placed?
• Approximately 6-7 yards of existing fill will be removed from the site by contractor
Statement of Work Correction
Page 3 Ground Preparation Current:
Ground preparation starts with removing seven to eight inches of existing fill approximately 6-7 yards. The excess fill can remain in the tunnel placed in a location chosen by the Chief of maintenance approximately 200 feet from work area. Then, if the remainder of soil has not previously been "disturbed" (i.e., dug up), a 4-in. (minimal) layer of ½” stone will be added approximately 4 yards. The stone also needs to be compacted.
Page 3 Ground Preparation Revised:
Ground preparation starts with removing seven to eight inches of existing fill, approximately 6-7 yards. Approximately 6-7 yards of existing fill will be removed from the site by contractor.
Then, if the remainder of soil has not previously been "disturbed" (i.e., dug up), a 4-in. (minimal) layer of ½” stone will be added approximately 4 yards. The stone also needs to be compacted.
Extend solicitation close date
The solicitation close date is changed from 7 Jun 2023 to 9 Jun 2023.