Amendment_2_0002.pdf

PDF 129 KB Posted

Attached to
FOST CONCRETE FLOOR PROJECT Federal contract opportunity
Solicitation number
140P4323R0025
Issued by
Department of the Interior National Park Service Northeast Region

View the file

Other files for this federal contract opportunity

Other files attached to FOST CONCRETE FLOOR PROJECT, newest first.
File Type Posted
Sol_140P4323R0025_Amd_0002.pdf PDF
Amendment_1_0001.pdf PDF
Sol_140P4323R0025_Amd_0001.pdf PDF
Provisions_and_Clauses.pdf PDF
Tunnel_Concrete_Floor_SOW.pdf PDF
Wage_Determination_NY20230014.pdf PDF
Combined_Synopsis-Solicitation.pdf PDF
Sol_140P4323R0025.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment 2

The purpose of this amendment is to:

1. Provide Government responses to contractor questions;

2. Make correction to the Statement of Work;

3. Extend solicitation close date

Government responses to contractor questions

1. Where will the fill be placed?

• Approximately 6-7 yards of existing fill will be removed from the site by contractor

Statement of Work Correction

Page 3 Ground Preparation Current:

Ground preparation starts with removing seven to eight inches of existing fill approximately 6-7 yards. The excess fill can remain in the tunnel placed in a location chosen by the Chief of maintenance approximately 200 feet from work area. Then, if the remainder of soil has not previously been "disturbed" (i.e., dug up), a 4-in. (minimal) layer of ½” stone will be added approximately 4 yards. The stone also needs to be compacted.

Page 3 Ground Preparation Revised:

Ground preparation starts with removing seven to eight inches of existing fill, approximately 6-7 yards. Approximately 6-7 yards of existing fill will be removed from the site by contractor.

Then, if the remainder of soil has not previously been "disturbed" (i.e., dug up), a 4-in. (minimal) layer of ½” stone will be added approximately 4 yards. The stone also needs to be compacted.

Extend solicitation close date

The solicitation close date is changed from 7 Jun 2023 to 9 Jun 2023.