Sol_140P4323R0018_Amd_0001.pdf
PDF 356 KB Posted
- Attached to
- ACAD- INSTALL NEW FIRE SUPPRESSION SYS Federal contract opportunity
- Solicitation number
- 140P4323R0018
About this file
This document contains responses to questions from potential offerors on a solicitation to install a new fire suppression system. The solicitation seeks offers for products and services to install a new fire pump control panel (FPCP) and associated equipment at a National Park Service facility. Key details include that the FPCP will be provided as an integral part of the fire pump package. Temporary power for a climate controlled artifacts building can be taken from an existing MDP in another building if sufficient power is not available from an alternative source. The existing fire alarm panel is a Simplex 4004 serviced by Seacoast Security, though it may have been replaced, and the new system must interconnect with any existing fire alarm. Conductors for emergency and main power feeds to the FPCP must be sized per NFPA standards. The contract award date is not specified.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B08_Attachment_5__Limitation_on_Subcontracting_Report_Template.xlsx | XLSX spreadsheet | |
| B08_Attachment_2_Drawings.pdf | ||
| Construction_Contract_Administration.docx | DOCX document | |
| B08_Attachment_6_-_Past_Perf_Quest.docx | DOCX document | |
| Sol_140P4323R0018.pdf | ||
| B08_Attachment_3_DOL_DBA_ME20230008_04_07_2023.pdf | ||
| B08_Attachment_1_Specifications.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140P4323R0018 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
Boston MA 02129-4543
PNN
Building I-1 Charlestown Navy Yard Boston National Historical Park
NPS, NER - NE MABO
ACAD-25452809/07/20230001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
08/09/2023
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this Amendment is to provide a response to all questions received, and to extend the date and time for receipt of offers.
Therefore:
1. A response to all questions received is provided in the attached Description of
Amendment.
2. All offers shall be received no later than 10:00 am EDT on September 12, 2023.
Period of Performance: 10/01/2023 to 07/30/2024
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Jason Albright
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
2022028 Curatorial Storage – RFI Response - CA
8/31/2023
1. I see a note Drawing FP3, and as I read the specs it appears to me that the Fire Pump vendor will be providing the ATS to be integral with the Fire Pump package, can you please confirm?
Note 7 on Sheet FP-1 should read, “Fire pump ATS is integral with FPCP.”
2. Per Drawing FP1 Note #7, the conduit feeder from the generator to the 100A Panel PP, located in the Loading/Isolation room, is entering in one end of the Tank Room and then out the back of the Tank room and then into the Collections Room, is that a clearance issue?
2a. I only ask because I was wondering why we can’t enter the Collections Room, from inside the tank room?
Circuit from emergency generator to Panel PP is intended to run through the Curatorial Storage attic space. Curatorial Storage ceiling is higher than Tank Room ceiling.
3. Per Drawing C1, we are to provide temporary power for the Climate Controlled Artifacts Building, where is it planned to get temp power from?
3a. I would suggest something from the Trails Building 294?
Temporary power can be taken from the MDP in Building 194 if adequate power is not available from Building 294.
4. On drawing FP3 it is requiring that the EC provide (2) two new Shunt Trip breakers in the existing MDP does anyone know what the existing MDP is?
4a. If no one knows when could I schedule a site visit before bid due date?
Load shedding of Panel PP, when fire pump comes on, occurs with ATS switching Panel PP from main power to emergency power, and shunt trip breaker in emergency generator opening.
Photos of MPD attached.
5. We need to interconnect the existing Fire Alarm with the new FPCP does anyone know who the existing Fire Alarm Panel is serviced by and what type panel?
Existing panel at time of design, was a Simplex Model 4004, serviced by Seacoast Security. The Government was planning to replace this panel, so it might have been changed by now.
6. I’m sorry as I was taking off the conduit and wire this morning I discovered that the wire size in the 2” conduit for the new 100/80A feed to the pump ATS is only #6 wire, #6 is only rated for 65Amps we should have at a minimum #4 which is rated for 85 amps. for the 80A off the generator and #3 for the 100A from the transformer, Can we please confirm wire sizes are accurate per plans.
Fire Pump ATS/FPCP package is rated as service entrance. Conductors for main power and emergency power are both sized per NFPA 70, 6096-A,B,C (125% of full load current).
The circuit breaker at the emergency generator is only starting a 10 HP motor, so that circuit breaker should be changed to 75 amp instead of 80 amp, so as not to exceed 250% of the motor’s full load current.
Coordinate with utility company to assure protection on primary side of their transformer will carry 6 times locked rotor current of the fire pump motor.
100A to ATS should utilize minimum (4) #3.