Amd0004-PPI-answers_0004.docx

DOCX document 21 KB Posted

Attached to
CACO HAZARDOUS VEGETATION REMOVAL Federal contract opportunity
Solicitation number
140P4323Q0057
Issued by
Department of the Interior National Park Service Northeast Region

About this file

This document contains answers to questions from a contractor regarding the hazardous tree removal solicitation from the National Park Service Northeast Region. The solicitation is for hazardous vegetation removal at Cape Cod National Seashore. The government response indicates that the contractor is responsible for coordinating and paying for any necessary power outages during tree removal work. The contractor must also be solely responsible for complying with all applicable occupational safety and health regulations and requirements. The contractor must submit a safety plan within five days of award outlining its safety inspection, protective equipment, training, hazard reporting, and spill prevention procedures. Prevailing wage rates will be based on the most recent rates posted on SAM.gov at the time of award for the solicitation.

View the file

Other files for this federal contract opportunity

Other files attached to CACO HAZARDOUS VEGETATION REMOVAL, newest first.
File Type Posted
Sol_140P4323Q0057_Amd_0004.pdf PDF
Housing_Tree_Maps_SiteVisit_0003.docx DOCX document
Sol_140P4323Q0057_Amd_0003.pdf PDF
Sol_140P4323Q0057_Amd_0002.pdf PDF
Sol_140P4323Q0057_Amd_0001.pdf PDF
A04_CACO_Remove_Hazardous_Woody_Vegetation_PWS.pdf PDF
CACO_WD_2015-4045-rev_25_5_11_23.pdf PDF
Sol_140P4323Q0057.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CACO – Cape Cod National Seashores, Hazardous Tree Removal Solicitation: 140P4323Q0057

Amendment 0004

Question 001: After reviewing the Nauset Ranger station and the work at Tin Pan Alley it would be safest to have the power disconnected during some of the tree removals. Would this be possible, assuming the ranger station and the maintenance garage have generators? The power disruption would be short term. To have the power shut off the Park Service would have to pay Eversource and Bartlett Tree Experts would handle the scheduling.

Government response: The contractor pays for any electrical outage work and coordination with the local utility. The contractor is responsible for the health and safety of its employees. Paragraph 3.3 of the SOW states, “The contractor is solely responsible for compliance with the Occupational Safety and Health Act (OSHA) (Public Law 91-596) and the resulting standards, OSHA Standard 29 CFR 1910, 1926, American National Standard ANSI Z133 (2017) – Safety Requirements for Arboricultural Operations and the protection of their employees. The contractor shall establish and maintain a Safety Plan that delineates the processes and procedures the contractor shall use to prevent accidents and preserve the life and health of contractor and Government personnel. This plan shall be delivered within 5 calendar days after contract award and shall be reviewed by the COR prior to the start of work at the site. The contractor shall report Contract employees’ accidents and injuries to the contractor’s Project Management Staff, the Contracting Officer, Chief of Facilities, and the COR. The contractor shall be responsible for all damages to persons or safety and health precautions to protect the work, the workers, the public, and the property of others.

The contractor’s Safety Plan shall include the following provisions: 1 The contractor safety inspection plan and investigation process; 2. The contractor plan for contractor personnel protective equipment and safety devices; 3. Equipment maintenance and certifications; 4. Records and certificates for contractor personnel required training; 5. The contractor procedures and practices that minimize accident risk; 6. The contractor hazard reporting procedures IAW 29 Code of Federal Regulations (CFR) 1910, and 1960, as applicable; 7. The contractor’s spill prevention program and plan; and 8. Designated competent person(s) with applicable training and certificates.”

Question 002: Is the prevailing rate wage based on the Government rate or our state rate?

Government response: The Wage Determination is based off the most recent rates posted in SAM.gov at the time of award.