This document provides details for a federal contract opportunity to restore the Bicentennial Bell Garden at Independence National Historical Park. The National Park Service seeks to award a single firm-fixed price contract using best value tradeoff procedures to a small business. The contractor will restore the garden within 120 calendar days of the notice to proceed. The NAICS code is 237990 and the magnitude is estimated between $1,000,000 to $5,000,000. A site visit is scheduled for June 26, 2023 and all questions must be submitted by a week before the proposal deadline. The successful bidder must have a Unique Entity ID and active SAM registration to conduct business with the federal government. Payment and performance bonds will be required within 10 days of award along with bid guarantees submitted with proposals.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P4223R0004_Amd_0002.pdf | ||
| Sol_140P4223R0004_Amd_0001.pdf | ||
| B03_Attachment_3_-_DBA_PA20230004.pdf | ||
| B08_Attachment_7_-_Report_on_Limitation_on_Subcontracting.xlsx | XLSX spreadsheet | |
| B08_Attachment_1_-_Bicentennial_Bell_Garden_100CD_Project_Manual_220623__(REVISED_FEB_2023).pdf | ||
| Construction_Contract_Administration.docx | DOCX document | |
| B08_Attachment_6_-_Past_Performance_Questionnaire.docx | DOCX document | |
| B08_Attachment_4_-_Project_Experience_Questionnaire.docx | DOCX document | |
| B08_Attachment_2_-_BicentennialBell_Garden_100CD_Drawings_220623_(REVISED_FEB_2023).pdf | ||
| B08_Attachment_5_-_Key_Personnel_Qualifications.docx | DOCX document | |
| Sol_140P4223R0004.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140P4223R0004 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
Philadelphia PA 19107 1234 Market Street, 20th Floor
PNC
South/Philadelphia MABO Northeast Regional Contracting National Park Service
DOI, NPS, NERO & NER SOUTH MABO
07/24/20230003
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
06/13/2023
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Amendment issued to additional questions received:
1.Is it acceptable to perform the bluestone etching on site. The process involves sandblasting with a machine designed to contain the aggregate and prevent sand from getting into the air?
Bluestone etching can be performed on site, if necessary.
2. Can you provide CAD file(s) of the 13 colonies etching? If possible, also provide the typeface used for the lettering?
CAD files will be provided to the selected contractor after award.
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Wendy De Leon
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 2
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140P4223R0004/0003
3. What is NPS's desired timeline for this project? When does NPS want the work to be completed?
Sol_140P4223R0004, #11 states the timeline for this project is within 120 days.
4. There is also a discrepancy between the length of the blocks. The illustration states 7 7/8 but the table chart states 4 7/8. Please verify which length is correct.
Sheet L4 in the drawing set has a radius of the paving extents to be between 9'-3" & 20'-1".
Based on this information the Illustration is correct at 7 7/8" and the length in the chart is a typo.
Period of Performance: 09/01/2023 to 12/29/2023