Sol_140P4223R0004_Amd_0001.pdf
PDF 201 KB Posted
- Attached to
- INDE - BICENTENNIAL BELL GARDEN RESTORE Federal contract opportunity
- Solicitation number
- 140P4223R0004
About this file
This document includes a federal contract solicitation and related questions and answers. The solicitation is for restoration work at the Bicentennial Bell Garden located at Independence National Historical Park in Philadelphia, Pennsylvania. The National Park Service seeks a contractor to remove and dispose of existing stone fines, brick pavers, and other materials. The contractor will then install new stone fines and clay pavers according to the project plans. The total small business set-aside contract has an estimated value between $1 million to $5 million and a 120-day period of performance from notice to proceed. The solicitation number is 140P4223R0004 and responses are due on July 5, 2023. A site visit was held on June 26, 2023 and the document provides answers to seven questions asked during or after the site visit.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P4223R0004_Amd_0003.pdf | ||
| Sol_140P4223R0004_Amd_0002.pdf | ||
| B03_Attachment_3_-_DBA_PA20230004.pdf | ||
| B08_Attachment_7_-_Report_on_Limitation_on_Subcontracting.xlsx | XLSX spreadsheet | |
| B08_Attachment_4_-_Project_Experience_Questionnaire.docx | DOCX document | |
| B08_Attachment_2_-_BicentennialBell_Garden_100CD_Drawings_220623_(REVISED_FEB_2023).pdf | ||
| B08_Attachment_5_-_Key_Personnel_Qualifications.docx | DOCX document | |
| B08_Attachment_1_-_Bicentennial_Bell_Garden_100CD_Project_Manual_220623__(REVISED_FEB_2023).pdf | ||
| Construction_Contract_Administration.docx | DOCX document | |
| B08_Attachment_6_-_Past_Performance_Questionnaire.docx | DOCX document | |
| Sol_140P4223R0004.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140P4223R0004 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
Philadelphia PA 19107 1234 Market Street, 20th Floor
PNC
South/Philadelphia MABO Northeast Regional Contracting National Park Service
DOI, NPS, NERO & NER SOUTH MABO
07/05/20230001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
06/13/2023
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Amendment issued to answer questions received after the site visit.
Period of Performance: 09/01/2023 to 12/29/2023
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Wendy De Leon
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
1. Will the tree at the South end of the garden be removed?
Yes, the large tree near the southern entrance to garden will be removed per the Demolition Plan (C1).
2. Are the trees at the North end of the garden adjacent to the perimeter wall staying? Tree roots interfering with existing brick pavement.
All of the existing trees along the northern perimeter wall are to remain. The Site Plan (L1) calls for stone fines to be installed in a new pathway system to replace the existing brick & stone fines pathways.
3. Are the stone fines staying?
The existing stone fines (or stone dust) are to be removed and disposed per the Demolition Plan (C1). New stone fines are to be installed in proposed locations per Site Plan (L1).
4. Is the brick staying? And if so, is it required to save & reuse the existing brick?
All brick pavers within the site limits are to be removed and disposed per the Demolition Plan (C1). See Site Plan (L1) for locations of proposed stone fines and/or clay pavers.
5. Is there any additional staging areas outside of the site?
No, all staging areas and storage of materials or stockpiling are to be confined within the masonry walls that surround the garden (Section 1.4C & Section 1.4F) (01 11 00 – 6).
6. What is the Period of Performance for this project?
As per SOL_140P4223R0004, the period of performance is 120 calendar days after receiving Notice to Proceed.
7. How big is the pipe diameter from water source?
As per the Irrigation Plan (I1), the point of connection is to adapt to 1.5” SCH 40 PVC.
File details come from the government source that posted it. Updated .