140P4220Q0051 (2)_0003.pdf

PDF 554 KB Posted

Attached to
SHEN - OFFICE CLEANING CONTRACT Federal contract opportunity
Solicitation number
140P4220Q0051
Issued by
Department of the Interior National Park Service Northeast Region

About this file

This is a request for quotes for janitorial and custodial services at Shenandoah National Park in Virginia. The contract term is for one base year with four optional one-year extensions. Services include cleaning 20 offices, conference rooms, restrooms, hallways, and common areas across 11 buildings totaling over 30,000 square feet. The contractor must provide all supplies, equipment, and management oversight. Quotes are due by August 4, 2020 and the award will be made on a firm fixed price basis to the responsible offeror providing the best value based on price, qualifications, and past performance. The solicitation is set aside for small disadvantaged businesses.

View the file

Other files for this federal contract opportunity

Other files attached to SHEN - OFFICE CLEANING CONTRACT, newest first.
File Type Posted
Sol_140P4220Q0051_Amd_0003.pdf PDF
Bid Schedule_0003.doc DOC document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6 as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued.

The solicitation number is 140P4220Q0051 and the solicitation is issued as a request for offer (RFQ). The solicitation document and incorporated provisions are those in effect through Federal Acquisition Circular (FAC 2020-06) and Federal Acquisition Regulation (FAR). This is a Small Disadvantaged Business Set-aside procurement under NAICS classification code 561720, Janitorial Services. The small business size standard is gross annual average of $19.5 million over past three years.

Line Item 00010 Janitorial Services – August 10, 2020 through August 9, 2021 Line Item 00020 Option Year 1 - August 10, 2021 through August 9, 2022 (FY21) Line Item 00030 Option Year 2 - August 10, 2022 through August 9, 2023 (FY22) Line Item 00040 Option Year 3 - August 10, 2023 through August 9, 2024 (FY23) Line Item 00050 Option Year 4 - August 10, 2024 through August 9, 2025 (FY24)

The DOI NPS NER CENTRAL MABO requires the following services:

To provide custodial services to Shenandoah National Park (SHEN), as specified in this scope of work.

Shipping must be free on board (FOB) destination CONUS (continental U.S.), which means that the seller must deliver the goods on its conveyance at the destination specified by the buyer, and the seller is responsible for the cost of shipping and risk of loss prior to actual delivery at the specified destination.

Electronic offer submittal shall be accepted for this Request for Quote (RFQ). Facsimile offers shall not be accepted. Quotes shall be emailed to tomica_cooper@nps.gov by August 4, 2020 at 2PM EST. Quote must be good for 30 calendar days after close of solicitation.

Part II – Commercial Contract Clauses

52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements. (JAN 2017)

52.204-13 System for Award Management Maintenance. (OCT 2018)

52.204-19 Incorporation by Reference of Representations and Certifications. (DEC 2014)

52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities. (JUL 2018)

52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (AUG 2019)

52.212-4 Contract Terms and Conditions - Commercial Items. (OCT 2018)

52.232-1 Payments. (APR 1984)

52.232-18 Availability of Funds. (Apr 1984)

52.232-39 Unenforceability of Unauthorized Obligations. (JUN 2013)

52.232-40 Providing Accelerated Payments to Small Business Subcontractors. (DEC 2013)

52.233-1 Disputes. (MAY 2014)

52.233-3 Protest After Award. (AUG 1996)

52.233-4 Applicable Law for Breach of Contract Claim. (OCT 2004)

52.237-2 Protection of Government Buildings, Equipment, and Vegetation. (APR 1984)

52.252-6 Authorized Deviations in Clauses (Apr 1984) mailto:tomica_cooper@nps.gov

52.212-5 Contract Terms and Conditions Required To Implement Statutes or Executive Orders - Commercial Items. (MAR 2020)

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:

(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).

(2) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (JUL 2018) (Section 1634 of Pub. L. 115-91).

(3) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (AUG 2019) (Section 889(a)(1)(A) of Pub. L. 115-232).

(4) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (NOV 2015).

(5) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).

(6) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Public Laws 108-77 and 108-78 (19 U.S.C. 3805 note)).

(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items: (Contracting Officer check as appropriate.)

[X] (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Jun 2020), with Alternate I (OCT 1995) (41 U.S.C. 4704 and 10 U.S.C.

2402).

[ ] (2) 52.203-13, Contractor Code of Business Ethics and Conduct (Jun 2020) (41 U.S.C. 3509).

[ ] (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (JUN 2010) (Section 1553 of Pub. L.

111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)

[X] (4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (Jun 2020) (Pub. L. 109-282) (31 U.S.C. 6101 note).

(5) (Reserved)

[ ] (6) 52.204-14, Service Contract Reporting Requirements (OCT 2016) (Pub. L. 111-117, section 743 of Div. C).

[ ] (7) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (OCT 2016) (Pub. L. 111-117, section 743 of Div.

C).

[X] (8) 52.209-6, Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment.

(Jun 2020) (31 U.S.C. 6101 note).

[ ] (9) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (OCT 2018) (41 U.S.C. 2313).

[ ] (10) (Reserved)

[ ] (11)(i) 52.219-3, Notice of HUBZone Set-Aside or Sole Source Award (MAR 2020) (15 U.S.C. 657a).

[ ] (ii) Alternate I (MAR 2020) of 52.219-3.

[ ] (12)(i) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (MAR 2020) (if the offer elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).

[ ] (ii) Alternate I (MAR 2020) of 52.219-4.

[ ] (13) (Reserved)

[X] (14)(i) 52.219-6, Notice of Total Small Business Set-Aside (MAR 2020) (15 U.S.C. 644).

[ ] (ii) Alternate I (MAR 2020).

[ ] (15)(i) 52.219-7, Notice of Partial Small Business Set-Aside (MAR 2020) (15 U.S.C. 644).

[ ] (ii) Alternate I (MAR 2020) 52.219-7.

[X] (16) 52.219-8, Utilization of Small Business Concerns (OCT 2018) (15 U.S.C. 637(d)(2) and (3)).

[ ] (17)(i) 52.219-9, Small Business Subcontracting Plan (Jun 2020) (15 U.S.C. 637(d)(4)).

[ ] (ii) Alternate I (NOV 2016) of 52.219-9.

[ ] (iii) Alternate II (NOV 2016) of 52.219-9.

[ ] (iv) Alternate III (Jun 2020) of 52.219-9.

[ ] (v) Alternate IV (Jun 2020) of 52.219-9.

[X] (18) 52.219-13, Notice of Set-Aside of Orders (MAR 2020) (15 U.S.C. 644(r)).

[X] (19) 52.219-14, Limitations on Subcontracting (MAR 2020) (15 U.S.C. 637(a)(14)).

[ ] (20) 52.219-16, Liquidated Damages-Subcontracting Plan (JAN 1999) (15 U.S.C. 637(d)(4)(F)(i)).

[ ] (21) 52.219-27, Notice of Service-Disabled Veteran-Owned Small Business Set-Aside (MAR 2020) (15 U.S.C. 657f).

[X] (22)(i) 52.219-28, Post-Award Small Business Program Rerepresentation (May 2020) (15 U.S.C. 632(a)(2)).

[ ] (ii) Alternate I (MAR 2020) of 52.219-28.

[ ] (23) 52.219-29, Notice of Set-Aside for, or Sole Source Award to, Economically Disadvantaged Women-Owned Small Business (EDWOSB) Concerns (MAR 2020) (15 U.S.C. 637(m)).

[ ] (24) 52.219-30, Notice of Set-Aside for, or Sole Source Award to, Women-Owned Small Business Concerns Eligible Under the Women- Owned Small Business Program (MAR 2020) (15 U.S.C. 637(m)).

[ ] (25) 52.219-32, Orders Issued Directly Under Small Business Reserves (MAR 2020) (15 U.S.C. 644(r)).

[ ] (26) 52.219-33, Nonmanufacturer Rule (MAR 2020) (15 U.S.C. 637(a)(17)).

[X] (27) 52.222-3, Convict Labor (JUN 2003) (E.O. 11755).

[X] (28) 52.222-19, Child Labor-Cooperation with Authorities and Remedies (JAN 2020) (E.O. 13126).

[X] (29) 52.222-21, Prohibition of Segregated Facilities (APR 2015).

[X] (30)(i) 52.222-26, Equal Opportunity (SEP 2016) (E.O. 11246).

[ ] (ii) Alternate I (FEB 1999) of 52.222-26.

[X] (31)(i) 52.222-35, Equal Opportunity for Veterans (Jun 2020) (38 U.S.C. 4212).

[ ] (ii) Alternate I (JUL 2014) of 52.222-35.

[X] (32)(i) 52.222-36, Equal Opportunity for Workers with Disabilities (JUL 2014) (29 U.S.C. 793).

[ ] (ii) Alternate I (JUL 2014) of 52.222-36.

[X] (33) 52.222-37, Employment Reports on Veterans (Jun 2020) (38 U.S.C. 4212).

[X] (34) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (DEC 2010) (E.O. 13496).

[X] (35)(i) 52.222-50, Combating Trafficking in Persons (JAN 2019) (22 U.S.C. chapter 78 and E.O. 13627).

[ ] (ii) Alternate I (MAR 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).

[X] (36) 52.222-54, Employment Eligibility Verification (OCT 2015). (E. O. 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial items as prescribed in 22.1803.)

[ ] (37)(i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA-Designated Items (MAY 2008) (42 U.S.C. 6962(c)(3)(A)(ii)).

(Not applicable to the acquisition of commercially available off-the-shelf items.)

[ ] (ii) Alternate I (MAY 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

[ ] (38) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (JUN 2016) (E.O. 13693).

[ ] (39) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners (JUN 2016) (E.O. 13693).

[ ] (40)(i) 52.223-13, Acquisition of EPEAT®-Registered Imaging Equipment (JUN 2014) (E.O.s 13423 and 13514).

[ ] (ii) Alternate I (OCT 2015) of 52.223-13.

[ ] (41)(i) 52.223-14, Acquisition of EPEAT®-Registered Televisions (JUN 2014) (E.O.s 13423 and 13514).

(ii) Alternate I (JUN 2014) of 52.223-14.

[ ] (42) 52.223-15, Energy Efficiency in Energy-Consuming Products (DEC 2007) (42 U.S.C. 8259b).

[ ] (43)(i) 52.223-16, Acquisition of EPEAT®-Registered Personal Computer Products (OCT 2015) (E.O.s 13423 and 13514).

[ ] (ii) Alternate I (JUN 2014) of 52.223-16.

[X] (44) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging While Driving (Jun 2020) (E.O. 13513).

[ ] (45) 52.223-20, Aerosols (JUN 2016) (E.O. 13693).

[ ] (46) 52.223-21, Foams (JUN 2016) (E.O. 13693).

[ ] (47)(i) 52.224-3, Privacy Training (JAN 2017) (5 U.S.C. 552a).

[ ] (ii) Alternate I (JAN 2017) of 52.224-3.

[X] (48) 52.225-1, Buy American-Supplies (MAY 2014) (41 U.S.C. chapter 83).

[X] (49)(i) 52.225-3, Buy American-Free Trade Agreements-Israeli Trade Act (MAY 2014) (41 U.S.C. chapter 83, 19 U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, Pub. L. 103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, and 112-43.

[ ] (ii) Alternate I (MAY 2014) of 52.225-3.

[ ] (iii) Alternate II (MAY 2014) of 52.225-3.

[ ] (iv) Alternate III (MAY 2014) of 52.225-3.

[ ] (50) 52.225-5, Trade Agreements (OCT 2019) (19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).

[X] (51) 52.225-13, Restrictions on Certain Foreign Purchases (JUN 2008) (E.O.'s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).

[ ] (52) 52.225-26, Contractors Performing Private Security Functions Outside the United States (OCT 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).

[ ] (53) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (NOV 2007) (42 U.S.C. 5150).

[ ] (54) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (NOV 2007) (42 U.S.C. 5150).

[ ](55) 52.229-12, Tax on Certain Foreign Procurements (JUN 2020).

[ ] (56) 52.232-29, Terms for Financing of Purchases of Commercial Items (FEB 2002) (41 U.S.C. 4505, 10 U.S.C. 2307(f)).

[ ] (57) 52.232-30, Installment Payments for Commercial Items (JAN 2017) (41 U.S.C. 4505, 10 U.S.C. 2307(f)).

[X] (58) 52.232-33, Payment by Electronic Funds Transfer-System for Award Management (OCT 2018) (31 U.S.C. 3332).

[ ] (59) 52.232-34, Payment by Electronic Funds Transfer - Other than System for Award Management (JUL 2013) (31 U.S.C. 3332).

[ ] (60) 52.232-36, Payment by Third Party (MAY 2014) (31 U.S.C. 3332).

[ ] (61) 52.239-1, Privacy or Security Safeguards (AUG 1996) (5 U.S.C. 552a).

[ ] (62) 52.242-5, Payments to Small Business Subcontractors (JAN 2017)(15 U.S.C. 637(d)(13)).

[ ] (63)(i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (FEB 2006) (46 U.S.C. Appx. 1241(b) and 10 U.S.C. 2631).

[ ] (ii) Alternate I (APR 2003) of 52.247-64.

[ ] (iii) Alternate II (FEB 2006) of 52.247-64.

(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items: (Contracting Officer check as appropriate.)

[X] (1) 52.222-41, Service Contract Labor Standards (AUG 2018) (41 U.S.C. chapter 67).

[X] (2) 52.222-42, Statement of Equivalent Rates for Federal Hires (MAY 2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67).

[X] (3) 52.222-43, Fair Labor Standards Act and Service Contract Labor Standards-Price Adjustment (Multiple Year and Option Contracts) (AUG 2018) (29 U.S.C. 206 and 41 U.S.C. chapter 67).

[ ] (4) 52.222-44, Fair Labor Standards Act and Service Contract Labor Standards-Price Adjustment (MAY 2014) (29 U.S.C 206 and 41 U.S.C.

chapter 67).

[ ] (5) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment-Requirements (MAY 2014) (41 U.S.C. chapter 67).

[ ] (6) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services-Requirements (MAY 2014) (41 U.S.C. chapter 67).

[X] (7) 52.222-55, Minimum Wages Under Executive Order 13658 (DEC 2015).

[X] (8) 52.222-62, Paid Sick Leave Under Executive Order 13706 (JAN 2017) (E.O. 13706).

[ ] (9) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (Jun 2020) (42 U.S.C. 1792).

(d) Comptroller General Examination of Record. The Contractor shall comply with the provisions of this paragraph (d) if this contract was awarded using other than sealed bid, is in excess of the simplified acquisition threshold, as defined in FAR 2.101, on the date of award of this contract, and does not contain the clause at 52.215-2, Audit and Records-Negotiation.

(1) The Comptroller General of the United States, or an authorized representative of the Comptroller General, shall have access to and right to examine any of the Contractor's directly pertinent records involving transactions related to this contract.

(2) The Contractor shall make available at its offices at all reasonable times the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR Subpart 4.7, Contractor Records Retention, of the other clauses of this contract. If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement. Records relating to appeals under the disputes clause or to litigation or the settlement of claims arising under or relating to this contract shall be made available until such appeals, litigation, or claims are finally resolved.

(3) As used in this clause, records include books, documents, accounting procedures and practices, and other data, regardless of type and regardless of form. This does not require the Contractor to create or maintain any record that the Contractor does not maintain in the ordinary course of business or pursuant to a provision of law.

(e)(1) Notwithstanding the requirements of the clauses in paragraphs (a), (b), (c), and (d) of this clause, the Contractor is not required to flow down any FAR clause, other than those in this paragraph (e)(1) of this paragraph in a subcontract for commercial items. Unless otherwise indicated below, the extent of the flow down shall be as required by the clause-

(i) 52.203-13, Contractor Code of Business Ethics and Conduct (OCT 2015) (41 U.S.C. 3509).

(ii) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).

(iii) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (JUL 2018) (Section 1634 of Pub. L. 115-91).

(iv) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (AUG 2019) (Section 889(a)(1)(A) of Pub. L. 115-232).

(v) 52.219-8, Utilization of Small Business Concerns (Oct 2018) (15 U.S.C.637(d)(2) and (3)), in all subcontracts that offer further subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds the applicable threshold specified in FAR 19.702(a) on the date of subcontract award, the subcontractor must include 52.219-8 in lower tier subcontracts that offer subcontracting opportunities.

(vi) 52.222-21, Prohibition of Segregated Facilities (APR 2015).

(vii) 52.222-26, Equal Opportunity (SEP 2016) (E.O. 11246).

(viii) 52.222-35, Equal Opportunity for Veterans (Jun 2020) (38 U.S.C. 4212).

(ix) 52.222-36, Equal Opportunity for Workers with Disabilities (Jun 2020) (29 U.S.C. 793).

(x) 52.222-37, Employment Reports on Veterans (Jun 2020) (38 U.S.C. 4212).

(xii) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (DEC 2010) (E.O. 13496). Flow down required in accordance with paragraph (f) of FAR clause 52.222-40.

(xii) 52.222-41, Service Contract Labor Standards (AUG 2018) (41 U.S.C. chapter 67).

(xiii) [ ] (A) 52.222-50, Combating Trafficking in Persons (JAN 2019) (22 U.S.C. chapter 78 and E.O. 13627).

[ ] (B) Alternate I (MAR 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).

(xv) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment-Requirements (MAY 2014) (41 U.S.C. chapter 67).

(xvi) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services-Requirements (MAY 2014) (41 U.S.C. chapter 67).

(xvii) 52.222-54, Employment Eligibility Verification (OCT 2015) (E. O. 12989).

(xviii) 52.222-55, Minimum Wages Under Executive Order 13658 (DEC 2015).

(xix) 52.222-62 Paid Sick Leave Under Executive Order 13706 (JAN 2017) (E.O. 13706).

(xx)(A) 52.224-3, Privacy Training (JAN 2017) (5 U.S.C. 552a).

(B) Alternate I (JAN 2017) of 52.224-3.

(xxi) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (Jun 2020) (42 U.S.C. 1792). Flow down required in accordance with paragraph (e) of FAR clause 52.226-6.

(xxii) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (FEB 2006) (46 U.S.C. Appx. 1241(b) and 10 U.S.C. 2631).

Flow down required in accordance with paragraph (d) of FAR clause 52.247-64.

(2) While not required, the Contractor May include in its subcontracts for commercial items a minimal number of additional clauses necessary to s

Alternate II. (Jun 2020) As prescribed in 12.301(b)(4)(ii), substitute the following paragraphs (d)(1) and (e)(1) for paragraphs (d)(1) and (e)(1) of the basic clause as follows:

(d)(1) The Comptroller General of the United States, an appropriate Inspector General appointed under section 3 or 8 G of the Inspector General Act of 1978 (5 U.S.C. App.), or an authorized representative of either of the foregoing officials shall have access to and right to—

(i) Examine any of the Contractor’s or any subcontractors’ records that pertain to, and involve transactions relating to, this contract; and

(ii) Interview any officer or employee regarding such transactions.

(e)(1) Notwithstanding the requirements of the clauses in paragraphs (a), (b), and (c), of this clause, the Contractor is not required to flow down any FAR clause in a subcontract for commercial items, other than—

(i) Paragraph (d) of this clause. This paragraph flows down to all subcontracts, except the authority of the Inspector General under paragraph (d)(1)(ii) does not flow down; and

(ii) Those clauses listed in this paragraph (e)(1). Unless otherwise indicated below, the extent of the flow down shall be as required by the clause-

(A) 52.203-13, Contractor Code of Business Ethics and Conduct (Jun 2020) (41 U.S.C. 3509).

(B) 52.203-15, Whistleblower Protections Under the American Recovery and Reinvestment Act of 2009 (Jun 2010) (Section 1553 of Pub. L. 111- 5).

(C) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (Jul 2018) (Section 1634 of Pub. L. 115-91).

(D) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (Aug 2019) (Section 889(a)(1)(A) of Pub. L. 115-232).

(E) 52.219-8, Utilization of Small Business Concerns (Oct 2018) (15 U.S.C. 637(d)(2) and (3)), in all subcontracts that offer further subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds the applicable threshold specified in FAR 19.702(a) on the date of subcontract award, the subcontractor must include 52.219-8 in lower tier subcontracts that offer subcontracting opportunities.

(F) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).

(G) 52.222-26, Equal Opportunity (Sep 2016) (E.O. 11246).

(H) 52.222-35, Equal Opportunity for Veterans (Jun 2020) (38 U.S.C. 4212).

(I) 52.222-36, Equal Opportunity for Workers with Disabilities (Jun 2020) (29 U.S.C. 793).

(J) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O. 13496). Flow down required in accordance with paragraph (f) of FAR clause 52.222-40.

(K) 52.222-41, Service Contract Labor Standards (Aug 2018) (41 U.S.C.chapter 67).

(L) ___(1) 52.222-50, Combating Trafficking in Persons (Jan 2019) (22 U.S.C. chapter 78 and E.O 13627).

___(2) Alternate I (Mar 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O 13627).

(M) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment-Requirements (May 2014) (41 U.S.C. chapter 67).

(N) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services-Requirements (May 2014) (41 U.S.C. chapter 67).

(O) 52.222-54, Employment Eligibility Verification (Oct 2015) (Executive Order 12989).

(P) 52.222-55, Minimum Wages Under Executive Order 13658 (Dec 2015).

(Q) 52.222-62, Paid Sick Leave Under Executive Order 13706 (Jan 2017) (E.O. 13706).

(R)(1) 52.224-3, Privacy Training (Jan 2017) (5 U.S.C. 552a).

(2) Alternate I (Jan 2017) of 52.224-3.

(S) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Oct 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).

(T) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations. (Jun 2020) (42 U.S.C. 1792). Flow down required in accordance with paragraph (e) of FAR clause 52.226-6.

(U) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Feb 2006) (46 U.S.C. Appx. 1241(b) and 10 U.S.C. 2631). Flow down required in accordance with paragraph (d) of FAR clause 52.247-64 .

satisfy its contractual obligations.

(End of clause)

52.217-8 Option To Extend Services. (NOV 1999)

The Government may require continued performance of any services within the limits and at the rates specified in the contract. These rates may be adjusted only as a result of revisions to prevailing labor rates provided by the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed 6 months. The Contracting Officer may exercise the option by written notice to the Contractor within 60 days.

(End of clause)

52.217-9 Option To Extend the Term of the Contract. (MAR 2000)

(a) The Government may extend the term of this contract by written notice to the Contractor within 60 days; provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 30 days before the contract expires. The preliminary notice does not commit the Government to an extension.

(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.

(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed (5 years and 6 months) or (66 months).

(End of clause)

52.228-5 Insurance - Work on a Government Installation. (JAN 1997)

(a) The Contractor shall, at its own expense, provide and maintain during the entire performance of this contract, at least the kinds and minimum amounts of insurance required in the schedule or elsewhere in the contract.

(b) Before commencing work under this contract, the Contractor shall notify the Contracting Officer in writing that the required insurance has been obtained. The policies evidencing required insurance shall contain an endorsement to the effect that any cancellation or any material change adversely affecting the Government's interest shall not be effective (1) for such period as the laws of the State in which this contract is to be performed prescribe, or (2) until 30 days after the insurer or the Contractor gives written notice to the Contracting Officer, whichever period is longer.

(c) The Contractor shall insert the substance of this clause, including this paragraph (c), in subcontracts under this contract that require work on a Government installation and shall require subcontractors to provide and maintain the insurance required in the Schedule or elsewhere in the contract. The Contractor shall maintain a copy of all subcontractors' proofs of required insurance, and shall make copies available to the Contracting Officer upon request.

(End of clause)

52.252-2 Clauses Incorporated by Reference. (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

https://acquisition.gov

(End of clause)

AUTHORITIES AND DELEGATIONS (SEPT 2011)

Authorities and Delegations (SEP 2011)

(a) The Contracting Officer is the only individual authorized to enter into or terminate this contract, modify any term or condition of this contract, waive any requirement of this contract, or accept nonconforming work.

(b) The Contracting Officer will designate a Contracting Officer's Representative (COR) at time of award. The COR will be responsible for technical monitoring of the contractor's performance and deliveries. The COR will be appointed in writing, and a copy of the appointment will be furnished to the Contractor. Changes to this delegation will be made by written changes to the existing appointment or by issuance of a new appointment.

(c) The COR is not authorized to perform, formally or informally, any of the following actions:

(1) Promise, award, agree to award, or execute any contract, contract modification, or notice of intent that changes or may change this contract;

(2) Waive or agree to modification of the delivery schedule;

(3) Make any final decision on any contract matter subject to the Disputes Clause;

(4) Terminate, for any reason, the Contractor's right to proceed;

(5) Obligate in any way, the payment of money by the Government.

(d) The Contractor shall comply with the written or oral direction of the Contracting Officer or authorized representative(s) acting within the scope and authority of the appointment memorandum.

The Contractor need not proceed with direction that it considers to have been issued without proper authority. The Contractor shall notify the Contracting Officer in writing, with as much detail as possible, when the COR has taken an action or has issued direction (written or oral) that the Contractor considers to exceed the COR's appointment, within 3 days of the occurrence. Unless otherwise provided in this contract, the Contractor assumes all costs, risks, liabilities, and consequences of performing any work it is directed to perform that falls within any of the categories defined in paragraph (c) prior to receipt of the Contracting Officer's response issued under paragraph (e) of this clause.

(e) The Contracting Officer shall respond in writing within 30 days to any notice made under paragraph (d) of this clause. A failure of the parties to agree upon the nature of a direction, or upon the contract action to be taken with respect thereto, shall be subject to the provisions of the Disputes clause of this contract.

(f) The Contractor shall provide copies of all correspondence to the Contracting Officer and the COR.

(g) Any action(s) taken by the Contractor, in response to any direction given by any person acting on behalf of the Government or any Government official other than the Contracting Officer or the COR acting within his or her appointment, shall be at the Contractor's risk.

https://acquisition.gov/

(End of clause)

Contractor Performance Assessment Reporting System (December 2015)

1. FAR 42.1502 directs all Federal agencies to collect past performance information on contracts. The Department of the Interior (DOI) has implemented the Contractor Performance Assessment Reporting System (CPARS) to comply with this regulation. One or more past performance evaluations will be conducted in order to record your contract performance as required by FAR 42.15.

2. The past performance evaluation process is a totally paperless process using CPARS. CPARS is a web-based system that allows for electronic processing of the performance evaluation report. Once the report is processed, it is available in the Past Performance Information Retrieval System (PPIRS) for Government use in evaluating past performance as part of a source selection action.

3. We request that you furnish the Contracting Officer (CO) with the name, position title, phone number, and email address for each person designated to have access to your firm's past performance evaluation(s) for the contract no later than 30 days after award. Each person granted access will have the ability to provide comments in the Contractor portion of the report and state whether or not the Contractor agrees with the evaluation, before returning the report to the Assessing Official (AO). Information in the report must be protected as source selection sensitive information not releasable to the public.

4. When your Contractor Representative(s) are registered in CPARS, they will receive an automatically generated email with detailed login instructions. Further details, systems requirements, and training information for CPARS is available at https://www.cpars.gov/.

5. Within 60 days after the end of a performance period, the AO will complete an interim or final past performance evaluation, and the report will be accessible at https://www.cpars.gov/.

a. Contractor Representatives may then provide comments in response to the 6.evaluation, or return the evaluation without comment.

b. Your comments should focus on objective facts in the AO's narrative and should a)provide your views on the causes and ramifications of the assessed performance.

c. All information provided should be reviewed for accuracy prior to submission.

d. If you elect not to provide comments, please acknowledge receipt of the evaluation by indicating "No comment" in the space provided, and then selecting “Accept the Ratings and Close the Evaluation”.

e. Your response is due within 60 calendar days after receipt of the CPAR. On day 15, the evaluation will become available in PPIRS-RC marked as “Pending” with or without comments and whether or not it has been closed.

f. If you do not sign and submit the CPAR within 60 days, it will automatically be returned to the Government and will be annotated: "The report was delivered/received by the contractor on (date). The contractor neither signed nor offered comment in response to this assessment."

6. The following guidelines apply concerning your use of the past performance evaluation:

a. Protect the evaluation as source selection information. After review, transmit the evaluation by completing and submitting the form through CPARS. If for some reason you are unable to view and/or submit the form through CPARS, contact the CO for instructions.

b. Strictly control access to the evaluation within your organization. Ensure the evaluation is never released to persons or entities outside of your control.

c. Prohibit the use of or reference to evaluation data for advertising, promotional material, pre-award surveys, responsibility determinations, production readiness reviews, or other similar purposes.

7. If you wish to discuss a past performance evaluation, you should request a meeting in writing to the CO no later than seven days following your receipt of the evaluation. The meeting will be held in person or via telephone or other means during your 60-day review period.

8 A copy of the completed past performance evaluation will be available in CPARS for your viewing and for Government use supporting source selection actions after it has been finalized.

End of notice

1452.228-70 Liability Insurance (JUL 1996)

(a) The Contractor shall procure and maintain during the term of this contract and any extension thereof liability insurance in form satisfactory to the Contracting Officer by an insurance company which is acceptable to the Contracting Officer. The named insured parties under the policy shall be the Contractor and the United States of America. The amounts of the insurance shall be not less than as follows:

$200,000.00 each person*

$500,000.00 each occurrence*

$20,000.00 property damage*

(b) Each policy shall have a certificate evidencing the insurance coverage. The insurance company shall provide an endorsement to notify the Contracting Officer 30 days prior to the effective date of cancellation or termination of the policy or certificate; or modification of the policy or certificate which may adversely affect the interest of the Government in such insurance. The certificate shall identify the contract number, the https://www.acquisition.gov/sites/default/files/current/far/html/Subpart%2042_15.html https://www.acquisition.gov/sites/default/files/current/far/html/Subpart%2042_15.html https://www.cpars.gov/ https://www.cpars.csd.disa.mil/ https://www.cpars.gov/ name and address of the Contracting Officer, as well as the insured, the policy number and a brief description of contract services to be performed.

The contractor shall furnish the Contracting Officer with a copy of an acceptable insurance certificate prior to beginning the work.

*These amounts to be set by the Contracting Officer.

(End of clause)

DOI ELECTRONIC INVOICING Electronic Invoicing and Payment Requirements - Invoice Processing Platform (IPP) (April 2013)

Payment requests must be submitted electronically through the U. S. Department of the Treasury’s Invoice Processing Platform System (IPP).

"Payment request" means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions - Commercial Items included in commercial item contracts. The IPP website address is: https://www.ipp.gov.

Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice: Purchase order number, contract line item number(s), invoice number and amount.

The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of Boston (FRBB) prior to the contract award date, but no more than 3-5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email ippgroup@bos.frb.org or phone (866)973-3131.

If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.

(End of clause)

Part III- Contract Document, Exhibits, and Attachments

DESCRIPTION OF SERVICES

The Contractor shall provide all management, supervision, labor, material, supplies, and equipment (except as otherwise provided) and shall plan, schedule, coordinate, and assure effective performance of all services described herein. The Contractor will be required to provide janitorial/custodial services in accordance with this solicitation at Shenandoah National Park Headquarters Area, located at 3655 U.S. Highway 211 East, Luray, VA 22835.

Scope of Work:

The Contractor shall provide the management, supervision, manpower, equipment, and supplies necessary to provide custodial and related services as described herein. Work under this contract is expected to commence on or about August 10, 2020.

Contract Effort Required:

• Work shall be performed between the hours of 4:30 p.m. and 7:00 a.m., Monday through Friday, unless noted differently in the contract or specifically approved by the CO. The Contractor shall arrange his work so as not to cause interference with normal conductance of Government business.

• The determination of the total daily productive work-hour requirements for the performance of all services specified herein is the sole responsibility of the contractor. Hours not provided on one day cannot be made up on another day.

Supervision:

• The Contractor shall furnish the COR with a list of telephone numbers where either he or his authorized representatives may be contacted day or night to provide required service. It is the policy of the National Park Service that Government direction or supervision of the Contractor’s employees, directly or indirectly, shall not be exercised.

https://www.ipp.gov/

• The Contractor shall provide in writing to the Contracting Officer at least five days prior to the start date, the telephone numbers and addresses of on-site supervisors.

• The term “on-site supervisor” means a person designated in writing by the Contractor who has the authority to act for the Contractor on a day-to-day basis at the work site and to accept and sign for notices of deductions, inspection reports, and all other correspondence on behalf of the Contractor.

Qualifications of Contractor:

Quality Assurance

The Contractor shall possess successful experience managing custodial contracts similar in type and extent to that indicated in this scope of work.

The Contractor shall provide a list of at least two references demonstrating past performance on recent similar contracts completed.

Qualifications of Supervisory Employees:

All on-site supervisory personnel engaged in directing the work to be accomplished under this contract shall be fully conversant in English and possess at least two years of recent (within the past five years) experience in directing cleaning type operations in a supervisory capacity for buildings of the approximate size and complexity of the buildings to be cleaned. Both new and replacement supervisors must meet these qualifications. The Contractor shall provide a resume of the supervisor(s) indicating such experience.

Qualifications of Other Contractor Personnel:

• The personnel employed by the Contractor shall be capable employees, trained and qualified in custodial type work.

• All Contractor employees shall be bonded. Provide proof of bonding to Contracting Officer within five days of contract starting.

• Contractor to show proof of insurance.

• All contract employees are required to have a successfully adjudicated background clearance.

• The Contractor’s employees shall be familiar with the building fire and intrusion alarm systems and trained on the procedures to follow in the event of fire or other emergency.

Personnel Training:

• All contract supervisory employees are required to attend an orientation conducted by the COR. The orientation will include an explanation of the occupant agency's function and tour of the building/facility. It will also familiarize contract employees with key client agency personnel and areas of the building/facility requiring special attention.

• The Contractor is required to provide training for their employees encompassing grooming, proper attire, and the importance of professionalism and courtesy in daily contacts with visitors and park employees. Emphasis should also be placed on conflict avoidance and problem resolution. Unacceptable behaviors, including sexual harassment, will not be tolerated.

Scheduling Work:

• Five days prior to the contract starting date, and annually thereafter, if options are exercised by the Government, the Contractor shall submit to the COR an annual schedule of window cleaning and carpet cleaning.

• The Contractor shall provide to the COR after award and updated as needed, a schedule for any cleaning that requires coordination with building occupants.

• In case an emergency exists during the Contractor’s employees normal working hours (such as flooding of a particular section of the building or a special event is being held), the Contractor shall divert his force as directed by the COR to meet the emergency/special event. When these employees are no longer needed, they shall return to their normal duties. The Contractor and COR shall agree on what work, if any, shall be foregone that day due to the emergency or special event. It will be the discretion of the COR whether work will be suspended in the event of natural disaster or closure of the park.

Supplies, Materials, Equipment and Utilities:

Furnished by the Government:

Space:

• Space will be allotted in the building for the storage of a reasonable amount of supplies and equipment to be utilized in the performance of work under this contract. The Contractor shall maintain this space in a neat and orderly condition. The Government will not provide telephones or office space for Contractor usage. At the completion of the contract, all facilities shall be returned to the Government in the same condition as received, except for reasonable wear and tear. The Contractor shall be held accountable and liable for the cost of any repairs to facilities, fixtures, furnishings, equipment or grounds caused by negligence on his part or on the part of his employees.

• Janitorial closets, where available, are to be used to store equipment. These closets will be kept clean and orderly. Any electrical panels will be clear of any items with-in 36” of the panel. No flammable or explosive liquids such as gasoline will be stored in the building.

Building Access Key:

The Government will furnish a single building access key for those buildings to be cleaned outside of normal business hours. That key will be the responsibility of the Contractor.

HVAC:

Heating and air conditioning of space will be furnished only during normal working hours of building occupants.

Water and Electricity:

The Government will furnish water and electricity to perform the contract on a where-is, as-is basis.

Cleaning Products:

The Government will supply hand soap, paper towels, wastebasket liners, and toilet paper for the use in executing this contract. The contractor will keep weekly logs of the supplies used and will provide those logs to the COR on a monthly basis. The contractor will also request new supplies one week before they are needed.

Furnished by the Contractor:

Supplies and Storage:

The Contractor shall furnish all supplies, materials, equipment and employee training necessary for the performance of the work of this contract unless otherwise specified herein. Training shall include all applicable OSHA and National Park Service standards. The Contractor shall establish and maintain adequate methods of storage. The Government will not be responsible for damage or loss to the Contractor’s stored supplies or equipment.

Safety Data Sheets (SDS):

The Contractor shall furnish all SDS for any materials used in the performance of this contract other than what is supplied by the Government.

Environmentally Friendly Materials:

The Contractor shall use environmentally friendly materials which have demonstrated their effectiveness. Preference should be given to items that are fully biodegradable, phosphate-free, non-corrosive and non-flammable. The Contractor shall not use any material that the COR determines would not be suitable for the purpose or harmful to the surfaces to which applied. Costs for correcting damage caused by the Contractor will be borne by the Contractor.

Equipment:

The Contractor shall furnish all equipment needed for the performance of the work of this contract. All equipment must be properly guarded and meet all applicable OSHA standards. If a piece of equipment is deemed defective and is determined unsafe by the COR, the Contractor shall immediately stop using the equipment and either have it repaired or replaced within 72 hours.

Occupant Feedback Program:

• The Contractor shall institute an occupant feedback program as a means of assisting in documenting certain kinds of service problems.

The tenants will contact the on-site supervisor regarding any feedback. If the problems are not resolved within two days of initial contact, the tenant will contact the COR.

• A feedback log will be maintained by the Contractor for review at any time by the COR. This occupant feedback program will be considered in evaluating the Contractor’s performance.

Inspection and Acceptance:

The Contracting Officer has the overall responsibility for the administration of this contract. He/she alone, without delegation, is authorized to take actions on behalf of the Government to amend, modify or deviate from the contract terms, conditions, requirements and specifications.

However, he/she may delegate certain other responsibilities to his/her authorized representative

Circumstances to be Reported:

The Contractor or the Contractor’s employees shall report circumstances of the needed repair of the facility or unusual soiling of an area which may affect the performance of the work, unhealthful or hazardous conditions, and delays or interference with the work caused by the employees of the Government. Such reports shall be made without delay to the COR.

Pesticide Usage:

The Contractor is not to engage in any type of pest control. Fogs, insecticide spray, dust, and containerized or paste-type bait formulations or any other means of repelling, trapping or poisoning is strictly forbidden. If the Contractor detects an obvious pest infestation either within the building or exterior to the building, it is to be reported to the COR immediately.

Quality Requirements

The Contractor through innovation, technology, or other means, shall perform the required cleaning services at frequencies determined by the Contractor. Performance will be based on the Government’s evaluation of results, not the frequency or method of performance. The evaluation of results will be based on building occupant satisfaction and/or Contracting Officer and/or designee’s inspections. Final results will be the determining factor for the success or failure of this contract. The areas included to be cleaned under this contract include office space and visitor areas.

Requirements:

• All interior space shall be free of obvious dirt, debris, and dust. Glass surfaces shall be clean and free of smudges. No dirt shall be left in corners, behind radiators, under furniture, behind floors, and stair landings and treads. No dirt shall be left where sweepings were picked

up. There shall be no dirt, trash, or foreign matter under desks, tables, or chairs. Furniture shall be free of obvious dust, dirt and debris including rungs and legs. Exhibit displays, bookcases, pictures and overhead pipes shall also be dusted.

• Drinking fountains will be cleaned to be free of water marks, and any other debris or encrustation. Drinking fountains shall be maintained at a high level of sanitation. Metal surfaces in entrances and corridors shall have a polished and lustrous appearance.

• All interior areas under contract shall be policed on each scheduled cleaning day for trash. Trash cans shall be emptied and kept clean and free of dirt, stains and debris. Trash can liners shall be removed and a new liner shall be placed into the container at each emptying process. All collected interior/exterior trash, litter and debris shall be disposed of in plastic bags and removed immediately from the premises by the contractor. Bags of trash shall not be left in passageways or hallways where they may create a safety hazard. The park does recycle and any items that the Contractor deems as fitting the park’s recyclable requirements may be placed in the parks recyclable bin.

• Restrooms will be cleaned and sanitized with a disinfectant cleaner.