(x)
140P2121R0052 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
PWA
Denver CO 80225 P.O.Box 25287 MS WCP NPS, WASO - WCP Contracting
08/02/20210001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
07/23/2021
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
This is a combined synopsis/solicitation for commercial items prepared in accordance with
Sub-Part 12.6, as supplemental with additional information included in this notice.
The purpose of this amendment is to:
1) Respond to questions received by the date and time specified in the solicitation in accordance with the attached Description of Amendment consisting of two pages.
2) Replace "Attachment W_Wage Determinations" in its entirety with the attached document titled "Attachment W_Wage Determinations - 7-21-21".
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Lauren Brauer
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 4
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140P2121R0052/0001
3) Extend the solicitation closing date to:
08/24/2021 at 10:00 AM Eastern. In order to be considered for award, offers shall REACH the
Government contact designated in the solicitation by the time specified in the solicitation or most recent amendment (if applicable).
All amendments must also be read and acknowledged by completing blocks 15A., 15B., and 15C. of the
SF30 for each amendment with the submission of the offer.
All other terms and conditions remain the same.
Legacy Doc #: NPS
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
Description of Amendment
Solicitation No. 140P2121R0052 - First State National Historical Park Plan and Design Signage System
Questions and Answers:
1) Question #1:
Has this same work been completed at this site previously; if so, who was the awarded contractor?
Answer #1:
No. FRST has never had a comprehensive sign master plan, nor has a contract been competed or awarded for this work previously.
2) Question #2:
Page 31 of 82 states: “Engineer: provides engineering detail drawings and certifications for sign elements as required in the scope of work, must be certified in the state where the sign installation will occur.”
On all previous NPS projects, we’ve never seen the request for an engineer. Typically, the engineering calculations and detailed engineering drawings are the responsibility of the chosen signage fabricator. This is beneficial for both the NPS and the chosen fabricator because the responsibility of the structures should be studied and communicated by the contractor that is actually building the signage. In addition, the “engineer" is not even included in the provided fee schedule.
– Can you confirm whether or not an engineer needs to be included in our team? It’s just not common practice to carry this discipline on our design team.
– Can we assume that an engineer will be added during fabrication, not during the design and planning process? Please confirm.
Answer #2:
The government will not require an engineer on the team to provide detailed drawings or certify drawings.
The government will still require detailed drawings for all sign layouts, structures, materials, colors, paints, footer, and other structural components. The drawings should be complete to the extent that a fabricator would have all the information necessary for fabrication, but they may be labeled “Design-Intent” so that the government can require the sign fabricator, and not the offeror on this design contract, to supply engineering.
3) Question #3:
Uniguide Standards vs. Unique Regional FRST Brand:
Generally speaking, it sounds like the RFQ is calling for the FRST sign system to follow the Uniguide signage system. With all of the detail drawings included in the Uniguide package, we always wonder why the NPS projects request all new detail drawings in subsequent packages.This leads us to believe that the system should follow the spirit of the Uniguide, but the sign types may go above and beyond what is included in that signage package. It sounds like there’s a desire to link these 6 sites under one FRST brand.
Can you elaborate or clarify the NPS expectations on where the designer can deviate from the standards, and whether there’s a desire for a slightly unique FRST brand that falls under the umbrella of the NPS brand?
Answer #3:
Ideally, signs for FRST will conform entirely with NPS Standards. However, given that most areas of the park are now owned by the NPS and have operating partners and local ordinances that must be followed, the government recognizes that compromises may have to be made. It will be up to the contractor to propose design solutions where NPS Standards are in conflict with partner or local requirements.
The government will likely seek explanations for any deviations made from NPS sign standards. Decisions made as a result of park partner or local ordinances for design or materials are likely to be accepted. Design decisions made with the sole intent of creating a FRST “brand” may be rejected.
Sign panel layouts are likely to receive the most scrutiny and should conform to NPS standards to the full extent possible. Layouts are expected to be obviously derived from standard NPS layouts and use NPS standard fonts – examples for identity signs are in attachment C – NPD ID Sign Examples with Partner Logos. The government expects deviations from standard panel designs to include the addition of partner logos and possibly use of non-standard colors.
Identity Sign bases are the area offering the most flexibility. Perhaps the designer will propose a standard base configuration as depicted in the NPS Identity Sign Manual (Attachment A) or maybe the designer will take the opportunity to design a base configuration that is more suited to the park’s location and history and to comply with local ordinances.