140P2021R0004 Amend 0002_0002.pdf
PDF 179 KB Posted
- Attached to
- CEBR 163432-CONSTRUCT VISITOR CONTACT STATION Federal contract opportunity
- Solicitation number
- 140P2021R0004
About this file
This document is an amendment to a solicitation for the construction of a visitor contact station. The National Park Service seeks to build a new central point of services for park visitors under solicitation number 140P2021R0004 with a notice to proceed date of March 1, 2021. The amendment provides answers to bidder questions, allows for comparable Assa Abloy products to be offered, increases the page limit for describing management approach to five pages, and confirms March 1 as the target notice to proceed date.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| attachment 7-B08_Solit_Equals_0004.doc | DOC document | |
| 140P2021R0004 Amend 0004_0004.pdf | ||
| Sol_140P2021R0004_Amd_0004.pdf | ||
| Amendment 0003_B08_Solit_PSP_Vol_I_Exp_REQD_0003.docx | DOCX document | |
| 140P2021R0004 Amend 0003_0003.pdf | ||
| Sol_140P2021R0004_Amd_0003.pdf | ||
| Sol_140P2021R0004_Amd_0002.pdf | ||
| Sol_140P2021R0004_Amd_0001.pdf | ||
| 140P2021R0004 Amend 0001_0001.pdf | ||
| NPS CEDAR BREAKS - Final CD Compiled_Drawings.pdf | ||
| SF24 Bid Bond.pdf | ||
| B08_Solit_PSP_Vol_II_GenRefs.doc | DOC document | |
| B08_Solit_PSP_Vol_II_SubKPlanForm_REQD.doc | DOC document | |
| WD UT20200073 dtd 10-30-2020.pdf | ||
| Sol_140P2021R0004.pdf | ||
| 2020.11.24 CEBR specification.pdf | ||
| B08_Solit_140P2021R0004.pdf | ||
| B08_Solit_PSP_Vol_I_PastPerf_12.16.20.docx | DOCX document |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140P2021R0004 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
PDS
Denver CO 80225-0287 P.O. Box 25287 12795 W. Alameda Pkwy DOI, NPS, DSC Contracting Services
PDS
Denver CO 80225-0287 P.O. Box 25287 12795 W. Alameda Pkwy NPS, DSC Contracting Services Div
03/19/20210002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
03/05/2021
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
CEBR 163432-CONSTRUCT VISITOR CONTACT STATION
The purpose of Amendment 0002 is to provide Questions and Answers.
SEE PAGE 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Bai Perney
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
141P2021R0004 Amendment 0002 (Continuation)
Questions and Answers
Q1. The specs for this are written in all Allegion products. Is the owner open to a bid using comparable Assa Abloy products? It is located in Section 08 11 13, 2.01.A.4‐5.
A1. 08 11 13 2.01 Manufacturers does allow for Assa Abloy products to be submitted; see 2.01.A.1.
Q2. Subfactor 3A is limited to 2 pages. Are the subcontractor letters excluded from this page count?
A2. Signed letter of commitment from the subcontractor does not count as the page limit.
Q3. Subfactor 3A asks us to describe our approach to safety, QC, cost control, and schedule management. It also asks us to identify key subs and their relevant prior experience and our experience working with them. That’s a lot to fit on 2 pages. Can you increase the page count for Subfactor 3A to at least 5 pages?
A3. Yes. FACTOR 3 – MANAGEMENT APPROACH‐SUBFACTOR 3A – MANAGEMENT APPROACH general management approach narrative is limited to 5 pages.
Q4. Subfactor 2B says the schedule should be done with the NTP of March 1, but this proposal isn’t due until April 6. Do you still want us to use March 1 as the NTP?
A4. Yes. Use Notice to Proceed date of March 1, 2021 for Subfactor 2B – Schedule.
File details come from the government source that posted it. Updated .