Addendum 0001 Questions with Answers_0001.docx

DOCX document 17 KB Posted

Attached to
PEFO REPLACE HOLBROOK HOUSING ROOFS Federal contract opportunity
Solicitation number
140P1521Q0030
Issued by
Department of the Interior National Park Service Intermountain Region

View the file

Other files for this federal contract opportunity

Other files attached to PEFO REPLACE HOLBROOK HOUSING ROOFS, newest first.
File Type Posted
Addendum 00002 Questions with Answers_0002.docx DOCX document
Sol_140P1521Q0030_Amd_0002.pdf PDF
Holbrook Housing_0002.JPG JPG image
B03 Wage Determination AZ20210027_0001.pdf PDF
Sol_140P1521Q0030_Amd_0001.pdf PDF
B03 Wage Determination.pdf PDF
A04 PEFO_Holbrook Housing Roof Replacement_Statement of Work r1.pdf PDF
Sol_140P1521Q0030.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. Per the RFQ we see a bid guarantee is required. Can you let us know what the liquidated damages are?

A: There are no liquidated damages on this project.

2. The POP says all onsite work to be performed: June 1, 2021 through September 30,2021. So that being said is the POP 120 days?

A. Performance period is 120 days from Notice to Proceed.

3. Per the Wage Decision provided the roofer wages are not provided. Can you provide us with the Wage determination for the roofers?

A: Wage Decision AZ20210027 is added to this project.

4. I have a question / clarification related to the SOW. We are to remove the existing shingles and install new standing seam roofing, however the items listed below are not quantifiable. These items are typically be broken out as unit prices based on your specified unit of measure or through provided plans and specs for the work. Please provide additional details to quote or advise if this section was in error and should be omitted from the SOW. Thank you.

一 b. Inspection – The contractor shall inspect and repair or replace if needed the following:

A. The intent of the government is to reutilize the following items if they are both serviceable and compatible with the new roof system. With that stated, the existing estimated quantities are as follows:

一 i. Sheathing 12,400 sf 一 ii. Roof jacks 72 various roof penetrations/caps and 8 HVAC unit jacks 一 iii. Flashing 400 lf 一 iv. Vent caps 72 various roof penetrations/caps 一 v. Drip edges 1400 lf

A: There are 72 Roof Jacks with flashing and vent caps. Existing sheathing is plywood. 1540' of new gutter has recently been installed so drip edging would be approximately the same.

5. Will the NPS allow any substitution on the metal panel manufacturer specified for this project?

A: Manufacturer may be substituted, specifications for roof must be met.

6. Are there any architectural drawings that can be provided? This would be needed in order to submit to the specified metal panel manufacturer in the scope of work for the water tightness warranty?

A. No architectural drawings are available currently.

7. Would NPS accept a paint finish warranty in lieu of a watertight warranty?

A. Paint finish warranty will need to be reviewed (with additional information) prior to acceptance in lieu of watertight warranty.